MUNICIPALITY OF SHKODRAStrategic Plan for Economic Development2005 – 2015SHKODRATirana 2006


MUNICIPALITY <strong>of</strong> SHKODRAThis strategic plan has been written by large stakeholdergroups from the Municip<strong>al</strong>ity <strong>of</strong> Shkodra with advice andguidance from the World Bank Group, the Open SocietyInstitute and FLAG. The World Bank Group, Open SocietyInstitute and FLAG do not accept any liability for theaccuracy or content <strong>of</strong> the strategy; they do howevercongratulate the Municip<strong>al</strong>ity for the qu<strong>al</strong>ity <strong>of</strong> their work.Cover design: Kilica GraphicsEditors: Artan Rroji and Dr Iain WilsonPrinting house: M<strong>al</strong>uka shpkCopyright © 2006 Municip<strong>al</strong>ity <strong>of</strong> Shkodra2


Table <strong>of</strong> Contents ........................................................................................................pageAcronyms..............................................................................................................................5I. Introduction ................................................................................................................6II. Preamble......................................................................................................................7III. Importance <strong>of</strong> SPLED for our community...............................................................8IV. Strategic Plan ..............................................................................................................9Philosophy behind Strategic Plan...............................................................................10V. Development <strong>of</strong> Strategic Plan ................................................................................11Guiding principles ......................................................................................................11Methodology...............................................................................................................11Planning process.........................................................................................................12Organisation<strong>al</strong> approach to Plan development ...........................................................13Participation and consultation ....................................................................................13Summary <strong>of</strong> assessment <strong>of</strong> loc<strong>al</strong> economy.................................................................17Perceptions <strong>of</strong> businesses ...........................................................................................18Vision and Go<strong>al</strong>s ........................................................................................................19Expected benefits........................................................................................................20Implementation...........................................................................................................22Organisation<strong>al</strong> approach to Plan implementation.......................................................23Financing <strong>of</strong> Strategic Plan.........................................................................................24VI. Overview <strong>of</strong> Shkodra community ...........................................................................25Geography and topography ........................................................................................25Demography ...............................................................................................................25Municip<strong>al</strong> government................................................................................................28VII. Economic pr<strong>of</strong>ile <strong>of</strong> Shkodra...................................................................................32Natur<strong>al</strong> resources <strong>of</strong> Shkodra region ..........................................................................32Tourism.......................................................................................................................34Labour force ...............................................................................................................35Private businesses in Shkodra.....................................................................................37Services and infrastructure .........................................................................................44VIII. Documentation <strong>of</strong> the Strategic Plan ......................................................................48a. SWOT, consolidated an<strong>al</strong>ysis................................................................................49b. Matrix <strong>of</strong> Plan go<strong>al</strong>s, objectives, programmes and projects..................................513


MUNICIPALITY <strong>of</strong> SHKODRAc. Implementation Matrix <strong>of</strong> the Strategic Plan........................................................ 58e. Project fiches......................................................................................................... 76Annex 1: Acronyms used in the Implementation Matrix............................................ 164Annex 2: Report on ‘Survey on Loc<strong>al</strong>ly Enabling Business Environment’............... 165Annex 3: Methodology used in project prioritisation.................................................. 169Annex 4: Group projects ................................................................................................ 1724


AcronymsDELTAEDCMEDDMFLAGLGISMEsSPLEDSWOTWBDeveloping Enterprise Loc<strong>al</strong>ly through Techniques and AlliancesEconomic Development Commission <strong>of</strong> the Municip<strong>al</strong>ityEconomic Development Department <strong>of</strong> the Municip<strong>al</strong>ityFoundation for Loc<strong>al</strong> Autonomy and GovernanceLoc<strong>al</strong> Government and Public Services Reform Initiative (part <strong>of</strong> the Open SocietyInstitute <strong>of</strong> the SOROS Foundation)Sm<strong>al</strong>l and Medium EnterprisesStrategic Plan for Loc<strong>al</strong> Economic DevelopmentStrengths, Weaknesses, Opportunities and ThreatsWorld Bank5


MUNICIPALITY <strong>of</strong> SHKODRAI. IntroductionA strategy for the Loc<strong>al</strong> Economic Development (LED) <strong>of</strong> various municip<strong>al</strong>ities in Albania hasbeen developed within the framework <strong>of</strong> the programme ‘Developing Enterprise Loc<strong>al</strong>ly throughTechniques and Alliances’ (DELTA). It was implemented during 2004 and 2005 and supported bothfinanci<strong>al</strong>ly and technic<strong>al</strong>ly by the World Bank (WB; Loc<strong>al</strong> Economic Development Department) andthe Institute for an Open Society (SOROS), through the Loc<strong>al</strong> Government and Public ServicesReform Initiative, LGI, Hungary. A strategy for, and in partnership with, each <strong>of</strong> the municip<strong>al</strong>ities <strong>of</strong>Berat, Durres, Korça, Lezha and Shkodra was prepared with the collaboration <strong>of</strong> the Albanian<strong>org</strong>anisation Foundation for Loc<strong>al</strong> Autonomy and Governance (FLAG). The go<strong>al</strong> <strong>of</strong> the programmewas, and continues to be, to develop strategic action plans that will have an impact in the restructuring<strong>of</strong> loc<strong>al</strong> economic development policies at the municip<strong>al</strong> level, especi<strong>al</strong>ly those relating to thedevelopment <strong>of</strong> the private sector in Albania.The methodology employed in DELTA promotes improvement <strong>of</strong> an environment that supports andfacilitates the development <strong>of</strong> business and strengthens capacities and collaboration <strong>of</strong> loc<strong>al</strong> authoritieswith community groups, in gener<strong>al</strong>, and loc<strong>al</strong> businesses, in particular, for the development <strong>of</strong> acommon Vision and a Strategic Plan for Loc<strong>al</strong> Economic Development (SPLED).The Strategic Plan developed by each <strong>municip<strong>al</strong>ity</strong> will serve the purpose <strong>of</strong> institution<strong>al</strong>ising privatepublicpartnerships and developing loc<strong>al</strong> programmes and projects that will lead towards thepreparation <strong>of</strong> an agenda for sustainable development <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong>. Through strengtheninginstitutions, infrastructure and policies that support private enterprises, the projects outlined in eachSPLED will help develop and strengthen Sm<strong>al</strong>l and Medium Enterprises (SMEs) and increase loc<strong>al</strong>employment possibilities while at the same time increase revenues for the municip<strong>al</strong> budget.The framework <strong>of</strong> DELTA enabled loc<strong>al</strong> capacities to be developed through a periodic review <strong>of</strong> theprocess <strong>of</strong> LED planning in order to provide for its sustainable institution<strong>al</strong>isation in the respectiveloc<strong>al</strong> government.6


II.PreambleThe change <strong>of</strong> the politic<strong>al</strong> system in Albania, the transformation <strong>of</strong> the country’s economy, from ahighly centr<strong>al</strong>ised to a free market version, and the opening up <strong>of</strong> its markets and resources to thoseelsewhere in the world, especi<strong>al</strong>ly those in Europe, has introduced a new ch<strong>al</strong>lenge for its communities,particularly its businesses and loc<strong>al</strong> governments, namely the ch<strong>al</strong>lenge <strong>of</strong> building a loc<strong>al</strong> economyand business structure capable <strong>of</strong> adapting to world markets and to competition.During Albania’s transition, the structure <strong>of</strong> its businesses changed and continues to change at boththe nation<strong>al</strong> and loc<strong>al</strong> level. Before transition, large public companies dominated the market, whilenow it is dominated by SMEs. The initiation <strong>of</strong> the decentr<strong>al</strong>isation process, <strong>al</strong>lowing loc<strong>al</strong>governments to have a greater influence in the business environment, has natur<strong>al</strong>ly inclined theinterests <strong>of</strong> SMEs towards loc<strong>al</strong> government policies. Every day, more responsibilities regardingprovision <strong>of</strong> services and creation <strong>of</strong> regulations related to the business environment are beingtransferred from centr<strong>al</strong> to loc<strong>al</strong> government.This economic transformation has brought to the table <strong>of</strong> our Municip<strong>al</strong>ity a new role: to lead theprocess <strong>of</strong> stimulating regeneration and growth <strong>of</strong> the economy and thus provide continuousimprovement in the qu<strong>al</strong>ity <strong>of</strong> life <strong>of</strong> our community, through improving the loc<strong>al</strong> business environmentwith regard to the economy and the competitiveness <strong>of</strong> businesses.Given the current situation, it is becoming more and more clear to our community that great effortshave to be taken in order to define the most important directions needed for successful developmentand marketing <strong>of</strong> our resources in order to create competitive advantages that will sustain the existingbusinesses and attract new ones. This is the only way for our community to use its resources intelligentlyin order to make its economic system successful and sustainable.Of significance in the development <strong>of</strong> this whole process has been the direct engagement <strong>of</strong> the<strong>municip<strong>al</strong>ity</strong> in LED planning, in which it played a leading, coordinative and promotion<strong>al</strong> role. Theprocess has been supported further through our city’s public institutions, its business community andcivic society, and through other partners, with a common effort that has enabled a common vision tobe reached and the most important directions defined for the creation <strong>of</strong> a comfortable environmentfor LED, and one that promotes businesses and increases employment.7


MUNICIPALITY <strong>of</strong> SHKODRAIII. Importance <strong>of</strong> SPLED for our communityThe initiative <strong>of</strong> our <strong>municip<strong>al</strong>ity</strong> to develop a SPLED was carried out within the framework <strong>of</strong>efforts taken in exercising its leg<strong>al</strong> function as a promoter and supporter <strong>of</strong> economic developmentwithin the jurisdiction <strong>of</strong> its territory, aiming to use in the most effective and efficient way possibleits human, natur<strong>al</strong>, soci<strong>al</strong>, institution<strong>al</strong>, financi<strong>al</strong> and physic<strong>al</strong> resources, in order to create a friendlyenvironment for residents, businesses and visitors.The transition process has forced substanti<strong>al</strong> changes to be made in the way the city adapts to thetrends and requirements <strong>of</strong> a successful LED. At the same time, the diversification <strong>of</strong> the loc<strong>al</strong>economy, required for it to fit the demands <strong>of</strong> the free market, and its development dynamics c<strong>al</strong>l foradjustments and re-ev<strong>al</strong>uation <strong>of</strong> the relationship that exists between <strong>municip<strong>al</strong>ity</strong> and community,for building working systems and collaboration structures that will help in the gradu<strong>al</strong> rehabilitationand continuous consolidation <strong>of</strong> a sustainable, he<strong>al</strong>thy economy in our city.In this new situation, in which our <strong>municip<strong>al</strong>ity</strong> is open to internation<strong>al</strong> and nation<strong>al</strong> competition forattracting businesses and creating jobs, it is imperative that efforts are made to define future directions,focusing on and managing well the available resources.Our city government has previously made efforts to find and convince investors to enter our community,but these have <strong>of</strong>ten been sporadic and not well-coordinated with other loc<strong>al</strong>, or sometimes moredistant, factors. In addition, the physic<strong>al</strong> improvement <strong>of</strong> the loc<strong>al</strong> environment, qu<strong>al</strong>ity <strong>of</strong> servicesand financi<strong>al</strong> incentives required to ensure that existing businesses continue and new businessesseek to operate in our city, has been inadequate, because <strong>of</strong> the limited leg<strong>al</strong> authority and financi<strong>al</strong>capacities <strong>of</strong> our <strong>municip<strong>al</strong>ity</strong>.Regardless <strong>of</strong> these difficulties, the role it is playing has <strong>al</strong>ways been increasing in strength, initi<strong>al</strong>lyfrom an observer <strong>of</strong> loc<strong>al</strong> economic development and business performance into an actor activelyinvolved in creating incentives and spaces in direct support <strong>of</strong> business and as a main generator <strong>of</strong>economic growth and employment. The experience <strong>of</strong> the Strategic Plan development has shown usthat only loc<strong>al</strong> government, as the authority in whom the politic<strong>al</strong> and non-politic<strong>al</strong> interests <strong>of</strong>different groups in society come together, can play the major important role in stimulating economicdevelopment, through adopting a new ment<strong>al</strong>ity and work practices and through maintainingrelationships with the actors and <strong>org</strong>anisations that operate in its community.Our community needs a wise loc<strong>al</strong> government, function<strong>al</strong> partnerships and civic pride, and webelieve that the present strategy has laid the foundations for these.8


