38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc 38254-04-ind-iee-20 Badami.pdf - kuidfc

16.07.2015 Views

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in Badami TMCInitial Environment Examination (IEE)Potential Negative ImpactsEconomic benefits if localpeople are employed inContractor’s workforceO & M ImpactsRecurrence of blockage andleakage problems.Occupational health and Safetyof workers and localsRisk of contaminated water inthe distribution systemPublic health may not improvewithout improved practicesShops may lose small amountsof income if customers’ accessis impeded by network repairworksSignificance &Duration of the ImpactS/PM/TThe existing systemlosses are around 25 %.N/TS/TS/PM/PMitigation MeasuresKeep accident reports and recordsEmployment shall be provided to locals particularlyaffected persons identified in Resettlement PlansThe leak detection and water auditing surveys shall beconducted. The leak restoration time shall be minimized.Provide provision for safety measures in design stage.Training of workers on safety measures to be taken.H&S Plan shall be prepared and operated with samemeasures as used in construction phaseCampaigns shall be conducted to raise awareness ofhealth and environmental sanitation issuesShopkeepers shall be informed of work in advance;planks/ walkways shall be provided and request shall bemade to police to divert traffic if necessary.ImplementationResponsibilityContractorULBULBULBULBULBPreliminaryCostingPart ofConstructionCostPart of O & MCostsPart of O & McostsPart of O & McostsPart of O & McostsPart of O & McostsKUIDFC 39 SPAN

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in Badami TMCInitial Environment Examination (IEE)Table 4.4: Environmental Impacts and Mitigation Measures of Sewerage system in proposed SlumPotential Negative ImpactsLocation and Design ImpactsImpacts on existing utilitiessuch as water supply pipes andcontamination of potable waterNuisance due to leakage /overflowing/over flooding ofsewers.Significance & Durationof the ImpactM/PN/PMitigation MeasuresUGD pipes will be placed 1.5 m below water supplypipelinesRegular maintenance will nullify the impact. Usage ofappropriate maintenance equipment would substantiallyreduce the maintenance time.ImplementationResponsibilityPreliminaryCostingULB Part of DesigncostsULB Part of DesigncostsConstruction ImpactsSewerage connection to Community ToiletsWaste soil due to trenching M/P As above: Waste soil shall be beneficially used inconstruction, land raising and infilling of excavated areasWaste soil may create dustwhen stored or transportedDamage other infrastructuredue to trenchingDisturbance to road users orpublic due to repeated trenchingM/TS/PM/TAs above: Waste soil shall be removed as soon as it isexcavatedAs above: Soil shall be covered with tarpaulins on trucksStored soil shall be covered or damped down in dryweatherLocation of infrastructure shall be confirmed before thecommencement of trenching work or these sites shall beavoidedWater and sewer pipes on opposite sides of roads shall belocated.Subprojects shall be integrated to conduct trenching atsame timeContractorContractorContractorContractorPart ofconstruction costPart ofconstruction costPart ofconstruction costPart ofconstruction costKUIDFC 40 SPAN

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Table 4.4: Environmental Impacts and Mitigation Measures of Sewerage system in proposed SlumPotential Negative ImpactsLocation and Design ImpactsImpacts on existing utilitiessuch as water supply pipes andcontamination of potable waterNuisance due to leakage /overflowing/over flooding ofsewers.Significance & Durationof the ImpactM/PN/PMitigation MeasuresUGD pipes will be placed 1.5 m below water supplypipelinesRegular maintenance will nullify the impact. Usage ofappropriate maintenance equipment would substantiallyreduce the maintenance time.ImplementationResponsibilityPreliminaryCostingULB Part of DesigncostsULB Part of DesigncostsConstruction ImpactsSewerage connection to Community ToiletsWaste soil due to trenching M/P As above: Waste soil shall be beneficially used inconstruction, land raising and infilling of excavated areasWaste soil may create dustwhen stored or transportedDamage other infrastructuredue to trenchingDisturbance to road users orpublic due to repeated trenchingM/TS/PM/TAs above: Waste soil shall be removed as soon as it isexcavatedAs above: Soil shall be covered with tarpaulins on trucksStored soil shall be covered or damped down in dryweatherLocation of infrastructure shall be confirmed before thecommencement of trenching work or these sites shall beavoidedWater and sewer pipes on opposite sides of roads shall belocated.Subprojects shall be integrated to conduct trenching atsame timeContractorContractorContractorContractorPart ofconstruction costPart ofconstruction costPart ofconstruction costPart ofconstruction costKUIDFC 40 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!