16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Potential Negative ImpactsEconomic benefits if localpeople are employed inContractor’s workforceO & M ImpactsRecurrence of blockage andleakage problems.Occupational health and Safetyof workers and localsRisk of contaminated water inthe distribution systemPublic health may not improvewithout improved practicesShops may lose small amountsof income if customers’ accessis impeded by network repairworksSignificance &Duration of the ImpactS/PM/TThe existing systemlosses are around 25 %.N/TS/TS/PM/PMitigation MeasuresKeep accident reports and recordsEmployment shall be provided to locals particularlyaffected persons identified in Resettlement PlansThe leak detection and water auditing surveys shall beconducted. The leak restoration time shall be minimized.Provide provision for safety measures in design stage.Training of workers on safety measures to be taken.H&S Plan shall be prepared and operated with samemeasures as used in construction phaseCampaigns shall be conducted to raise awareness ofhealth and environmental sanitation issuesShopkeepers shall be informed of work in advance;planks/ walkways shall be provided and request shall bemade to police to divert traffic if necessary.ImplementationResponsibilityContractorULBULBULBULBULBPreliminaryCostingPart ofConstructionCostPart of O & MCostsPart of O & McostsPart of O & McostsPart of O & McostsPart of O & McostsKUIDFC 39 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!