IV.Strategic PlanThis is the first LED Strategic Plan that has been developed for our <strong>municip<strong>al</strong>ity</strong> and it represents aneffort made to change the qu<strong>al</strong>ity and way <strong>of</strong> governing and the decision-making process.Effective use <strong>of</strong> the economic advantages possessed by our community and attraction <strong>of</strong> privateinvestors depend very much on the qu<strong>al</strong>ity <strong>of</strong> loc<strong>al</strong> governance, the services provided and qu<strong>al</strong>ity <strong>of</strong>the loc<strong>al</strong> policies that are developed and implemented. These have an impact upon the infrastructure<strong>of</strong> the services available for businesses, such as electricity and water supplies, transportation,telecommunications, waste management and urban planning. The fact that most businesses operatingin our <strong>municip<strong>al</strong>ity</strong> are micro-, sm<strong>al</strong>l- or medium-sized, which depend greatly upon the qu<strong>al</strong>ity <strong>of</strong>services <strong>of</strong>fered by the loc<strong>al</strong> government, makes even more important the latter’s role in creating afriendly environment that fosters the development <strong>of</strong> business.This Strategic Plan aims to correct the factors that have had up to now a negative impact on theeconomic development <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong> and on the qu<strong>al</strong>ity <strong>of</strong> loc<strong>al</strong> governance, and by doing so toreduce the barriers and risks <strong>of</strong> doing business here. The planning process helped in assessing thesefactors, and through this procedure an active review <strong>of</strong> the economic base and development factors<strong>of</strong> the <strong>municip<strong>al</strong>ity</strong> was achieved, leading to a better understanding <strong>of</strong> the opportunities for andobstacles to creating economic growth and attracting investors. During this process, our partnersev<strong>al</strong>uated the loc<strong>al</strong> strengths, weaknesses, opportunities and threats (SWOT an<strong>al</strong>ysis), the key factorsthat need to be addressed in order to coordinate sustainable economic development.During the formulation <strong>of</strong> the Strategic Plan, the Planning Commission reviewed the available humanand natur<strong>al</strong> resources, the economic status <strong>of</strong> the city and its surrounding areas, its cultur<strong>al</strong> andhistoric<strong>al</strong> heritage and comparative advantages, and the desires and needs <strong>of</strong> the community.The Law on ‘The Organisation and Functioning <strong>of</strong> Loc<strong>al</strong> Governments’, No. 8652, dated 31.07.2000,Article 10/III, states that ‘… municip<strong>al</strong>ities sh<strong>al</strong>l assume responsibilities for the following exclusivefunctions <strong>of</strong> Loc<strong>al</strong> Economic development … that <strong>of</strong> the preparation <strong>of</strong> programmes for loc<strong>al</strong> economicdevelopment’, making the development <strong>of</strong> a strategic plan a leg<strong>al</strong> obligation for the <strong>municip<strong>al</strong>ity</strong>.The present plan was prepared over a period <strong>of</strong> 16 months. We understand that the desiredimprovements and changes cannot happen within a short time. However, the leadership <strong>of</strong> our<strong>municip<strong>al</strong>ity</strong>, together with the public and private actors, will be devoted to its implementation in themedium term and the making available <strong>of</strong> adequate resources for it to happen as quickly as possible,as this plan is very likely to succeed in achieving its go<strong>al</strong>s.The Strategic Plan was approved by Municip<strong>al</strong> Council through Act No. 60 dated 7 th July 2005.9


MUNICIPALITY <strong>of</strong> SHKODRAPhilosophy behind Strategic PlanThe SPLED <strong>of</strong> our <strong>municip<strong>al</strong>ity</strong> aims to outline the vision and strategic go<strong>al</strong>s the city has for itsdevelopment and to guide and consolidate the efforts made by the <strong>municip<strong>al</strong>ity</strong> and community todevelop an environment that is both supportive and favourable for the development <strong>of</strong> business here.Our SPLED has been designed to address the needs <strong>of</strong> both our leaders and our community to improvethe qu<strong>al</strong>ity and diversity <strong>of</strong> jobs that are available and to improve the qu<strong>al</strong>ity <strong>of</strong> life for our citizensand <strong>of</strong> the environment for the development <strong>of</strong> business.The Municip<strong>al</strong>ity and <strong>al</strong>l the actors involved in the development process began implementing theirvision by focusing on the primary philosophic<strong>al</strong> go<strong>al</strong>s that lie behind the development <strong>of</strong> our SPLED:• Provide for the community and loc<strong>al</strong> government a guiding document for determination <strong>of</strong>future directions <strong>of</strong> economic growth;• Provide an example <strong>of</strong> a strategic decision-making process that incorporates collaborationamong loc<strong>al</strong> politicians and the business community;• Facilitate the efforts for collaboration among public and private partners, for a coordinateddevelopment <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong>;• Establish a decision-making framework for issues such as public services, infrastructure andcollaboration with business;• Establish a new experience and inst<strong>al</strong>l a culture <strong>of</strong> planning economic development;• Create an environment favourable for development and growth <strong>of</strong> existing businesses, becausewe believe that in a community where businesses are dissatisfied there is little chance thatnew businesses will be created;• Influence the financi<strong>al</strong> and technic<strong>al</strong> support policies <strong>of</strong> centr<strong>al</strong> government and donatingagencies;• Give our <strong>municip<strong>al</strong>ity</strong> the appropriate leadership authority required for planning economicdevelopment;• Enable transparent and effective loc<strong>al</strong> governance that responds pr<strong>of</strong>ession<strong>al</strong>ly to the needsand requirements <strong>of</strong> residents and visitors.10


V. Development <strong>of</strong> Strategic PlanThe development <strong>of</strong> the Strategic Plan was completed using the methodology applied by the WorldBank. In using a holistic strategic planning process it is important to achieve an inclusive agreementwhere economic, soci<strong>al</strong> and environment<strong>al</strong> needs are b<strong>al</strong>anced.Guiding principlesThe principles that guided the Municip<strong>al</strong>ity and the Planning Commission during the formulation <strong>of</strong>the Strategic Plan include the following:• Economic success is b<strong>al</strong>anced with qu<strong>al</strong>ity <strong>of</strong> life;• Economic growth is b<strong>al</strong>anced with soci<strong>al</strong> and environment<strong>al</strong> requirements;• The <strong>municip<strong>al</strong>ity</strong> is a key factor in improving the loc<strong>al</strong> investment climate;• Collaboration among municip<strong>al</strong> government, businesses and civic society is a key elementin sustaining economic progress;• Strategic planning is a holistic integrated process, institution<strong>al</strong>ised in the <strong>municip<strong>al</strong>ity</strong>;• SPLED determines the main directions for economic development, but doesn’t control it;• Improvement <strong>of</strong> the entire business environment is targeted, not simply individu<strong>al</strong> businesses;• Protection and support for existing businesses is as important as attraction <strong>of</strong> new businesses,as they act as a very good marketing tool for promoting the business climate;• Development <strong>of</strong> employment using intern<strong>al</strong> resources is more important than creatingemployment through extern<strong>al</strong> factors;• Establishing Public-Private partnerships in decision-making and in improving the loc<strong>al</strong>economy is important;• The private sector is the main generator <strong>of</strong> economic development.MethodologyOur municip<strong>al</strong> government considers SPLED as the best and most systematic method available formanagement <strong>of</strong> change, for ensuring consensus <strong>of</strong> the community and for generating a commonvision for a better economic future. The strategic planning process enabled the coordination <strong>of</strong> effortsand resources that will lead towards improvement <strong>of</strong> the economic situation and, consequently, the11


MUNICIPALITY <strong>of</strong> SHKODRAestablishment <strong>of</strong> a framework that aims to create a he<strong>al</strong>thy well-b<strong>al</strong>anced environment for the economyand an improved qu<strong>al</strong>ity <strong>of</strong> life for the citizens. Although outlined here very simply, this methodologywas found to be very complex given the amount <strong>of</strong> effort and decision making required.The strategic planning process was accompanied by capacity building and facilitation activities. Forcapacity building purposes, DELTA <strong>org</strong>anised a study tour to Hungary where three workshops wereheld on the following topics:• Stages and techniques for development <strong>of</strong> SPLED;• Institution<strong>al</strong> structure for development, implementation and monitoring <strong>of</strong> SPLED inpartnership with the community;• Introduction <strong>of</strong> region<strong>al</strong> best practices in SPLED;• Methodology <strong>of</strong> development and assigning <strong>of</strong> priorities to projects.Planning processThe foundation <strong>of</strong> an effective strategic planning process rests upon a sound understanding <strong>of</strong> themost important issues that face the community. The issue <strong>of</strong> economic development could be outlinedas one <strong>of</strong> problems to be solved, needs to be addressed and capabilities to be employed. The processapplied here enabled the unification <strong>of</strong> the opinions and choices <strong>of</strong> loc<strong>al</strong> government with those <strong>of</strong>businesses and other representative agencies.The planning process was structured to be undertaken in five phases:1. Organisation <strong>of</strong> the efforts;2. Ev<strong>al</strong>uation <strong>of</strong> the competitiveness <strong>of</strong> the loc<strong>al</strong> economy;3. Development <strong>of</strong> the strategy;4. Implementation <strong>of</strong> the strategy;5. Revision <strong>of</strong> the strategy.Over the planning process period a number <strong>of</strong> consultations, ev<strong>al</strong>uations and common decisionmakingevents relating to the presentation and priority <strong>of</strong> the key issues for economic developmentwere considered.At moment <strong>of</strong> writing, the <strong>municip<strong>al</strong>ity</strong> has completed the first three phases and has now entered thefourth.12


