16.07.2015 Views

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

38254-04-ind-iee-20 Badami.pdf - kuidfc

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

NKUSIP (Package II – Belgaum)Tranche II Sub-projects in <strong>Badami</strong>TMCInitial Environment Examination (IEE)The storm water drainage in the town is predominantly open and extends to a length of14 Kms. covering 15.38% of the total road length. The details of storm water drain aregiven in Table 2.3.Table 2.3: Details of Storm Water DrainsDrain Type Length in Kms Distribution in %Storm Water DrainsOpen Drains (Pucca) – StoneMasonry10.00 71.43Open Drains (Kutcha) 4.00 28.57Subtotal Drains 14.00 100.00Primary Drain Channels 8.00Source: <strong>Badami</strong> TMCPrimary Drains19. There are 4 primary drains in the form of natural nallahs. They are Nallah No. 1(Addahalla) from Nave Ashraya Colony, Nallah No. 2 from Tippu Nagar and NallahNo.3 from Mahalgatti Shivalaya.<strong>20</strong>. Nallah No.1 (Adda halla): This is the main nallah of the town, which starts fromAshraya nagar having ground level 590 m and end at the boundary of the town atRamdurg nagar having ground level 570 m. The total length of the nallah is 3.0Km.The width of the nallah varies from 4.0m to 24.0m. It is silted heavily and lot of wastematerials are dumped / carried away and stagnated. Also sewer manholes areconstructed in the bed of nallah and projecting above the ground level. The nallah overflows and <strong>ind</strong>ent the areas near the bank of Chalukya nagar on the east of nallah andJanata plot slum and rest of nallah. The traffic flow was stopped during this monsoon atAnand nagar due to the flooding of nallah crossing PWD road.Fig. 2.2: Nallah No. 1 (Addahalla)KUIDFC 13 SPAN

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!