16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Potential Negative ImpactsInconvenience to accessbusiness, residential and otherimmediate facilities for thepublic and impact on livelihood(shop owners/keepers) due toloss of access to business.Inconvenience to public duringtrenching and laying of sewerlines/ pipes along thickcommercial areas and narrowstreets; where public facilitiesare located.Significance & Durationof the ImpactM/TThe access for businessand other facilities alongthe proposed sewer liningareas will be disturbedduring constructionperiod.M/TReduced pedestrian andvehicle access toresidences and businessesMitigation MeasuresDuring construction period, planks / makeshift pathwaysshall be provided along the construction areas for thepublic to access their requirements for residential,shopping and other facilities.Provision of planks is required to maintain accessbusiness. Business and homes must be given prior notice.If there are temporary impacts on incomes, thencompensation procedures must be followed as perResettlement framework.Will compensate any business losses as per theResettlement Framework.• Spaces shall be left for access between mounds ofsoil.• Planks shall be provided to allow people &vehicles to cross trench.• Workforce shall be increased in these areas tofinish work quickly.• Shopkeepers will be informed of work in advanceImplementationResponsibilityPreliminaryCostingContractor Part ofconstruction cost.Construction shall be expedited in the least time frame. Contractor Part ofConstructionCostsActivities requiring maximum access control shall bedone during non-peak hours.Excavation along the road shall be done in such a waythat entire stretch will not be trenched at a time.Traffic management with diversion through alternateroutes will be implemented by providing adequatesignboards.KUIDFC 41 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!