Organisation<strong>al</strong> approach to Plan developmentThe <strong>org</strong>anisation<strong>al</strong> approach that was applied <strong>al</strong>lowed in the decision-making process the direct andinstitution<strong>al</strong>ised participation <strong>of</strong> a wide group <strong>of</strong> people representing the community <strong>al</strong>ong with themayor, members <strong>of</strong> city council and the municip<strong>al</strong> staff.The participation was institution<strong>al</strong>ised and structured through the LED Planning Commissionestablished and headed by the Mayor. The role <strong>of</strong> the Commission was to draft and review theStrategic Plan and this responsibility continues with supervision and ev<strong>al</strong>uation <strong>of</strong> the plan’simplementation. The structure <strong>of</strong> the Commission was laid out in such a way as to <strong>al</strong>low the grouping<strong>of</strong> the member base according to field <strong>of</strong> development and interest.A cruci<strong>al</strong> element in this structure was and remains the Core Team, headed by the EconomicDevelopment Department <strong>of</strong> the Municip<strong>al</strong>ity (EDDM) and in which the business community hadone representative. The Core Team played a cruci<strong>al</strong> role in coordinating the work <strong>of</strong> the commissionmembers with the DELTA partners and other loc<strong>al</strong> and centr<strong>al</strong> agencies and <strong>org</strong>anisations interestedin and committed to the development <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong>.The four people on the Core Team each headed a team established to obtain direct input <strong>of</strong> thecommunity in the LED planning process, as follows:• Civic Society Team, led by Ridvan Sokoli• Business Team, led by Simon Prendi• Public Agencies Team, led by Ahmet Omi• Community Team, led by Frederik ShirokaParticipation and consultationFormulation <strong>of</strong> the Strategic Plan document was the main aim <strong>of</strong> the Municip<strong>al</strong>ity, but it aimed toinvolve in the planning process other actors who would have a decisive role in developing the strategy.It would have been impossible for our loc<strong>al</strong> government to carry out the whole process <strong>al</strong>one. Therefore,it was necessary <strong>al</strong>so to involve the expertise <strong>of</strong> other people from the community who could bring tothe process a wide range <strong>of</strong> experiences, ensuring that the most able individu<strong>al</strong>s in the communityhad the chance to present their opinions and preferences to address the most critic<strong>al</strong> issues involvedin loc<strong>al</strong> growth and economic development.In <strong>al</strong>l, 143 people were directly involved in the planning process, including representatives <strong>of</strong> loc<strong>al</strong>government, the business community, banks, education<strong>al</strong> institutions, including the university, public13


MUNICIPALITY <strong>of</strong> SHKODRAEconomic Development Commission <strong>of</strong> theMunicip<strong>al</strong>ity (EDCM) <strong>of</strong> ShkodraHead <strong>of</strong> CommissionMayorMr Artan HaxhiMembers <strong>of</strong> Municip<strong>al</strong>CouncilEconomicDevelopmentDepartment<strong>of</strong> Municip<strong>al</strong>ity(EDDM)Deputy MayorsVoltana AdemiRudolf RashaCore TeamRidvan SokoliSimon PrendiFrederik ShirokaAhmet OmiWorking TeamsBusiness Team Community Team Civic Society Team Public Agencies Team14


enterprises, NGOs and other individu<strong>al</strong>s acknowledged in the community for their levels <strong>of</strong> expertiseand contribution to society.The <strong>municip<strong>al</strong>ity</strong> made a great effort to keep engaged and focused throughout the process this largegroup <strong>of</strong> actors, who voluntarily gave priceless assistance in formulating the Strategic Plan draft.As a result <strong>of</strong> this inclusiveness, the direct involvement <strong>of</strong> people outside <strong>of</strong> loc<strong>al</strong> government whoparticipated in the process gave full loc<strong>al</strong> ownership to the Strategic Plan.List <strong>of</strong> participants:Public Agencies TeamFerid Hoti, ParliamentarianAstrit Bushati, ParliamentarianMahir Hoti, Rector <strong>of</strong> Shkodra UniversityTonin Gjuraj, Municip<strong>al</strong> CouncilMyzafer Kraja, Directorate <strong>of</strong> Food andAgricultureAstrit Beci, Directorate <strong>of</strong> Public He<strong>al</strong>thcareMaxhid Cungu, Marubi Museum andPhotograph ExhibitionElnar Dervishi, Municip<strong>al</strong>ityTeuta Haxhi, Municip<strong>al</strong>ityVehbi Gruda, Municip<strong>al</strong>ityAfrida Damnori, Region<strong>al</strong> CouncilBardh Shllaku, PrefectureMerita Kazazi, Region<strong>al</strong> CouncilFatmir Tepelia, Region<strong>al</strong> CouncilEngjell Gjondrekaj, City Water SupplyEnterpriseArben Haveri, Chamber <strong>of</strong> CommerceAgron Ramadani, Roads and Drains EnterpriseIsmet Hoxha, Loro Boriçi Footb<strong>al</strong>l ClubGëzim Mema, Multi-sports ClubSadetin Taipi, Marin Barleti LibraryMensur Bushati, Public Enterprises ServiceOfficeAgron Dizdari, Migjeni TheatreSurri Rregjimi, AlbtelecomLindita Shiroka, Post OfficeGjokë Miri, Directorate <strong>of</strong> Taxes and ChargesFiqiret Bushati, Directorate <strong>of</strong> Primary He<strong>al</strong>thServiceOsman Dashi, Region<strong>al</strong> Directorate <strong>of</strong> Strad<strong>al</strong>,Public TransportationVioleta Staka, Directorate <strong>of</strong> Public InsuranceBujar Golemi, KESHViktor Jubani, Region<strong>al</strong> Environment AgencyEqerem Dushi, Directorate <strong>of</strong> Food andAgriculture in ShkodraMunire Mandia, Directorate <strong>of</strong> Food andAgriculture in ShkodraEngjëll Çeka, Shkodra Branch <strong>of</strong> CustomsSokol H<strong>al</strong>iti, Region<strong>al</strong> Employment DirectorateSuela Mema, Property Registration OfficeNathan B<strong>org</strong>ford-Parnel, PCV-USAFlorian Borshi, Cleaning EnterpriseXhel<strong>al</strong> Smajli, Municip<strong>al</strong>ityMarije Duoda, Municip<strong>al</strong>ityElena Zorba, Municip<strong>al</strong>ityNexhat Grezda, Municip<strong>al</strong>ityAlfred Luleta, Municip<strong>al</strong>ityKujtim Domnori, Municip<strong>al</strong>ityV<strong>al</strong>bona Qehaja, Municip<strong>al</strong>ityLudovik Vuka, Municip<strong>al</strong>ityAlket Kadrija, Municip<strong>al</strong>ityEva Poja, Municip<strong>al</strong>ityAndi Cungeli, Municip<strong>al</strong>ityBehar Fejza, Municip<strong>al</strong>ityLedia Dushi, Municip<strong>al</strong>ityYmer Vizi, Municip<strong>al</strong>ity15


MUNICIPALITY <strong>of</strong> SHKODRA16Bepin Kurti, Municip<strong>al</strong>ityNazmi Berhani, AlbtelekomSkender H<strong>al</strong>ili, Greening EnterpriseAgron Shima, Radio ShkodraBerti Stoja, City Water Supply EnterpriseKujtim Alia, Children’s Culture CentreBesim Dyca, Municip<strong>al</strong>ityGjon Nika, Municip<strong>al</strong>ityHare Bil<strong>al</strong>, Municip<strong>al</strong>ityTahir Sadiku, Directorate <strong>of</strong> Primary He<strong>al</strong>thServiceOsman Deltina, City Water Supply EnterpriseReshat Zaganjori, Children’s Culture CentreZija Vukaj, Shejnaze Juka SchoolXhem<strong>al</strong> Shqau, City Cleaning EnterpriseBusiness TeamSabri Bushati, City CouncilMusa Heta, City CouncilEdlira Tukaj, University <strong>of</strong> ShkodraOlsi Kabashi, Municip<strong>al</strong>ityPjeter Kakia, Dafinor LtdShkelqim Kopliku, Progres-Met<strong>al</strong> G.Gjov<strong>al</strong>in Guli, G&S Ltd.Fehmi Golemi, Green Shoe Ltd.Petrit Stefa, Public Transportation CompanyAgron Çuliqi, Cable factoryFatmir Lishi, Sig<strong>al</strong> InsuranceZef Gjini, Gjini Ltd.Ilir Shurdha, Ilira Ltd.Sokol Hoxha, Inform Shkodra TravelTish Martini, Western Union Ltd.Hedi Teli, Casu<strong>al</strong> Ltd.Mehdi Shabani, Construction companySenida Kruja, Pro-Credit BankLirije Vorfa, Raiffeisen BankArtur Luka, Tirana BankQem<strong>al</strong> Sylja, United Albanian BankAnton Leka, Chamber <strong>of</strong> CommerceSadije Bushati, University <strong>of</strong> ShkodraArjeta Troshani, University <strong>of</strong> ShkodraEmirjeta Bejleri, University <strong>of</strong> ShkodraBrilanda Bushati, University <strong>of</strong> ShkodraJulinda Sokoli, University <strong>of</strong> ShkodraDrita Kruja, University <strong>of</strong> ShkodraAdem Bekteshi, University <strong>of</strong> ShkodraYlber Berhani, Commerci<strong>al</strong> BankCivic Society TeamArdita Boriçi, University <strong>of</strong> ShkodraBlerta Spahia, University <strong>of</strong> ShkodraZemaida Moz<strong>al</strong>i, Municip<strong>al</strong>ityAngjelina Shllaku, Municip<strong>al</strong>ityShpetim Quku, GTZGjon Shllaku, Preng Jakova AssociationFilip Guraziu, MESHBUSHGjenarin Shantoja, Region<strong>al</strong> DevelopmentAgencyTerezina Hila, OXFAMAnila Trebicka, Women in DevelopmentRidvan Troshani, TEULEDAAlma Kurti, ASDILuigj Mila, Peace and JusticeKastriot Faci, The DoorRikard M<strong>al</strong>aj, The DoorRasim Suma, Shkodra Association forProtection <strong>of</strong> Fishery ResourcesMerzuk Hoxha, Association <strong>of</strong> ShkodraHygienistsFilip Vila, European Children’s TrustZenepe Dibra, Shkodra Intellectu<strong>al</strong> WomenDiana Bejko, REC ShkodraAndi Cekaj, Albanian Red Cross, ShkodraAntoneta Pero, Centre for Handicapped PeopleFerid Lluja, Riza Pasha SocietyAldo Ferreti, COOPVildan Tufi, Sports for AllAleks Dushi, AFFDMaranaj Marku, MALTESERXhabir Mehmeti, Hunters’ AssociationShaqir Ramadani, Hunters’ AssociationMigena Pengili, REC Shkodra


