38254-04-ind-iee-20 Badami.pdf - kuidfc
38254-04-ind-iee-20 Badami.pdf - kuidfc
38254-04-ind-iee-20 Badami.pdf - kuidfc
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong> TMCInitial Environment Examination (IEE)Table 4.2: Environmental Impacts and Mitigation Measures of Drainage Up-gradation in <strong>Badami</strong> Town and the proposed slumPotential NegativeImpactsSignificance &Duration of the ImpactMitigation MeasuresImplementationResponsibilityPreliminaryCostingLocation ImpactsNo location impacts are N/a. N/a. N/a. N/a.envisaged as the scale ofactivity is minimalDesign ImpactsNo loss or encroachment N/a.of cultural or historicalproperties is envisaged. NoN/a. N/a. N/a.impacts are envisaged.Construction ImpactsImproper disposal of siltand debrisM/TThe silt and debris shall be extracted manually duringcleaning; de-weeding and de-silting of drains; will betransported through mini trucks immediately anddisposed off at approved landfill sites or solid wastemanagement site.Bituminous waste shall be disposed in approved wastedisposal sites.Waste/excess soil shall be used in construction, landraising and infilling of excavated areasExcess soil shall be disposed in low laying areas otherthan water bodies.Contractor Part ofConstructioncostsImproper disposal of M/PContractor Part ofBituminous wasteconstruction costsImproper handling of M/PContractor Part ofexcess soil - Excavation ofConstructiontrenches will produce largeCost.amounts of waste soilDust pollution due to M/T Waste soil shall be removed as soon as it is excavated Contractor Part ofexcavation and removal ofSoil & sand shall be covered with tarpaulins when carriedConstructionwaste soil; importation andon trucksCost.storage of sand and otherSand shall be brought to site only when needed.materialStockpiles of loose material stored on site shall becovered or sprayed.Damage to other S/PLocation of water pipes, electricity pylons, etc., will be Design consultant Part ofinfrastructure due todetermined and scheme will be designed to avoid damageConstructionKUIDFC 31 SPAN