16.07.2015 Views

Davangere 38254-053-ind-iee-02.pdf - kuidfc

Davangere 38254-053-ind-iee-02.pdf - kuidfc

Davangere 38254-053-ind-iee-02.pdf - kuidfc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

49Description Contents Schedule ParticipantsModule 1 – Orientation2 days PMU officialsInvestment Program Cycle of NKUSIPinvolved in theADBs Environmental Assessment GuidelinesInvestmentEA requirements of NKUSIPProgramIndian Environmental Laws and Regulations relating toULB officialsurban infrastructure Investment Programinvolved inEnvironmental impacts of urban infrastructure InvestmentNKUSIPProgramsimplementationProgram 1OrientationProgram /Workshop forandImplementingAgency andExecutingAgencyProgram - 2OrientationProgram /Workshop forContractors andSupervisory staffModule 2 Environmental Assessment ProcessInvestment Program categorization as per ADBIEE/EIA process, Formats and ReportsIdentification of Environmental ImpactsIdentification Mitigation MeasuresFormulation of Environmental Management PlanImplementation and MonitoringSummary EIA/IEEsReview of EIA/IEE reports to comply with ADBrequirementsIncorporation of mitigating measures in the InvestmentProgram design and contractsModule 1 Implementation of Mitigation MeasuresEnvironmental issues related urban infrastructure duringconstructionImplementation of mitigation measuresMonitoring of implementation1 day ContractorsinvolvedNKUSIPSupervisorystaff of ULBinProgram - 3ExperienceSharingModule – Experiences and Best PracticesExperiences on implementation in terms of environmentalconcerns of implemented Investment ProgramsBest Practices followed1 day(everyalternativeyear fromthe start ofNKUSIP, i.e.2010)PMU officialsULB officialsLocal NGOsD. Cost Estimates of Environmental Monitoring Plan123. The Contractor’s cost for site establishment, preliminary, construction, and defect liabilityactivities will be incorporated into the contractual agreements, which will be b<strong>ind</strong>ing on him forimplementation. The air quality, surface water quality, and noise level monitoring of constructionand defect liability phases will be conducted by the contractor.124. The operation phase mitigation measures are again of good operating practices, whichwill be the responsibility of KSPCB. The air quality and noise level monitoring during theoperation and maintenance phase will be conducted by the environmental laboratory of KSPCB,therefore there are no additional costs125. The activities identified in environmental monitoring program mainly includes siteinspections and informal discussions with workers and local people and this will be theresponsibility of PMU and DSC with the assistance of DSC, costs of which are part of projectmanagement.126. A preliminary cost estimate has been made for implementation of proposedEnvironmental Monitoring Plan for NKUSIP program in Davanagere city, which is presented inTable 16. The cost will be borne by Contractor/ULB during operation phase. Cost of training

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!