16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)8. CONCLUSIONS97. The proposed Investment Program is beneficial to the environment and the society. Theproject falls under the Category B of ADB's Guidelines. From this IEE, it can beunderstood that this Investment Program is of small-scale and does not cause anysignificant adverse environmental impacts and so a full scale EIA is not required. It isrecommended that project can be implemented with proper mitigation measures toprotect the environment. Since the drainage component has very less significant impactson the environment REA checklist for the drainage component is not provided here.This IEE with the recommended institutional requirement and environmentalmonitoring plan becomes the completed EIA. This IEE for the proposed InvestmentProgram meets all the required environmental criteria for subproject selection in EARP.Present status of the project study recommends only IEE for proposed projectcomponents. Therefore, no separate EIA is required.KUIDFC 65 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!