16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Table 4.3: Environmental Impacts and Mitigation Measures of Water Supply Rehabilitation in the proposed SlumPotential Negative Impacts Significance &Duration of the ImpactMitigation MeasuresImplementationResponsibilityPreliminaryCostingLocation and Design ImpactsSince the location ofrehabilitation works will be atexisting facilities, and theexisting environment is not asensitive environment,location-specific impacts areN/a. N/a. N/a. N/a.insignificant.Construction ImpactsAdditional amounts of wastesoil due to excavationN/T Soil shall be beneficially used in construction or infill Contractor Part ofConstructionCost.Siltation of surrounding drainsand waterImpact on topography andslope stabilityN/TN/TSilt fences shall be used and sand piles shall be coveredduring monsoon season. Also tarpaulins shall be used tocover dry soil when carried on trucks. Backfilling ofexcavated areas shall be done immediately aftercompletion of the work.Construction activities to avoid steep slopes andlandslide prone areas.ContractorContractorPart ofConstructionCost.Part ofConstructionCost.Disposal of excavatedmaterialsN/TExcessive excavated materials to be disposed atdisignated areaContractorPart ofConstructionCost.Effects on hydrlogy andsedimentationN/TEnsure adequate dry flow (environmental flow) to bereleased downstream as per government requirements (ifexist) and to ensure no impacts on downstreamContractorPart ofConstructionCost.KUIDFC 35 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!