16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NKUSIP (Package II – Belgaum)Potential Negative ImpactsNuisance due to dust and noise;road blocking due to laying ofsewer network; and, increasedtraffic flow due to vehiclemovement for constructionactivities.Traffic disturbance and roadblocking due to laying of sewernetwork and vehicle movementfor construction activities;inconvenience to the localcommunity.Traffic disturbance due to lackof space caused byplacing/dumping of soil on roadand/or if sewers have to belocated in the road itselfTraffic disturbance andvibration due to trucksremoving waste and may causeSignificance & Durationof the ImpactM/TDust generation may besignificant as the dryweather conditionprevails in the town.M/TAs this area is notdensely populated areasthe impacts due toconstruction activitiesmay not be significant.Traffic Management Planfor the construction phasehas to be prepared forrerouting and avoidingslow movement ofvehicles.N/TMitigation MeasuresConstruction material shall be stockpiled to minimizetraffic blockages. In case of excavations for sewer lines inbusy streets such as central areas of the town (marketarea, old town area), adequate arrangements for trafficdiversion including prior intimation and by erectingproper signboard shall be provided.Considering the market and dense residential areas in thecore town area, preparation of construction sitemanagement plan is necessary.Poor performance of the contractor may potentiallyexacerbate these impacts and therefore qualifiedcontractors to be appointed. The contracted work includesthe implementation of construction site management plan,which will address these issues.Construction material shall be stockpiled to minimizetraffic blockages.Poor performance of the contractor may potentiallyexacerbate these impacts and therefore qualifiedcontractors to be appointed. The contracted work includesthe implementation of construction site management plan,which will address these issues.Work shall be planned with town authorities. Work shallbe carried out when traffic is light. It will be ensured thatpolice provide traffic diversions whenever necessary.Workforce shall be increased to finish this work quickly.Routes shall be planned to avoid narrow streets,congested roads, important/fragile buildings, key religious& tourism sites. Work shall be planned to avoid peakTranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)ImplementationResponsibilityPreliminaryCostingContractor Part ofconstruction costsContractor Part ofconstruction costsContractor Part ofConstructionCost.KUIDFC 42 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!