Community TeamAhmet Bushati, Former Chairman, City CouncilVili Kamzi, HistorianSherafet Kruja, EconomistAgustin Jubani, EconomistKarlo Kamsi, HydrologistIsa Alib<strong>al</strong>i, Culture speci<strong>al</strong>istFatos Gjyrezi, City CouncilEduard Grishaj, City CouncilQamil Gjyrezi, City CouncilDashamir Dini, City CouncilAnton Gurakuqi, PhysicianMerita Dibra, Municip<strong>al</strong>ityAnol Dedja, Municip<strong>al</strong>ityArtan Kolnikaj, LawyerSummary <strong>of</strong> assessment <strong>of</strong> loc<strong>al</strong> economyThe current condition <strong>of</strong> the loc<strong>al</strong> economy in Shkodra was subject to a SWOT (Strengths, Weaknesses,Opportunities and Threats) an<strong>al</strong>ysis, which considered the basic economic and soci<strong>al</strong> data and theloc<strong>al</strong> views expressed in a business survey and those <strong>of</strong> the Planning Commission.The data gathered included statistics and information relating to the loc<strong>al</strong> natur<strong>al</strong>, human and financi<strong>al</strong>resources, the structure <strong>of</strong> the economy and businesses, level and structure <strong>of</strong> employment andeducation and qu<strong>al</strong>ifications <strong>of</strong> the work force.During the development <strong>of</strong> the SWOT an<strong>al</strong>ysis, the Planning Commission included a sector an<strong>al</strong>ysiscarried out by the working teams. SWOT an<strong>al</strong>ysis was used as the base platform for the development <strong>of</strong>the Strategic Plan. An<strong>al</strong>ysis <strong>of</strong> the loc<strong>al</strong> situation was continued by the Planning Commission members,which identified the main economic growth advantages and ch<strong>al</strong>lenges facing our community.The information database was arranged into five sections: demography, business, culture and sports,infrastructure and environment, as follows:DEMOGRAPHY• Population• Education• Employment• Soci<strong>al</strong> care• Shelter• He<strong>al</strong>thcareBUSINESS• Business an<strong>al</strong>ysis• Questionnaire database• Imports• Tourism• Business trainingprojectsINFRASTRUCTURE• Urban roads• Water supply• Construction permits• Urban studies• Electricity supply• TelecommunicationsCULTURE & SPORTS• Culture and Sportsinstitutions• Infrastructure <strong>of</strong>institutions• Activities• ProjectsENVIRONMENT• Air qu<strong>al</strong>ity• Water resources• Environment conditions• Shkodra Lake• Greening <strong>of</strong> city• Cleaning <strong>of</strong> city17


MUNICIPALITY <strong>of</strong> SHKODRAFive meetings relating to the SWOT an<strong>al</strong>ysis were held in May 2004, one for each <strong>of</strong> the sectionsreferred to above, while a further addition<strong>al</strong> meeting was subsequently held to undertake an over<strong>al</strong>lcomprehensive SWOT an<strong>al</strong>ysis.The main findings <strong>of</strong> the an<strong>al</strong>ysis were as follows:Main advantages• Geographic<strong>al</strong> position: main administrative and business centre in North Albania, and closeto a nation<strong>al</strong> border;• Easy access into nation<strong>al</strong> and internation<strong>al</strong> transportation network;• Existence <strong>of</strong> unique natur<strong>al</strong> resources and large water resources;• Continuous demographic growth and a young work force;• Space for development <strong>of</strong> business parks.Main ch<strong>al</strong>lenges• Lack <strong>of</strong> favourable climate and image to attract businesses;• Low standard <strong>of</strong> living;• Lack <strong>of</strong> diversified economy and existence <strong>of</strong> outdated technology;• Loc<strong>al</strong> businesses have limited connections to nation<strong>al</strong> and internation<strong>al</strong> markets;• Poor urban infrastructure and poor qu<strong>al</strong>ity public services;• Economy that provides insufficient qu<strong>al</strong>ity and diversity <strong>of</strong> goods and services.Perceptions <strong>of</strong> businessesLoc<strong>al</strong> governments have a mandate to promote the development <strong>of</strong> loc<strong>al</strong> SMEs. However, this mandateis considered by the private sector to be leg<strong>al</strong>ly restrictive, especi<strong>al</strong>ly with regard to the provision <strong>of</strong>resources to undertake business activities.To investigate this issue further and to understand the concerns <strong>of</strong> loc<strong>al</strong> businesses in more detail asurvey was carried out in the city. The go<strong>al</strong> <strong>of</strong> the survey was to collect information and gather theviews <strong>of</strong> the business community on the loc<strong>al</strong> economic situation, the prospects <strong>of</strong> doing businesshere, the conditions and regulations that affect the growth <strong>of</strong> loc<strong>al</strong> businesses, the policies and practicesthat hinder the growth <strong>of</strong> existing businesses and the demands and needs <strong>of</strong> the community for animprovement in the business environment.18


The Business Environment survey was carried out in March and April 2004 and 79 businesses fromdifferent categories participated.The main perception <strong>of</strong> businesses is that loc<strong>al</strong> governments do not have the appropriate means orauthority to assist the development <strong>of</strong> SMEs. This perception is enhanced by lack <strong>of</strong> communicationand poor di<strong>al</strong>ogue between loc<strong>al</strong> government and business.Businessmen in Shkodra take a s<strong>of</strong>ter view on this issue than do businessmen elsewhere in Albania,though they think discussions with loc<strong>al</strong> authorities have <strong>of</strong>ten been overly theoretic<strong>al</strong> and not followedup by concrete action (OECD 2003: Albania – Enterprise Policy Performance Assessment).During discussions, business people expressed the desire for more financi<strong>al</strong> resources to be madeavailable for loc<strong>al</strong> authorities to increase their capacity and possibilities to promote economicdevelopment in Shkodra.Inclusion <strong>of</strong> the opinions <strong>of</strong> loc<strong>al</strong> businesses in the formulation <strong>of</strong> the Strategic Plan was an importantstep in initiating the decision-making process. Through this step the opinions <strong>of</strong> a group <strong>of</strong> peoplethat have the biggest influence on the economic growth <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong> was considered.Vision and Go<strong>al</strong>sVisionThe purpose <strong>of</strong> generating a vision for our loc<strong>al</strong> economic development was to enable our communityto articulate where it wants to be in the future and to choose the path it would like to follow to getthere. The vision will provide for the citizens and loc<strong>al</strong> government a clear idea <strong>of</strong> what has to bedone and how to concentrate their energies and resources.The vision was developed by the Economic Planning Commission (EDCM), after consulting differentsegments <strong>of</strong> the community and after it had been presented publicly through the loc<strong>al</strong> media. The aimwas to generate a vision that could be developed and accepted by as many actors and interest groups aspossible, and which would provide a thorough description <strong>of</strong> the preferred economic future <strong>of</strong> our city.A vision in this context is an ide<strong>al</strong>, which has its roots in the natur<strong>al</strong>, geographic, economic, historic<strong>al</strong>and cultur<strong>al</strong> re<strong>al</strong>ity <strong>of</strong> the region. It aims to capture the expectations and aspirations <strong>of</strong> a community,and define a clear direction for the development <strong>of</strong> its city. We believe that in our case the visionsummarises re<strong>al</strong>istic<strong>al</strong>ly the desires and capacities <strong>of</strong> our community. We aim to share this visioncontinu<strong>al</strong>ly with various groups from our community, so that it becomes widely known and acceptedand thus becomes a guide in making the ide<strong>al</strong> a re<strong>al</strong>ity.19


MUNICIPALITY <strong>of</strong> SHKODRA20Our vision will be re-ev<strong>al</strong>uated by the community, including the decision-makers in loc<strong>al</strong> government,in order for it to reflect on any necessary changes, new desires and circumstances and recentev<strong>al</strong>uations.Go<strong>al</strong>sDetermination <strong>of</strong> LED go<strong>al</strong>s helps us to take decisions about the ways and means <strong>of</strong> achieving thechanges we need. Even though some <strong>of</strong> the go<strong>al</strong>s and actions required are not directly related tocreating jobs or to attracting new businesses, the future <strong>of</strong> our community is based on sound foundationssuch as level <strong>of</strong> education and qu<strong>al</strong>ity <strong>of</strong> life, city infrastructure and municip<strong>al</strong> services. In our view,businesses do not develop and flourish in and are not attracted to communities that do not <strong>of</strong>feradequate levels and qu<strong>al</strong>ity <strong>of</strong> infrastructure and services required by a he<strong>al</strong>thy business environment.In order to achieve its LED go<strong>al</strong>s, our city is focused on accessing its natur<strong>al</strong> and human resources.In order to develop the go<strong>al</strong>s, the Planning Commission considered the opportunities and threatsfacing the <strong>municip<strong>al</strong>ity</strong>, its history <strong>of</strong> economic<strong>al</strong> development and that <strong>of</strong> the region.LED go<strong>al</strong>s express the main directions in which the development <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong> will follow, andare listed on the next page according to importance to LED and to the creation <strong>of</strong> a favourableenvironment. They are developed through careful an<strong>al</strong>ysis <strong>of</strong> the vision and de<strong>al</strong> with issues cruci<strong>al</strong>to the development <strong>of</strong> the city.Expected benefitsThe benefits expected as a result <strong>of</strong> the implementation <strong>of</strong> our Strategic Plan are multiple, but themost important are the following:• Provision <strong>of</strong> guidance to the municip<strong>al</strong> council and administration during the annu<strong>al</strong> andmid-term budget preparation process, <strong>al</strong>lowing for focus on the implementation <strong>of</strong> the projectsincluded the SPLED;• Focus applied to the human and financi<strong>al</strong> resources available in the areas identified,maximizing the benefits and making it possible to achieve the go<strong>al</strong>s and objectives <strong>of</strong> theSPLED;• Strengthened sustainable partnership in decision-making, with co-financing provided by loc<strong>al</strong>government and the business community;• Increase in capacities <strong>of</strong> the municip<strong>al</strong> administration, especi<strong>al</strong>ly <strong>of</strong> the EDDM;• Coordination <strong>of</strong> activities <strong>of</strong> <strong>org</strong>anisations and agencies responsible for implementation <strong>of</strong>different parts <strong>of</strong> the SPLED;


VISIONShkodra will be an important economic, education<strong>al</strong> and region<strong>al</strong> exchange centre that will develop in harmony with the city's history,culture and people, becoming, with its outstanding natur<strong>al</strong> environment, an attractive place in which to live and work and to visitGo<strong>al</strong> 1:Shkodra with an attractive loc<strong>al</strong> economyand dynamic business environment, wheresupport and encouragement is provided tothe production, trade, tourism and servicebusinesses operating successfully within theregion<strong>al</strong> marketsGo<strong>al</strong> 2:Development and preservation <strong>of</strong>the cultur<strong>al</strong>, historic<strong>al</strong> and artistictraditions and v<strong>al</strong>ues <strong>of</strong> Shkodraand their promotion to the benefit<strong>of</strong> tourism developmentGo<strong>al</strong> 4:A city with qu<strong>al</strong>itative contemporarystandards <strong>of</strong> infrastructure and publicservices that stimulate and supportsustainable development <strong>of</strong> the loc<strong>al</strong>economy in harmony with the environmentGo<strong>al</strong> 3:The city as a higher education centre forNorth Albania, with its university as a keyfactor in creating an educated workforcethrough increasing and improving the level<strong>of</strong> academic and pr<strong>of</strong>ession<strong>al</strong> educationGo<strong>al</strong> 5:Achieve for Shkodra's residents ahe<strong>al</strong>thier lifestyle with promotion <strong>of</strong>sports, improvement <strong>of</strong> the city'ssports facilities and improved accessto he<strong>al</strong>th and soci<strong>al</strong> services21


