38254-04-ind-iee-20 Badami.pdf - kuidfc
38254-04-ind-iee-20 Badami.pdf - kuidfc 38254-04-ind-iee-20 Badami.pdf - kuidfc
NKUSIP (Package II – Belgaum)Tranche II Sub-projects in Badami TMCInitial Environment Examination (IEE)Potential Negative ImpactsEconomic benefits if localpeople are employed inContractor’s workforceO & M ImpactsRecurrence of blockage andleakage problems.Occupational health and Safetyof workers and localsRisk of contaminated water inthe distribution systemPublic health may not improvewithout improved practicesShops may lose small amountsof income if customers’ accessis impeded by network repairworksSignificance &Duration of the ImpactS/PM/TThe existing systemlosses are around 25 %.N/TS/TS/PM/PMitigation MeasuresKeep accident reports and recordsEmployment shall be provided to locals particularlyaffected persons identified in Resettlement PlansThe leak detection and water auditing surveys shall beconducted. The leak restoration time shall be minimized.Provide provision for safety measures in design stage.Training of workers on safety measures to be taken.H&S Plan shall be prepared and operated with samemeasures as used in construction phaseCampaigns shall be conducted to raise awareness ofhealth and environmental sanitation issuesShopkeepers shall be informed of work in advance;planks/ walkways shall be provided and request shall bemade to police to divert traffic if necessary.ImplementationResponsibilityContractorULBULBULBULBULBPreliminaryCostingPart ofConstructionCostPart of O & MCostsPart of O & McostsPart of O & McostsPart of O & McostsPart of O & McostsKUIDFC 39 SPAN
NKUSIP (Package II – Belgaum)Tranche II Sub-projects in Badami TMCInitial Environment Examination (IEE)Table 4.4: Environmental Impacts and Mitigation Measures of Sewerage system in proposed SlumPotential Negative ImpactsLocation and Design ImpactsImpacts on existing utilitiessuch as water supply pipes andcontamination of potable waterNuisance due to leakage /overflowing/over flooding ofsewers.Significance & Durationof the ImpactM/PN/PMitigation MeasuresUGD pipes will be placed 1.5 m below water supplypipelinesRegular maintenance will nullify the impact. Usage ofappropriate maintenance equipment would substantiallyreduce the maintenance time.ImplementationResponsibilityPreliminaryCostingULB Part of DesigncostsULB Part of DesigncostsConstruction ImpactsSewerage connection to Community ToiletsWaste soil due to trenching M/P As above: Waste soil shall be beneficially used inconstruction, land raising and infilling of excavated areasWaste soil may create dustwhen stored or transportedDamage other infrastructuredue to trenchingDisturbance to road users orpublic due to repeated trenchingM/TS/PM/TAs above: Waste soil shall be removed as soon as it isexcavatedAs above: Soil shall be covered with tarpaulins on trucksStored soil shall be covered or damped down in dryweatherLocation of infrastructure shall be confirmed before thecommencement of trenching work or these sites shall beavoidedWater and sewer pipes on opposite sides of roads shall belocated.Subprojects shall be integrated to conduct trenching atsame timeContractorContractorContractorContractorPart ofconstruction costPart ofconstruction costPart ofconstruction costPart ofconstruction costKUIDFC 40 SPAN
- Page 1: Initial Environmental ExaminationDo
- Page 6 and 7: NKUSIP (Package II - Belgaum)Tranch
- Page 8 and 9: NKUSIP (Package II - Belgaum)Tranch
- Page 10 and 11: NKUSIP (Package II - Belgaum)Tranch
- Page 12 and 13: NKUSIP (Package II - Belgaum)Tranch
- Page 14 and 15: NKUSIP (Package II - Belgaum)Tranch
- Page 16 and 17: NKUSIP (Package II - Belgaum)Tranch
- Page 18 and 19: NKUSIP (Package II - Belgaum)Tranch
- Page 20 and 21: NKUSIP (Package II - Belgaum)Tranch
- Page 22 and 23: NKUSIP (Package II - Belgaum)Tranch
- Page 24 and 25: NKUSIP (Package II - Belgaum)Tranch
- Page 26 and 27: NKUSIP (Package II - Belgaum)Tranch
- Page 28 and 29: NKUSIP (Package II - Belgaum)Tranch
- Page 30 and 31: NKUSIP (Package II - Belgaum)Tranch
- Page 32 and 33: NKUSIP (Package II - Belgaum)Tranch
- Page 34 and 35: NKUSIP (Package II - Belgaum)Tranch
- Page 36 and 37: NKUSIP (Package II - Belgaum)Tranch
- Page 38 and 39: NKUSIP (Package II - Belgaum)Tranch
- Page 40 and 41: NKUSIP (Package II - Belgaum)Tranch
- Page 44 and 45: NKUSIP (Package II - Belgaum)Tranch
- Page 46 and 47: NKUSIP (Package II - Belgaum)Potent
- Page 48 and 49: NKUSIP (Package II - Belgaum)Tranch
- Page 50: NKUSIP (Package II - Belgaum) Tranc
- Page 53 and 54: NKUSIP (Package II - Belgaum)Initia
- Page 55 and 56: NKUSIP (Package II - Belgaum)Tranch
- Page 57 and 58: NKUSIP (Package II - Belgaum)Tranch
- Page 59 and 60: NKUSIP (Package II - Belgaum)Tranch
- Page 61 and 62: NKUSIP (Package II - Belgaum)Tranch
- Page 63 and 64: NKUSIP (Package II - Belgaum)Tranch
- Page 65 and 66: NKUSIP (Package II - Belgaum)Tranch
- Page 67 and 68: NKUSIP (Package II - Belgaum)Tranch
NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Table 4.4: Environmental Impacts and Mitigation Measures of Sewerage system in proposed SlumPotential Negative ImpactsLocation and Design ImpactsImpacts on existing utilitiessuch as water supply pipes andcontamination of potable waterNuisance due to leakage /overflowing/over flooding ofsewers.Significance & Durationof the ImpactM/PN/PMitigation MeasuresUGD pipes will be placed 1.5 m below water supplypipelinesRegular maintenance will nullify the impact. Usage ofappropriate maintenance equipment would substantiallyreduce the maintenance time.ImplementationResponsibilityPreliminaryCostingULB Part of DesigncostsULB Part of DesigncostsConstruction ImpactsSewerage connection to Community ToiletsWaste soil due to trenching M/P As above: Waste soil shall be beneficially used inconstruction, land raising and infilling of excavated areasWaste soil may create dustwhen stored or transportedDamage other infrastructuredue to trenchingDisturbance to road users orpublic due to repeated trenchingM/TS/PM/TAs above: Waste soil shall be removed as soon as it isexcavatedAs above: Soil shall be covered with tarpaulins on trucksStored soil shall be covered or damped down in dryweatherLocation of infrastructure shall be confirmed before thecommencement of trenching work or these sites shall beavoidedWater and sewer pipes on opposite sides of roads shall belocated.Subprojects shall be integrated to conduct trenching atsame timeContractorContractorContractorContractorPart ofconstruction costPart ofconstruction costPart ofconstruction costPart ofconstruction costKUIDFC 40 SPAN