16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Table 4.2: Environmental Impacts and Mitigation Measures of Drainage Up-gradation in <strong>Badami</strong> Town and the proposed slumPotential NegativeImpactsSignificance &Duration of the ImpactMitigation MeasuresImplementationResponsibilityPreliminaryCostingLocation ImpactsNo location impacts are N/a. N/a. N/a. N/a.envisaged as the scale ofactivity is minimalDesign ImpactsNo loss or encroachment N/a.of cultural or historicalproperties is envisaged. NoN/a. N/a. N/a.impacts are envisaged.Construction ImpactsImproper disposal of siltand debrisM/TThe silt and debris shall be extracted manually duringcleaning; de-weeding and de-silting of drains; will betransported through mini trucks immediately anddisposed off at approved landfill sites or solid wastemanagement site.Bituminous waste shall be disposed in approved wastedisposal sites.Waste/excess soil shall be used in construction, landraising and infilling of excavated areasExcess soil shall be disposed in low laying areas otherthan water bodies.Contractor Part ofConstructioncostsImproper disposal of M/PContractor Part ofBituminous wasteconstruction costsImproper handling of M/PContractor Part ofexcess soil - Excavation ofConstructiontrenches will produce largeCost.amounts of waste soilDust pollution due to M/T Waste soil shall be removed as soon as it is excavated Contractor Part ofexcavation and removal ofSoil & sand shall be covered with tarpaulins when carriedConstructionwaste soil; importation andon trucksCost.storage of sand and otherSand shall be brought to site only when needed.materialStockpiles of loose material stored on site shall becovered or sprayed.Damage to other S/PLocation of water pipes, electricity pylons, etc., will be Design consultant Part ofinfrastructure due todetermined and scheme will be designed to avoid damageConstructionKUIDFC 31 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!