16.07.2015 Views

Davangere 38254-053-ind-iee-02.pdf - kuidfc

Davangere 38254-053-ind-iee-02.pdf - kuidfc

Davangere 38254-053-ind-iee-02.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

43Mitigation Activities /Measures &Parameters to beMonitoredAll construction relatedmitigation measures;Construction sitemanagement plan tocontrol dust and noisenuisance, and roadblocksImplementation ofConstruction sitemanagement plan: dustand noise nuisance atsite; and trafficmaintenanceBeneficial usage ofwaste soil(construction, landraising, infill)Waste soil removal assoon as it is excavatedUsage of tarpaulins tocover soil whentransported on trucksAvoidance of narrowlocal roads whentransporting soilAvoidance oftransporting soil duringpeak traffic periodsCoverage or dampingdown stockpiled soil <strong>ind</strong>ry weatherConduction of allexcavation work in thedry seasonPumping groundwaterfrom excavated areasand provide to farmersLeaving spaces foraccess betweenmounds of soilProvision forplanks/walkways toallow people & vehiclesto cross open trenchesRemoval of trees only ifit cannot be avoidedPlantation andmaintenance of twotrees for every oneremoved*Compensation forbusinesses for lostincomeN.A.Location Monitoring Method Frequency Mitigation /MonitoringResponsibilitySewer layingsites andsurroundingsIncorporation of mitigationmeasures in the contractdocuments Verification of contractdocuments before signing thecontractMonitoring of air quality and noiseis not required. The implementationof mitigation measures (usage ofstandard equipment complying withCPCB Noise Standards forconstruction equipments) andassessment of the situationthrough visual inspection andinterviews with local people shallbe ensured.One-offinspection ofcontractdocumentWeeklyPMUContractor andULB with theassistance ofInvestmentProgramConsultantsAll sites Site observations; CC records Monthly Contractor/PMU/ULB/PCAll sites Site observations Weekly Contractor/PMU/ULB/PCAll sites Site observations Weekly Contractor/PMU/ULB/PCFrom STP Observations off site; CC record Weekly Contractor/PMU/ULB/PCFrom STP Observations on and off site Weekly Contractor/PMU/ULB/PCInhabitedareasSite observations Weekly Contractor/PMU/ULB/PCAll sites Site observations Monthly Contractor/PMU/ULB/PCSTP site Site observations; farmer survey Monthly Contractor/PMU/ULB/PCNetwork sites Site observations Weekly Contractor/PMU/ULB/PCNetwork sites Site observations Weekly Contractor/PMU/ULB/PCAll sites Site observations Weekly Contractor/PMU/ULB/PCAll sites Observations on/off site; CC MonthlyContractor/recordsPMU/ULB/PCWhereverrequiredShopkeeper survey; LSGD record As needed Contractor/PMU/ULB/PC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!