MUNICIPALITY <strong>of</strong> SHKODRA22• Provision <strong>of</strong> a re<strong>al</strong>istic c<strong>al</strong>endar for the implementation <strong>of</strong> the SPLED;• Identification <strong>of</strong> the expected results;• Development <strong>of</strong> an efficient system <strong>of</strong> communication between the Municip<strong>al</strong>ity and itspartners;• Facilitation <strong>of</strong> marketing <strong>of</strong> the potenti<strong>al</strong> for and the possibilities <strong>of</strong> doing business here;• Establishment <strong>of</strong> a monitoring system in collaboration with the community in order to followup on the completion <strong>of</strong> activities and the ev<strong>al</strong>uation <strong>of</strong> the results anticipated in the SPLED;• Improvement in the management system in the Municip<strong>al</strong>ity in the function <strong>of</strong> implementingprogrammes included in the Plan matrix;• Provision <strong>of</strong> guidance for lobbing and negotiating with loc<strong>al</strong>, nation<strong>al</strong> and internation<strong>al</strong> actorsinterested in or being involved in projects in our SPLED;• Provision <strong>of</strong> guidance for loc<strong>al</strong> government and donors to <strong>al</strong>locate funds and to focus onavailable resources.ImplementationA SPLED is the <strong>of</strong>fici<strong>al</strong> plan for the administration <strong>of</strong> a loc<strong>al</strong> government and the institutions andenterprises under its control and as such is an on-going evolving plan. The SPLED for our city hasbegun and will follow four stages:1. Activation <strong>of</strong> the financi<strong>al</strong> resources and <strong>al</strong>location <strong>of</strong> the funds;2. Re<strong>al</strong>isation <strong>of</strong> public-private partnerships;3. Monitoring and ev<strong>al</strong>uation <strong>of</strong> the Plan;4. Re-ev<strong>al</strong>uation and improvement <strong>of</strong> the Plan.Given that the timeframe for implementation <strong>of</strong> our SPLED is longer than that <strong>of</strong> a politic<strong>al</strong> mandate,the success in the implementation <strong>of</strong> this strategy depends on the continuous engagement <strong>of</strong> the loc<strong>al</strong>government and civil service in achieving the objectives and implementation <strong>of</strong> the outlined projects.The Municip<strong>al</strong> Council, as the key factor in provision <strong>of</strong> support for the SPLED, will provideguarantees for the <strong>al</strong>location <strong>of</strong> municip<strong>al</strong> funds for financing <strong>of</strong> the projects. In addition, it willprovide effective advice for the approv<strong>al</strong> <strong>of</strong> improvements suggested by the Planning Commissionand executive authority <strong>of</strong> the municip<strong>al</strong> government.


The Mayor and the Head <strong>of</strong> the EDDM will coordinate the programmes, projects and financing fromcentr<strong>al</strong> government, donors and loc<strong>al</strong> or internation<strong>al</strong> <strong>org</strong>anisations, so that they follow and supportthe SPLED. In addition, they will initiate and implement adequate improvements in the management<strong>of</strong> the process and restructure the staff according to the implementation <strong>of</strong> the SPLED. The success<strong>of</strong> the implementation will depend heavily on how the <strong>org</strong>anisations and agencies involved in theStrategic Plan will manage the particular elements they are responsible for.While the community will experience progress with the implementation <strong>of</strong> the SPLED, the planitself will need to be revised, ev<strong>al</strong>uated and improved in order to address new conditions and situations.The Economic Development Commission <strong>of</strong> the Municip<strong>al</strong>ity (EDCM) will monitor and ev<strong>al</strong>uatethe implementation <strong>of</strong> the Plan, while keeping in mind that the community should <strong>al</strong>so have access tothe monitoring process.Organisation<strong>al</strong> approach to Plan implementationThe <strong>municip<strong>al</strong>ity</strong> appointed the EDCM as the main institution to review and ev<strong>al</strong>uate the StrategicPlan implementation process. Every four months, EDCM will hold a meeting to discuss progressmade in the implementation, based on reports prepared by the EDDM. It will <strong>al</strong>so, once a year, inAugust, discuss and approve findings and ev<strong>al</strong>uations, and add suggestions that will be presented tothe Mayor and then to the Municip<strong>al</strong> Council for discussion and approv<strong>al</strong>.The composition <strong>of</strong> this Commission may change. However, the responsibilities will remain thesame: supporting, monitoring and reviewing Plan implementation. Meanwhile, the Mayor, inconsultation with EDCM, may appoint working groups to support implementation <strong>of</strong> particular parts.EDCM will develop and approve an annu<strong>al</strong> activity plan for reviewing the Strategic Plan. The fundsfor supporting its operations will be approved by Municip<strong>al</strong> Council, at the request <strong>of</strong> the Mayor.The EDDM is the structure that is directly responsible for following up the implementation process,and it will mainly:• provide adequate administrative logistic<strong>al</strong> support for the activity <strong>of</strong> the Planning Commission;• coordinate the activities <strong>of</strong> the actors identified in the Plan and <strong>of</strong> those that will be involved later on;• provide staff for the working teams that will support the Planning Commission;• prepare and present for the Mayor and Planning Commission reports on the performance <strong>of</strong>the implementation process;• find data and information required by the Mayor and Planning Commission.23


MUNICIPALITY <strong>of</strong> SHKODRAFinancing <strong>of</strong> Strategic PlanFinancing <strong>of</strong> the Strategic Plan is a major effort for the Municip<strong>al</strong>ity, equ<strong>al</strong> to the effort made in plandevelopment. The Implementation Matrix (Chapter VIIIc) identifies estimated costs, and gives theactu<strong>al</strong> and potenti<strong>al</strong> partners. The approximate cost <strong>of</strong> Plan implementation is 7,599,776,896 leke,equiv<strong>al</strong>ent to 60,798,215 euro.The Municip<strong>al</strong> Government will finance the Strategic Plan through its own budget, and this began in2005. The Municip<strong>al</strong> Council will continu<strong>al</strong>ly include the implementation <strong>of</strong> the programmes andprojects <strong>of</strong> the Plan in the <strong>municip<strong>al</strong>ity</strong>’s annu<strong>al</strong> and mid-term budgets.The Strategic Plan will be co-financed by centr<strong>al</strong> government, the loc<strong>al</strong> business community andother community groups, donors and loc<strong>al</strong> and internation<strong>al</strong> <strong>org</strong>anisations. Commitment <strong>of</strong> the businesscommunity through direct investments <strong>of</strong>fers an addition<strong>al</strong> financi<strong>al</strong> guarantee for its implementationand success.24


VI.Overview <strong>of</strong> Shkodra communityGeography and topographyThe city <strong>of</strong> Shkodra is located in Northwest Albania (45.03N, 19.31E), at an <strong>al</strong>titude above sea levelranging, in a line running from south-west to north-east, from 9.5 m to 24 m.The city and its immediate surrounds lie on an <strong>al</strong>luvi<strong>al</strong> plain in a depression resulting from tectonicshift during the Pliocene. This depression is partly filled by deposits from the rivers that have flowedthrough the depression to the Adriatic Sea. The climate is Mediterranean, with a continent<strong>al</strong> andmaritime mixture.To the north and west <strong>of</strong> the city lies Lake Shkodra, from which the River Buna (44 km long) flowssouth into the Adriatic. The lower part <strong>of</strong> the river constitutes a border with Montenegro. Just (twokm) southwest <strong>of</strong> the city lies the confluence <strong>of</strong> the Rivers Buna and Drin. The east <strong>of</strong> the city isbordered by the River Kir (43 km long), a season<strong>al</strong> river that flows from the northern highlands intothe River Drin just south <strong>of</strong> the city.The flat part <strong>of</strong> Shkodra extends across an area <strong>of</strong> 1,150 ha, while there are some 350 ha <strong>of</strong> hills in thecity. Shkodra includes three peripher<strong>al</strong> neighbourhoods: Bahç<strong>al</strong>lek in the south, and Shirokë andZogaj in the west, which occupy an area <strong>of</strong> 180 ha.Shkodra is partly encircled by a range <strong>of</strong> hills that rise to an <strong>al</strong>titude <strong>of</strong> 110 m, by the Rrenci Hills tothe east and the Tepe Hills to the south. Immediately southwest <strong>of</strong> Shkodra lies the rocky outcrop onwhich stands Rozafa Castle, some 130 m above sea level and enclosing an area <strong>of</strong> 3.6 ha.To the north and northwest lie the fields <strong>of</strong> Mbi<strong>shkodra</strong>, to the north and east <strong>of</strong> which the AlbanianAlps begin. In the opposite direction, about 30 km to the southwest <strong>of</strong> the city, lies Velipoja, apopular beach resort on the Adriatic coast.Thus, within 30 km <strong>of</strong> Shkodra there exist a whole range <strong>of</strong> natur<strong>al</strong> attractions, from the mountains<strong>of</strong> High Albania to the Mediterranean coastline <strong>of</strong> the Adriatic, from the shores <strong>of</strong> the largestlake in the B<strong>al</strong>kans to the rocky outcrop <strong>of</strong> Rozafa Castle, which stands majestic<strong>al</strong>ly above acity that one hundred years ago had a navigable river bringing merchant and passenger vesselsinto its heart.DemographyThe population <strong>of</strong> the city <strong>of</strong> Shkodra comprises about 45 per cent <strong>of</strong> that <strong>of</strong> the whole region. As aresult <strong>of</strong> the dramatic changes that have taken place in the country over the last decade and a h<strong>al</strong>f, the25


MUNICIPALITY <strong>of</strong> SHKODRA26population <strong>of</strong> the city has increased by nearly one-third, despite emigration, either within the countryor abroad. The increase is reported in the table below and illustrated quite clearly in the accompanyingfigure.No. <strong>of</strong> inhabitants120,000100,00080,00060,00040,00020,000019911992Year No. <strong>of</strong> inhabitants Year No. <strong>of</strong> inhabitants1991 83,086 1998 101,2571992 85,436 1999 102,9371993 87,941 2000 104,6671994 89,587 2001 106,4151995 92,181 2002 107,9241996 93,674 2003 108,9951997 98,979 2004 109,6321993Source: Municip<strong>al</strong>ity <strong>of</strong> Shkodra199419951996An<strong>al</strong>ysis <strong>of</strong> births and deaths shows that much <strong>of</strong> the population increase has come from migrationfrom outside <strong>of</strong> the city (see table and figure below). The data for Mechanic<strong>al</strong> Change is an over<strong>al</strong>lfigure, which includes unknown numbers <strong>of</strong> immigrants and emigrants.Year 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004Births 1,524 1,535 1,494 1,650 1,582 1,618 1,644 1,520 1,306 1,438 1,449 1,279 1,348 1,445Deaths 587 612 596 627 615 584 662 726 656 583 621 601 598 702Mechanic<strong>al</strong>1,413 1,598 748 1,571 526 2,822 1,382 886 1,080 894 661 393 -113 -194ChangeTot<strong>al</strong>2,350 2,521 1,646 2,594 1,493 3,856 2,364 1,680 1,730 1,749 1,489 1,071 637 549ChangeSource: Municip<strong>al</strong>ity <strong>of</strong> Shkodra1997Year1998199920002001200220032004


