16.07.2015 Views

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

38254-04-ind-iee-01 Haveri.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package I - Dharwad)Tranche I Sub-Projects in <strong>Haveri</strong> CMCInitial Environmental ExaminationSCREENING QUESTIONS Yes No REMARKSB. Potential Environmental ImpactsWill the Project cause…• Pollution of raw water supply from upstreamwastewater discharge from communities,<strong>ind</strong>ustries, agriculture, and soil erosion runoff?• Impairment of historical/culturalmonuments/areas and loss/damage to thesesites?• Hazard of land subsidence caused by excessiveground water pumping?• Social conflicts arising from displacement ofcommunities ?• Conflicts in abstraction of raw water for watersupply with other beneficial water uses forsurface and ground waters?Unsatisfactory raw water supply (e.g. excessivepathogens or mineral constituents)?• Delivery of unsafe water to distributionsystem?• Inadequate protection of intake works or wells,leading to pollution of water supply?Pollution of raw water supplyfrom upstream wastewaterdischarge is not anticipated sinceVarada River, the source of rawwater is flowing through ruralareas. However, pollution due tosoil erosion runoff is anticipated,as the river is flowing throughagricultural areas. Siddeswara temple (protectedmonument) is more than 300 maway from the new raw waterpipe line and hence there will notbe any impact on the protectedmonument. There is no ground waterexploitation for proposed watersupply improvements for <strong>Haveri</strong>CMC. . There is no resettlement of peoplerequired for projectimplementation. Hence there is nopossibility for social conflictrelated with displacement ofpeople. The proposal for <strong>Haveri</strong> CMCinvolves only pumping of surpluswater from River Varada to animpounding reservoir, HeggereLake during monsoon. This willnot reduce the water availabilityin the river for any other uses allthrough the year. The existing raw water supply issupposed to continue. The present project does notinvolve any upgradation /operation maintenance proposalfor Water treatment plant. Thetreatment plant should bemaintained properly by <strong>Haveri</strong>CMC to have the outlet qualitymeeting drinking water standards. The existing intake well at RiverVarada is in good condition sothere is no possibility for pollutiondue to inadequate protection ofintake works / wells.KUIDFCviiWSAPL

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!