16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Potential Negative ImpactsEnvironmental impacts fromconstruction worker campsInconvenience to accessbusiness, residential and otherimmediate facilities for thepublic and impact onlivelihood due to loss of accessto business.Inconvenience to public duringpipe laying along thickcommercial areas and narrowstreets; where public facilitiesare located.Significance &Duration of the ImpactN/TM/TThe access for businessand other facilities willbe disturbed duringconstruction period.M/TReduced pedestrian andvehicle access toresidences andbusinessesMitigation Measuresecosystems.Where sites/camps are set up, the contractor will see thatproper sanitation (toilets, solid waste management)systems are in place; potable drinking water provided;kerosene to be provided at reduced rates for cooking;gambling, liquor and illicit relationships banned.Contractor will be required (as per his contract) to ensureclean-up of site back to original, pre-project condition.During construction period, planks / makeshift pathwaysshall be provided along the construction areas for thepublic to access their requirements for residential,shopping and other facilities.Will compensate any business losses as per theResettlement Framework. Spaces shall be left for accessbetween mounds of soil. Planks shall be provided toallow people & vehicles to cross trench. Workforce shallbe increased in these areas to finish work quickly.Shopkeepers will be informed of work in advance.Provision of planks is required to maintain accessbusiness. Business and homes must be given prior notice.If there are temporary impacts on incomes, thencompensation procedures must be followed as perResettlement framework.Construction shall be expedited in the least time frame.ImplementationResponsibilityContractorContractorContractorPreliminaryCostingPart ofConstructionCost.Part ofconstruction cost.Part ofconstructioncostsActivities requiring maximum access control should bedone during non-peak hours.KUIDFC 36 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!