16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong>TMCInitial Environment Examination (IEE)4.4 Construction Impacts77. Several types of short term/temporary negative impacts upon environment may happenduring construction phase of the project, primarily due to negligent practices.Construction impacts include impacts caused by site clearing, earthworks, machinery,vehicles and workers.4.5 Operation and Maintenance (O & M) Impacts78. Operation and Maintenance (O & M) impacts include impacts arising from theoperation and maintenance activities of the infrastructure facility provided. They areroutine management of operational waste flow; occupational health and safety aspects.4.6 Screening of potential environmental impacts79. Screening of environmental impacts is based on the magnitude and duration of theimpact. The magnitude of the impact may be negligible/moderate/severe – in the orderof increasing degree and impact duration may be temporary/ permanent (Table 4.1).Table 4.1: Screening of potential environmental impactsDuration of ImpactMagnitude (Degree of Impacts)Negligible (N) Moderate (M) Severe (S)Temporary (T) N/T M/T S/TPermanent (P) N/P M/P S/P80. The Table 4.2 presents the magnitude and duration of all four types of possible potentialenvironmental impacts along with required mitigation measures for the proposed urbandrainage components for the <strong>Badami</strong> ULB including the proposed slum under NKUSIP.Tables 4.3 and 4.4 present the magnitude and duration of all four types of possiblepotential environmental impacts along with required mitigation measures for theproposed slum up-gradation components (construction of water supply stand posts;construction of community toilets and provision for sewer connection to communitytoilets) under NKUSIP. The program components will have negligible/moderate andtemporary impacts, which can be mitigated by proper environment friendly measures.KUIDFC 30 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!