38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc 38254-04-ind-iee-20 Badami.pdf - kuidfc

16.07.2015 Views

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in BadamiTMCInitial Environment Examination (IEE)34. c) Roads and Drainage: All the declared slums are well connected with roads. Themain roads and the internal roads are of cement concrete. SSM and RCC precast drainsare provided on either side of the roads in slum. Under this programme, it is proposedto provide WBM with Asphalt and concrete to existing roads, to provide new concreteroad and RCC drains wherever required.2.7 Proposed Improvements for Program Components of Badami TMC2.7.1 Urban Drainage System35. The proposal for this project includes improvement of the natural nallahs and secondarydrains. If it is found necessary, the drains will be covered with slabs to avoid thepossibility of dumping of garbage and other solids largely. The drainage proposal forBadami TMC is presented in Table 2.7.Table 2.7: Proposed Improvement of Drainage SystemSl.NoDescription of worksLengthin Mts1. a) De-silting, removal of debris and vegetation of Nallah no.1 (Avg. nallah width 14 mts) 3000b) Nallah no.1 side protection with construction of un-coursed rubble stone masonry inCC 1:4 including exposed surface pointing etc. (2.0m width & 1.75 m height)2. a) De-silting, removal of debris and vegetation of Nallah no.2. (Avg. nallah width 16 mts) 300b) Providing secondary drains to avoid flooding of nallah no.2 from KSRTC bus stand tojunction of Adda halla with construction of un-coursed rubble stone masonry in CC 1:4including exposed surface pointing, and top covering with RCC slab / deck slab at roadcrossings, etc. (1.0m width & 1.0m height)11513. a) De-silting, removal of debris and vegetation of Nallah no.1 (Avg. nallah width 10.50mts)b) Nallah no. 3 side protection with stone masonry walls with construction of un-coursedrubble stone masonry in CC 1:4 including exposed surface pointing, etc. (3.50m width &1.5m height)c) Providing cross culverts at road crossings 4Source: Concept Report36. The drainage network is along the existing roads. No additional drainage line isproposed, as existing lines will be used. No further difficulties in terrain and majorcrossings are found along the drainage lines.6261470881KUIDFC 19 SPAN

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in BadamiTMCInitial Environment Examination (IEE)37. Disposal of silt and debris from nallah - Site clearance shall be ensured beforetermination of work. The sludge, debris and silt shall be extracted manually duringcleaning, de-weeding and de-silting of drains, will be transported through mini trucksimmediately and disposed off at approved landfill sites or solid waste management site.38. Badami town has partial underground drainage system. The provision of undergrounddrainage system for entire town will reduce or nullify the ground water pollution due toseepage of sullage and sewerage from the existing urban drains. This component isconsidered by KUWS&DB and the work is in progress. Therefore, it is not consideredunder this programme.2.7.2 Slum up-gradation39. As per the inspection of Mahalgatti Shivalaya to Ambedkar Circle Slum and as proposedin CLIP reports, it is proposed to upgrade existing roads, drains, UGD, water supplydistribution, community toilets and streetlights on priority basis. The followingproposals are made for up gradation of declared Slum identified in this programme:i) Water Supply: Providing Public Stand Posts - 30 Nos.ii) Sewerage and Sanitation: Providing Sewer connection to Community Toilets – 5 No.siii) One Chlorination Unitiv) Urban Roads: Providing WBM and Asphalting to the Mud road of 180 mts andproviding new Concrete road to the existing Mud road of 245 mts and providingconcrete road over existing concrete road -200 mtsv) Urban drains: Construction of RCC drains of size 45cm x 75cm for 380 mtr, size of45cm x 60 cm for 380 m and size of 30cm x 30 cm for 632 mts.vi) Community Toilets: Construction of two Community Toilets.vii) Streetlights: Providing street lighting to the 35 electric poles.2.8 Proposed schedule for implementation40. Implementation of the program is scheduled to be within a period of 6 years (FY 2009-10 to FY 2015-16) as directed by KUIDFC. Program works to be completed during thisperiod include strict scheduling, monitoring and implementation on site.KUIDFC 20 SPAN

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong>TMCInitial Environment Examination (IEE)37. Disposal of silt and debris from nallah - Site clearance shall be ensured beforetermination of work. The sludge, debris and silt shall be extracted manually duringcleaning, de-weeding and de-silting of drains, will be transported through mini trucksimmediately and disposed off at approved landfill sites or solid waste management site.38. <strong>Badami</strong> town has partial underground drainage system. The provision of undergrounddrainage system for entire town will reduce or nullify the ground water pollution due toseepage of sullage and sewerage from the existing urban drains. This component isconsidered by KUWS&DB and the work is in progress. Therefore, it is not consideredunder this programme.2.7.2 Slum up-gradation39. As per the inspection of Mahalgatti Shivalaya to Ambedkar Circle Slum and as proposedin CLIP reports, it is proposed to upgrade existing roads, drains, UGD, water supplydistribution, community toilets and streetlights on priority basis. The followingproposals are made for up gradation of declared Slum identified in this programme:i) Water Supply: Providing Public Stand Posts - 30 Nos.ii) Sewerage and Sanitation: Providing Sewer connection to Community Toilets – 5 No.siii) One Chlorination Unitiv) Urban Roads: Providing WBM and Asphalting to the Mud road of 180 mts andproviding new Concrete road to the existing Mud road of 245 mts and providingconcrete road over existing concrete road -<strong>20</strong>0 mtsv) Urban drains: Construction of RCC drains of size 45cm x 75cm for 380 mtr, size of45cm x 60 cm for 380 m and size of 30cm x 30 cm for 632 mts.vi) Community Toilets: Construction of two Community Toilets.vii) Streetlights: Providing street lighting to the 35 electric poles.2.8 Proposed schedule for implementation40. Implementation of the program is scheduled to be within a period of 6 years (FY <strong>20</strong>09-10 to FY <strong>20</strong>15-16) as directed by KUIDFC. Program works to be completed during thisperiod include strict scheduling, monitoring and implementation on site.KUIDFC <strong>20</strong> SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!