Change in population size4,5004,0003,5003,0002,5002,0001,5001,0005000BirthsDeathsMechanic<strong>al</strong> ChangeTot<strong>al</strong> Change-50019911992199319941995199619971998199920002001200220032004YearSource: Municip<strong>al</strong>ity <strong>of</strong> ShkodraThe natur<strong>al</strong> change in the size <strong>of</strong> the population <strong>of</strong> Shkodra is a positive number, i.e. that the number<strong>of</strong> births is greater than the number <strong>of</strong> deaths.• The over<strong>al</strong>l coefficient <strong>of</strong> mort<strong>al</strong>ity (number <strong>of</strong> deaths : number <strong>of</strong> inhabitants) has variedvery little over the last decade and a h<strong>al</strong>f, at 7 deaths per 1,000 inhabitants in 1991, to 6deaths per 1,000 inhabitants in 2003.• The over<strong>al</strong>l migration figures, overwhelmingly positive in the 1990s became negative in2003 and 2004.Reasons for the latter figures could be many. For example, the number <strong>of</strong> emigrants going abroad orto Tirana may have been roughly constant over <strong>al</strong>l this time, while the number <strong>of</strong> immigrants enteringthe city may have gradu<strong>al</strong>ly decreased, as many areas <strong>of</strong> the hinterland have become deserted.Population structure according to age group is reported for year 2004 in the table below.Age group(years) < 1 1–4 5–9 10–14 15–19 20–34 35–54 55–64 > 64 Tot<strong>al</strong>Number 1,500 8,675 9,150 9,443 9,377 28,688 25,300 8,022 10,027 110,182Percentage 1.36 7.87 8.31 8.57 8.51 26.04 22.96 7.28 9.10 100Source: Municip<strong>al</strong>ity <strong>of</strong> ShkodraThe average age <strong>of</strong> the population <strong>of</strong> the city <strong>of</strong> Shkodra is 27 years (a young population). The ageingcoefficient is 8 per cent (young), while the m<strong>al</strong>e : fem<strong>al</strong>e birth ratio was in favour <strong>of</strong> m<strong>al</strong>es during theyears 1991–2003, the ratio varying between 103 and 118 m<strong>al</strong>es per 100 fem<strong>al</strong>es.27


MUNICIPALITY <strong>of</strong> SHKODRAMunicip<strong>al</strong> governmentThe Municip<strong>al</strong>ity <strong>of</strong> Shkodra forms part <strong>of</strong> the Region <strong>of</strong> Shkodra. In the loc<strong>al</strong> elections <strong>of</strong> October2004, the Mayor <strong>of</strong> the city was elected <strong>al</strong>ong with 45 members <strong>of</strong> the Municip<strong>al</strong> Council, whorepresent sever<strong>al</strong> politic<strong>al</strong> parties. The Municip<strong>al</strong> Council approved the <strong>org</strong>anisation<strong>al</strong> structure <strong>of</strong>the <strong>municip<strong>al</strong>ity</strong>’s administration, which is shown in the chart below.City Planning OfficeOffice <strong>of</strong> Public Worksand ServicesAdministrative Unit 1Administrative Unit 2Administrative Unit 3Administrative Unit 4Administrative Unit 5Vice-mayorCabinetAudit OfficeMayorOffice <strong>of</strong> Municip<strong>al</strong>Police and CivilDefencePlanning,Coordination andPublic InformationOfficeVice-mayorBudget, Finance,Accounting OfficeRevenue OfficeEconomicAssistance OfficeHuman ResourcesOfficeIntern<strong>al</strong> ServicesOffice28


Revenues and expenses for years 2001 to 2004The revenues (000s leke) and expenses for the Municip<strong>al</strong>ity <strong>of</strong> Shkodra for the years 2001 to 2004are reported in the table below.Revenues 2001 2002 2003 2004Tot<strong>al</strong> loc<strong>al</strong> revenues: 46,112 87,693 204,178 233,155from loc<strong>al</strong> taxes 17,056 44,428 169,922 178,050from loc<strong>al</strong> tariffs 19,393 26,710 11,069 38,850from other sources 9,663 16,555 23,187 16,255Tot<strong>al</strong> revenue from Nation<strong>al</strong> Resources: 1,082,547 1,102,883 1,345,117 1,146,340grant 140,154 252,891 156,940 127,769designated transfers (conditioned budget) 942,393 849,992 1,188,177 1,018,571Tot<strong>al</strong> (000 leke) 1,128,659 1,190,576 1,549,295 1,379,495PercentageLoc<strong>al</strong> revenues: 4 7 13 17from loc<strong>al</strong> taxes 2 4 11 13from loc<strong>al</strong> tariffs 1 2 1 3from other sources 1 1 1 1Revenue from Nation<strong>al</strong> Resources: 96 93 87 83grant 12 21 10 9designated transfers (conditioned budget) 84 72 77 74Tot<strong>al</strong> 100 100 100 100Expenses (%)Investments from own resources 1 4 3 3Investments from nation<strong>al</strong> resources 9 8 4 3Operation<strong>al</strong> expenses 90 88 93 94Tot<strong>al</strong> 100 100 100 100Source: City Department <strong>of</strong> FinanceIt is apparent that the <strong>municip<strong>al</strong>ity</strong> is heavily dependent upon centr<strong>al</strong> government for its income, asthe tot<strong>al</strong> revenues from Nation<strong>al</strong> Resources for the period 2001 to 2004 show, accounting for between83 and 96 per cent <strong>of</strong> revenue, though the percentage has been steadily f<strong>al</strong>ling since 2001.The budget <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong> contains a conditioned part and an unconditioned part. The conditionedpart includes funds specific<strong>al</strong>ly <strong>al</strong>located by centr<strong>al</strong> government for common and delegated functions,which are supervised by the line ministries, while the unconditioned part includes the <strong>municip<strong>al</strong>ity</strong>’srevenues from loc<strong>al</strong> taxes and tariffs applied for the various services it <strong>of</strong>fers, and from s<strong>al</strong>e <strong>of</strong> itsassets. In addition, since the year 1999, this budget line has included a grant disbursed by centr<strong>al</strong>government.29


MUNICIPALITY <strong>of</strong> SHKODRAThe relative percentages <strong>of</strong> the conditioned and unconditioned budget are shown in the figure below.Despite the reforms undertaken as part <strong>of</strong> decentr<strong>al</strong>isation <strong>of</strong> government, the continued centr<strong>al</strong>isation<strong>of</strong> the state is apparent: the conditioned budget comprised 74 per cent <strong>of</strong> the tot<strong>al</strong> budget for the year2004, though for the year 2001 it was higher still, at 84 per cent.Percentage90807060504030201002001 2002 2003 2004YearSource: City Department <strong>of</strong> FinanceConditioned budgetUnconditioned budgetThe policy making capabilities <strong>of</strong> the <strong>municip<strong>al</strong>ity</strong>, especi<strong>al</strong>ly with regard to the capit<strong>al</strong> investmentsand common functions, are still very centr<strong>al</strong>ised with <strong>al</strong>most <strong>al</strong>l financing coming from centr<strong>al</strong>government through the line ministries.Furthermore, with regard to the conditioned budget, there are no clear and transparent mechanismsand criteria on how it is assigned by centr<strong>al</strong> government. This is reflected in the low level <strong>of</strong> investmentsre<strong>al</strong>ised by the <strong>municip<strong>al</strong>ity</strong>, even though the need for capit<strong>al</strong> investments and capability to absorbthem is very large.Another important source <strong>of</strong> financing for the <strong>municip<strong>al</strong>ity</strong> is donors. The Municip<strong>al</strong>ity <strong>of</strong> Shkodrahas positive experiences in this direction, such as the financing by the Austrian Chancellery <strong>of</strong> aproject to rehabilitate the city’s mains water and sewage systems, and by USAID <strong>of</strong> a project torehabilitate two <strong>of</strong> the city’s roads.Nevertheless, despite direct meetings being held between municip<strong>al</strong> <strong>of</strong>fici<strong>al</strong>s and various donors,when it comes to the financing <strong>of</strong> supportive programmes, especi<strong>al</strong>ly through capit<strong>al</strong> investments,donors prefer, in most cases, to negotiate with centr<strong>al</strong> government (the line ministries), andrecommendations are <strong>of</strong>ten determined by the politic<strong>al</strong> preferences <strong>of</strong> ministry staff.30


EducationIn year 2001, the education<strong>al</strong> level <strong>of</strong> the adult population <strong>of</strong> the city <strong>of</strong> Shkodra was as follows:Education<strong>al</strong> levelPer centUneducated 1Know how to read and write only 12Elementary education attended 15Middle school and vocation<strong>al</strong> education attended 31High school education attended 32University or college attended 9Source: INSTAT31


MUNICIPALITY <strong>of</strong> SHKODRAVII. Economic pr<strong>of</strong>ile <strong>of</strong> ShkodraIn the period 1945–1992, Albania implemented the opposite <strong>of</strong> a market economy: property ownershipwas prohibited and <strong>al</strong>l economic activity was state controlled. The country became unique withregard to isolation and economic centr<strong>al</strong>isation.The main activities <strong>of</strong> the processing industry in Shkodra were the processing <strong>of</strong> tobacco andmanufacture <strong>of</strong> cigarettes, production <strong>of</strong> conserved foods, sugar-based foods, s<strong>of</strong>t and <strong>al</strong>coholic drinks,and pasta, bread, rice and vegetable oil. The main activities <strong>of</strong> the textile industry were focused ongarments and silk products. The city <strong>al</strong>so had a wood-processing and paper-production plant. Themost important mechanic<strong>al</strong> engineering industries concerned wire manufacturing, elevatormanufacturing, bus assembly and the Drini Plant. Two important hand craft enterprises were theArtisan Products Enterprise and the Straw and Reed Enterprise.During this period, Shkodra had the fifth largest economy in Albania. However, in 1992, the Albaniangovernment undertook a number <strong>of</strong> reforms and approved a number <strong>of</strong> laws concerning propertyownership, private activity, competition, bankruptcy, foreign investments, customer protection,privatisation <strong>of</strong> sm<strong>al</strong>l and medium enterprises (SMEs), and many other elements involved in moderntrade.As a result <strong>of</strong> these reforms, big changes took place in the economic structure <strong>of</strong> Shkodra, so thatsome nine-tenths <strong>of</strong> the former state-owned enterprises in the city were privatised. However, themajority <strong>of</strong> these privatised businesses did not continue their origin<strong>al</strong> production lines, particularlyin the mechanic<strong>al</strong> engineering industry, which had been unique in the country and had a guaranteednation<strong>al</strong> market.Food processing, wood processing and the artisan products industry, which were among the largestproducers <strong>of</strong> the time, were dissolved into a large number <strong>of</strong> SMEs.Meanwhile, tobacco processing and the cigarette manufacturing industry were completely destroyed:incapability to invest in technologic<strong>al</strong> renovation and competition from imported products caused itsbankruptcy.Natur<strong>al</strong> resources <strong>of</strong> Shkodra regionThe Shkodra region is bordered to the North by the region <strong>of</strong> M<strong>al</strong>esi e Madhe, to the West by theRepublic <strong>of</strong> Serbia and Montenegro, and by the Adriatic Sea, to the South by the region <strong>of</strong> Lezha andto the East by the region <strong>of</strong> Puka. The Region <strong>of</strong> Shkodra occupies an area <strong>of</strong> 2,049 km 2 and has apopulation <strong>of</strong> 243,000 inhabitants.32


