16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Potential NegativeImpactsEconomic benefits if localpeople are employed inContractor’s workforceO & M ImpactsSilting and pollution ofwater bodies due to nonclearanceof constructionwork siteNegative impacts onappearance & deteriorationof environment, if materialfrom drains is piled onadjacent landHealth & Safety ofworkers and the publiccould be at risk duringrepair workSignificance &Duration of the ImpactM/TN/TM/TM/TMitigation Measures- Keep accident reports and records.Contractor should employ at least 50% of workforcefrom communities in vicinity of construction sitesSite clearance shall be ensured before termination ofwork.The silt and debris shall be extracted manually duringcleaning; de-weeding and de-silting of drains; will betransported through mini trucks immediately anddisposed off at approved landfill sites or solid wastemanagement site.Materials from blocked drains will be deposited inmunicipal waste storage bins by Drain cleanersPrepare and operate H&S Plan with same measures asused in construction phaseImplementationResponsibilityContractorPreliminaryCostingPartConstructioncostsofContractor Part ofConstructioncostsULBULBO & M costsO & M costsKUIDFC 34 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!