16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Mitigation Activities/Measures& Parameters to be monitoredLocation Monitoring Method MonitoringFrequencyMonitoringResponsibilityshopkeepers and residents of workPMU/ULB/PCConfirmation of location ofinfrastructure and avoid these sitesNetwork sites Site observation; design reports Monthly Contractor/PMU/ULB/PCLocation of water and sewer pipeson opposite sides of roadsNetwork sites Site observation; design reports Monthly Contractor/PMU/ULB/PCIntegration of subprojects toconduct trenching at same timeNetwork sites Site observation; design reports Monthly Contractor/PMU/ULB/PCWork conduction during lighttrafficNetwork sites Site observations; CC records Monthly Contractor/PMU/ULB/PCEnsuring that police provide trafficdiversions when requiredNetwork sites Site observations; CC records Monthly Contractor/PMU/ULB/PCProper planning for transport routesto avoid narrow streets, importantNetwork sites Observations off site: CC record Weekly Contractor/PMU/ULB/PCor fragile buildings, religious andtourism sitesProper planning of work to avoidpeak traffic and mainNetwork sites Site observations; CC records Monthly Contractor/PMU/ULB/PCfestival/tourism seasonAvoidance of using pneumaticdrills near buildings at risk fromNetwork sites Site observations; CC records Weekly Contractor/PMU/ULB/PCvibrationUsage of modern vehicles andmachinery and proper maintenanceAll sites Site observations; CC records Monthly Contractor/PMU/ULB/PCas specifiedConsultation with authorities,custodians of buildings,Network sites Site observations; CC records; resident surveys Monthly Contractor/PMU/ULB/PCcommunities to address key issuesand avoid working at sensitivetimesPreparation and implementation of All sites Site observations; CC records Monthly Contractor/KUIDFC 55 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!