The territory includes three lakes. Lake Shkodra, the largest lake in the B<strong>al</strong>kans, has a surface area <strong>of</strong>369 km 2 , <strong>of</strong> which 149 km 2 lie in Albania, with the rest in Montenegro. The average depth <strong>of</strong> the lakeis 10 m and the average water temperature 16.5°C, which helps to moderate the climate <strong>of</strong> the city.The lake is very rich in fish, with an annu<strong>al</strong> harvest <strong>of</strong> 50 kg/ha. The shoreline within the <strong>municip<strong>al</strong>ity</strong>extends 14.5 km <strong>al</strong>ong the lakeshore, <strong>of</strong> which 10 km are rocky and 4.5 km flat land, mostly borderingfields.The two other lakes in the region <strong>of</strong> Shkodra are artifici<strong>al</strong>: the lake <strong>of</strong> Vau-Dejes, 20 km east <strong>of</strong>Shkodra, occupies an area <strong>of</strong> 27 km 2 , while that <strong>of</strong> Koman, 40 km east <strong>of</strong> Shkodra, is 17 km 2 in size.Both these lakes are located on the River Drin and were created to supply the two largest hydroelectricitypower stations in Albania: Vau-Dejes has an inst<strong>al</strong>led power <strong>of</strong> 250 mW, while that <strong>of</strong>Koman has an inst<strong>al</strong>led power <strong>of</strong> 600 mW.To the north <strong>of</strong> Shkodra, in the highlands, reside yet more water resources. The mountain v<strong>al</strong>leys areon average 800 m above sea level and have potenti<strong>al</strong> electricity reserves <strong>of</strong> 400 mW per hour, <strong>al</strong>lowingfor the construction <strong>of</strong> sm<strong>al</strong>l power stations.The most important loc<strong>al</strong> met<strong>al</strong> miner<strong>al</strong> resources are to be found at the copper mine <strong>of</strong> P<strong>al</strong>aj Karme,45 km from the city. This mine became effective in 1981 and its reserves are estimated to be morethan 1 million tons, with 2.5 per cent Cu. Other copper ore sources are located in Turrec, 40 km fromShkodra. In addition, there are reserves <strong>of</strong> Bauxite (<strong>al</strong>uminium ore) at Villgar, 13 km from Shkodra.Non-met<strong>al</strong> miner<strong>al</strong>s are found at the following places (with distance from Shkodra in parentheses):• Kaolin (white clay used to make porcelain and some medicines) in Domen-Postribe (13 km)and in Vig (45 km);• Silica source at Vilza (21 km);• Dolomite (limestone) stone resources in Rrasek (11 km);• Rhyolite stone resources in Guri Zi (6 km).In the periphery <strong>of</strong> Shkodra City reside resources <strong>of</strong> raw materi<strong>al</strong>s used for the production <strong>of</strong>construction materi<strong>al</strong>s, including cement, lime, bricks, tiles, ceramics, marble, decorative stone, etc.The land around Shkodra comprises approximately 19,220 ha (or 64 per cent) flat land, 7,450 ha (25per cent) hills and 3,590 (11 per cent) mountain. The land and much <strong>of</strong> the hills are farmed in oneway or another.33


MUNICIPALITY <strong>of</strong> SHKODRAAccording to recent agrochemic<strong>al</strong> studies, more than 75 per cent <strong>of</strong> the land surface is rich or mediumrich in nitrogen, phosphorous and potassium, and the depth <strong>of</strong> soil under the fields is large. Dominatingtypes <strong>of</strong> land are neutr<strong>al</strong> meadow and <strong>al</strong>luvi<strong>al</strong> meadow types.According to the land registry, the region <strong>of</strong> Shkodra has in tot<strong>al</strong> 151,427 ha land, <strong>of</strong> which 30,243 haare agricultur<strong>al</strong>, 54,510 forest, 10,454 meadows and pastures, and 56,220 ha other types. Of theagricultur<strong>al</strong> land, 29,289 ha are fields, 184 ha orchards, 561 ha olive groves and 208 ha vineyards.According to the Region<strong>al</strong> Agricultur<strong>al</strong> Office, the dominant cultivated crops are as follows:• Fodder, 10,321 ha;• Grain and corn, 6,076 (grain 2,544; corn 3,532) ha;• Tot<strong>al</strong> vegetable, 2,755 ha;• Kidney bean, 597 ha;• Potato, 231 ha;• Tobacco, 213 ha.TourismTourism in the Shkodra region is an age-old tradition. The products <strong>of</strong> the region have been muchv<strong>al</strong>ued by both foreign and nation<strong>al</strong> tourists, but particularly by the loc<strong>al</strong> people. Although the producehas been mostly designed for nation<strong>al</strong> or loc<strong>al</strong> consumption much <strong>of</strong> it is attractive to foreign touristsas well.The larger region around Shkodra, encompassing M<strong>al</strong>esia e Madhe (High Albania), has a veryfavourable geographic<strong>al</strong> position compared to <strong>al</strong>l other regions <strong>of</strong> Albania with regard to thedevelopment <strong>of</strong> four major types <strong>of</strong> tourism:• City tourism, based on the attractions <strong>of</strong>fered by Shkodra itself, with its religious artefacts(from three different main religions practised in the city), cultur<strong>al</strong> monuments, Rozafa Castleand 40 characteristic tradition<strong>al</strong> houses;• Mountain tourism, based on the attractions <strong>of</strong>fered by M<strong>al</strong>esia e Madhe, in the villages <strong>of</strong>the Razem, Boge and Theth area, <strong>al</strong>l <strong>of</strong> which are within 45 km <strong>of</strong> the city;• Seaside tourism, based on the attractions <strong>of</strong>fered by Velipoja Beach, only 30 km from thecity;34


• Lake tourism, based on the attractions <strong>of</strong> the villages <strong>of</strong> Shirokë and Zogaj, and the lakeitself.It must be pointed out that the geographic<strong>al</strong> position <strong>of</strong> the region <strong>of</strong> Shkodra is undoubtedly themost important premise for the development <strong>of</strong> tourism in the region. In addition, the human, cultur<strong>al</strong>and historic<strong>al</strong> v<strong>al</strong>ues and traditions <strong>of</strong> Shkodra city add more dimensions to such development.Labour force1. EmploymentEmployment in the private sector from years 1994 to 2004 is shown in the table below.Year 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004No. <strong>of</strong>employees 7,391 8,483 8,190 4,141 4,034 3,802 4,972 5,223 5,496 5,611 6,529Source: Region<strong>al</strong> Office for Employment in ShkodraThe fluctuation in the numbers <strong>of</strong> people employed in the private sector is shown clearly in the figurebelow, from which it can be seen that the level <strong>of</strong> employment has been rising over the past six years,approaching the levels <strong>of</strong> a decade earlier. The collapse in the number <strong>of</strong> people employed in theprivate sector in 1996 and 1997 coincides with the collapse <strong>of</strong> the pyramid schemes in Albania inthose years.9,0008,000No. <strong>of</strong> employees7,0006,0005,0004,0003,0002,0001,000019941995199619971998199920002001200220032004YearFurther breakdown <strong>of</strong> the employment figures by sector and economic activity for the year 2004 isreported in the table on the following page.35


MUNICIPALITY <strong>of</strong> SHKODRAActivityPrivate sector Public sector Tot<strong>al</strong>No. <strong>of</strong>subjectsNo. <strong>of</strong>employeesNo. <strong>of</strong>subjectsNo. <strong>of</strong>employeesNo. <strong>of</strong>subjectsNo. <strong>of</strong>employeesEmployeesas %Agriculture, hunting,silviculture3 167 3 167 1.10Mining 2 12 2 12 0.08Manufacturing:Food processing 76 267Garment and clothes 21 1,059Leather and shoes 4 718Others 64 313Tot<strong>al</strong> manufacturing 165 2,357 2 55 167 2,412 16.00Generation and use <strong>of</strong>electricity, water, etc.1 2 10 985 11 987 7.00Construction 103 970 103 970 6.30Trade, car repairs andhome products747 1,690 747 1,690 11.10Hotels and restaurants 140 262 140 262 2.00Transportation andtelecommunications109 167 6 437 115 443 3.00Financi<strong>al</strong> activities 4 31 3 57 7 88 0.60Public administration 13 168 58 2,913 71 3,081 20.24Education 19 243 13 2,407 32 2,650 17.41He<strong>al</strong>th and soci<strong>al</strong> activities 53 70 4 1,287 57 1,357 8.92Collective and person<strong>al</strong>soci<strong>al</strong> services278 565 12 371 290 936 6.20Internation<strong>al</strong> institutions 1 4 1 4 0.03Tot<strong>al</strong> 1,633 6,529 113 8,691 1,746 15,220 100.0Source: Region<strong>al</strong> Office for Employment in ShkodraIt is apparent that the public sector is the largest employer in Shkodra, with 57 per cent <strong>of</strong> the tot<strong>al</strong>workforce. Public administration is the largest single employer, with 20 per cent <strong>of</strong> the tot<strong>al</strong>. Otherlarge employers are the education sector (17%), manufacturing (16%), trade (11%), he<strong>al</strong>th and soci<strong>al</strong>activities sector (9%), electricity and water production, distribution and supply (7%), and construction(6%).2. UnemploymentUnemployment in Shkodra from years 1996 to 2004 is shown in the table below.Year 1996 1997 1998 1999 2000 2001 2002 2003 2004No. <strong>of</strong>unemployed 13,177 17,596 21,585 22,026 21,309 18,922 18,263 18,263 17,097Source: Region<strong>al</strong> Office for Employment in Shkodra36


