16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Potential Negative ImpactsImproper disposal ofBituminous wastePeople will be inconveniencedand their health may be at riskif water supply system is shutdown for long periodSites of social/culturalimportance (schools, hospitals,temples, tourism sites) may bedisturbed by noise, dust,vibration and impeded accessImproper handling of excesssoilWorkers and the public are atrisk from accidents on siteSignificance &Duration of the Impactheavy noise generatingequipment are notenvisaged.M/PN/TN/TN/TN/TMitigation MeasuresBituminous waste shall be disposed in approved wastedisposal sites.Work program shall be planned to keep shutdown tominimum. Alternative water will be provided to affectedresidents. Inform communities of any shutdown inadvance.Buildings at risk from vibration damage shall beidentified and it will be avoided using pneumatic drills orheavy vehicles nearby. Waste shall be removed quickly,covered/sprayed stockpiles, sand shall be imported onlywhen needed and soil/sand on trucks shall be covered.Workforce to finish work quickly. Planks shall be used toallow access (people/vehicles). Relevant authorities,custodians of buildings and local people shall beconsulted to address issues & to avoid work at sensitivetimes. No construction at night and early morning hours.Public will be notified of any loud noise and vibrationsExcess soil shall be disposed in low laying areas otherthan water bodiesA site Health and Safety Plan shall be prepared andimplemented that includes measures to:Exclude the public from all construction sites;Ensure that workers use Personal Protective Equipment;Provide Health & Safety training for all personnel;Follow documented procedures for all site activities; andImplementationResponsibilityContractorContractorContractorContractorContractorPreliminaryCostingPart ofconstructioncostsPart ofConstructionCost.Part ofConstructionCost.Part ofConstructionCost.Part ofConstructionCost.KUIDFC 38 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!