16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Potential Negative ImpactsTraffic disturbance and roadblocking due to laying of watersupply network and vehiclemovement for constructionactivities; inconvenience to thelocal community.Trucks removing waste coulddisrupt traffic and vibrationcould damage fragile buildingsDust and noise fromconstruction activities.Impact on air quality due todust from waste soil andimported sandSignificance &Duration of the ImpactN/TAs this area is notdensely populated areathe impacts due toconstruction activitiesmay not be significant.Traffic ManagementPlan for the constructionphase has to be preparedfor rerouting andavoiding slowmovement of vehicles.N/TN/TDue to dry climaticcondition the dustgeneration may beconsiderable.Major noise generatingactivities such as rockblasting and use ofMitigation MeasuresTraffic management with diversion through alternateroutes will be implemented by providing adequatesignboards.Construction material shall be stockpiled to minimizetraffic blockages.Poor performance of the contractor may potentiallyexacerbate these impacts and therefore qualifiedcontractors to be appointed. The contracted workincludes the implementation of construction sitemanagement plan, which will address these issues.Work shall be planned with town authorities. Work shallbe carried out when traffic is light. It will be ensured thatpolice provide traffic diversions whenever necessary.Workforce shall be increased to finish this work quickly.Routes shall be planned to avoid narrow streets,congested roads, important/fragile buildings, keyreligious & tourism sites. Work shall be planned to avoidpeak traffic, main tourism season.The practices such as spraying of water to arrest dustshall be employed. All equipments used in constructionactivities shall comply with CPCB noise emission norms.Waste soil shall be removed quickly, stockpiles shall becovered with tarpaulins and/or water shall be sprinkled toavoid dust pollution. Sand shall be brought (for backfill)to site when needed.ImplementationResponsibilityContractorContractorContractorPreliminaryCostingPart ofconstructioncostsPart ofConstructionCost.Part ofConstructionCost. .KUIDFC 37 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!