Not surprisingly, the figures fluctuate inversely with respect to those for employment reported above,but not absolutely so. Thus, in 1996, about one and a h<strong>al</strong>f times as many people were unemployedthan were employed, while in 2004, this ratio was two and a h<strong>al</strong>f times. The highest level <strong>of</strong>unemployment was recorded between 1998 and 2000, as shown clearly in the figure below.25,00020,00015,00010,0005,000019961997No. <strong>of</strong> unemployed1998199920002001200220032004YearAmong unemployed active job seekers more m<strong>al</strong>es were registered in 2004 than were fem<strong>al</strong>es, andthe highest percentage <strong>of</strong> unemployment was registered for people in their early 20s. The level <strong>of</strong>unemployment f<strong>al</strong>ls with increased level <strong>of</strong> education as reported in the table below.Tot<strong>al</strong>Age groupHead <strong>of</strong>Fem<strong>al</strong>ehousehold 15–19 20–24 25–34 >34MiddleschoolEducation<strong>al</strong> levelHighVocation<strong>al</strong>schoolUniversity17,097 6,907 7,601 2,919 7,360 1,488 5,330 7,989 6,187 2,408 513% 40 44 17 43 9 31 47 36 14 3Source: Region<strong>al</strong> Office for Employment in ShkodraFrom the same information source as above, the ratio <strong>of</strong> active population to tot<strong>al</strong> population size isreported as 29 per cent, while the level <strong>of</strong> unemployment itself is about 54 per cent, among thehighest in the country.Private businesses in ShkodraThe Shkodra region accounts for three per cent <strong>of</strong> <strong>al</strong>l businesses active in Albania. Tirana has thelargest number <strong>of</strong> enterprises, with 39 per cent, while more than 60 per cent <strong>of</strong> <strong>al</strong>l economic activitytakes place in the Tirana–Durres–Fier corridor. In comparison, the whole northern h<strong>al</strong>f <strong>of</strong> Albania,which includes the regions <strong>of</strong> Shkodra, Lezha, Kukes and Dibra accounts for only 7 per cent <strong>of</strong>businesses, as reported in the table and figure below.37


MUNICIPALITY <strong>of</strong> SHKODRANo. <strong>of</strong> enterprises25,00020,00015,00010,0005,0000Prefecture No. <strong>of</strong> enterprises PercentageTirana 20,152 39Durres 6,308 12Fier 5,376 10Korça 4,683 9Vlora 3,730 7Elbasan 3,499 7Berat 2,440 5Gjirokastra 2,140 4Shkodra 1,579 3Lezha 975 2Dibra 684 1Kukes 379 1TiranaDurresFierKorcaSource: INSTAT Business Register (2003)VloraPrefectureElbasanThe table below reports the number <strong>of</strong> businesses in the Shkodra Prefecture for the period 1994–2004. The largest number <strong>of</strong> businesses is recorded for years 1994 and 1995, a result <strong>of</strong> the economicreforms and privatisation <strong>of</strong> state-owned enterprises, which became SMEs. There followed however,a drastic reduction in the number <strong>of</strong> businesses between years 1996 and 1999, as shown in theaccompanying figure.Year 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004No. <strong>of</strong>businessesBerat2,310 2,594 1,792 987 1,037 944 1,431 1,582 1,654 1,652 1,633GjirokastraShkodraLezhaDibraKukes38


3,0002,500No. <strong>of</strong> businesses2,0001,5001,000500019941995199619971998199920002001200220032004YearSource: INSTAT Business Register (2003)During the period 1997 to 1999 the decline resulted partly from the closure <strong>of</strong> the border with theformer Yugoslavia (Montenegro), which sharply reduced the economic exchange between the twostates, and subsequently the activity on either side <strong>of</strong> the border. In addition, there was in Albania thecrisis <strong>of</strong> 1997, mentioned above, during which the businesses <strong>of</strong> Shkodra were badly damaged, beingforced to close or reduce their activity as much as possible. Furthermore, during this period and eversince, the situation with regard to the electricity supply (on average just 6 or 7 hours a day) andinfrastructure <strong>of</strong> the city has been critic<strong>al</strong>. Nevertheless, during 2000, there was an increase in thenumber <strong>of</strong> businesses <strong>of</strong> 487 compared to the previous year, and the number has increased slightlysince then, stabilising at about 1,600.The following table and chart show the structure <strong>of</strong> the types and sizes <strong>of</strong> businesses active in andaround Shkodra during 2003. Micro, sm<strong>al</strong>l and medium enterprises comprise 99 per cent, nearly <strong>al</strong>l,<strong>of</strong> the businesses, with only 1 per cent <strong>of</strong> <strong>al</strong>l businesses being large enterprises.Economic activity Micro Sm<strong>al</strong>l Medium Large Tot<strong>al</strong>Agriculture 19 2 7 2 30Industry 197 33 22 15 267Construction 151 31 12 1 195Transportation 95 6 2 103Trade 760 19 4 783Services 175 17 6 3 201Tot<strong>al</strong> 1,397 108 53 21 1,579Source: Region<strong>al</strong> Directorate <strong>of</strong> Taxes39


MUNICIPALITY <strong>of</strong> SHKODRAThe situation regarding the economic activity <strong>of</strong> the businesses is shown in the chart below. Trade isin first place with 54 per cent, industry in second place with 14 per cent, services, 13 per cent,construction, 11 per cent, transportation, 7 per cent, with agriculture only 1 per cent.Source: Region<strong>al</strong> Directorate <strong>of</strong> TaxesMost <strong>of</strong> the businesses in the Shkodra region have an annu<strong>al</strong> turnover <strong>of</strong> less than 800,000 leke(8,000 USD). Of the businesses active within the <strong>municip<strong>al</strong>ity</strong> itself, the breakdown by activity forthe year 2004 is reported in the table below.Economic activity Number PercentageTrade, repairs 783 58Processing 146 11Transportation and telecommunications 105 7.5He<strong>al</strong>thcare and soci<strong>al</strong> activity 91 7Construction 85 6Group and person<strong>al</strong> soci<strong>al</strong> services 69 5Hotel, restaurant 24 2Finance 11 1Education 6 0.5Other 32 2Tot<strong>al</strong> 1,352 10040Source: Region<strong>al</strong> Directorate <strong>of</strong> Taxes


Trade accounts for nearly two-thirds <strong>of</strong> these businesses, with processing the next largest sector,with rest each being less than one-tenth.For businesses in Shkodra with revenues larger than 800,000 leke, c<strong>al</strong>led large businesses, the followingstructure obtains.Economic activity Number PercentageTrade 162 45Construction 85 24Production 80 23Transportation 9 3Phone service 2 1Other 14 4Tot<strong>al</strong> 352 100Source: Region<strong>al</strong> Directorate <strong>of</strong> TaxesTrade still accounts for nearly h<strong>al</strong>f <strong>of</strong> large businesses, but the construction and manufacturing sectorsare larger than for SMEs. In the manufacturing sector, there are a number <strong>of</strong> speci<strong>al</strong>isations: clothing,food processing, wood processing, tanning (leather and shoes) and others. The breakdown accordingto number <strong>of</strong> businesses is given in the table and figure below.41


MUNICIPALITY <strong>of</strong> SHKODRASource: Region<strong>al</strong> Directorate <strong>of</strong> TaxesRevenues <strong>of</strong> large businesses in ShkodraActivity Revenues (leke) PercentageTrade 294,214,633 30Construction 242,282,001 25Fuels 223,499,438 23Construction materi<strong>al</strong>s 48,485,826 5Shoes 40,352,908 4Wood products 31,851,330 3Garments 26,715,010 3Food products 19,872,517 2Transportation 12,123,565 1Cigarettes 8,239,850 1Other 33,185,872 3Tot<strong>al</strong> 980,822,955 100Source: Region<strong>al</strong> Directorate <strong>of</strong> TaxesFrom the table above it is clear that the tot<strong>al</strong> revenues from large businesses in the city <strong>of</strong> Shkodraamount to 981 million leke (some 9.8 million dollars). The breakdown <strong>of</strong> the different revenues fromthese different economic activities is shown in the figure below. Trade accounts for nearly one-third<strong>of</strong> revenue, with construction and fuel trade each accounting for about one-quarter <strong>of</strong> revenue, withthe other businesses making up the difference, some 22 per cent.42


Source: Region<strong>al</strong> Directorate <strong>of</strong> TaxesIn contrast, revenues from sm<strong>al</strong>l businesses are, not surprisingly, much sm<strong>al</strong>ler than those from largebusinesses, as reported in the table below (in thousands <strong>of</strong> leke). What stands out in these figures isthe remarkable, nearly exponenti<strong>al</strong> growth in revenues from sm<strong>al</strong>l businesses from the years 2000 to2003, whether this be from genuine increased revenues or larger receipts reported to the relevantauthorities.Source: Region<strong>al</strong> Directorate <strong>of</strong> Taxes43


MUNICIPALITY <strong>of</strong> SHKODRA44Services and infrastructure1. Water supplyThe drinking water supply network f<strong>al</strong>ls under the management <strong>of</strong> the Sewage and Water SupplyEnterprise.The water supply network in the city <strong>of</strong> Shkodra was constructed in 1964 and has been functioningsince then. The system comprises the water pump stations in Dobraç, the water reservoirs in the TepeHills and the distribution pipeline network. In <strong>al</strong>l, some 200 km <strong>of</strong> piping are inst<strong>al</strong>led, connected toa reservoir with storage capacity <strong>of</strong> 8,000 m 3 , together with the water pump station with pumpingcapacity <strong>of</strong> 1,000 l/sec.The source <strong>of</strong> the city’s drinking water originates from eleven wells, which are sunk in the area <strong>of</strong>Dobraç, with a tot<strong>al</strong> production capacity <strong>of</strong> 1,200 l/sec. Water is delivered to the city directly fromthe water supply network and from the reservoirs in the Tepe Hills.2. SewerageThe sewage system f<strong>al</strong>ls under the responsibility <strong>of</strong> the Sewage and Water Supply Enterprise. Thesystem was constructed in, and has been function<strong>al</strong> since, 1978. It includes the mains collector, 10.5 kmlong, a secondary network, 138 km long, 6,000 drains and a pumping station with 650 l/sec capacity.To this system are connected about 70 per cent <strong>of</strong> the population <strong>of</strong> the city, with the rest using septictanks, or drains flowing directly into Lake Shkodra or the rivers in its vicinity. The water outflowfrom industri<strong>al</strong> sites is piped directly into the River Kir, which as mentioned above is a highly season<strong>al</strong>river, and would otherwise dry out during the summer.The sewage system is self-flowing, i.e. it uses the natur<strong>al</strong> incline <strong>of</strong> the land, and, through the mainscollector, the sewage goes to the pumping station located in the Liria neighbourhood <strong>of</strong> Shkodra. Thepumping station then pumps the waste directly into the River Drin, near Bahç<strong>al</strong>leku Bridge. The tot<strong>al</strong>annu<strong>al</strong> amount <strong>of</strong> waste produced by the city is approximately 9.6 million m 3 , and currently there isno sewage treatment system inst<strong>al</strong>led. Moreover, most <strong>of</strong> the time the pumping station is not workingand untreated sewage flows directly into Lake Shkodra, creating a serious he<strong>al</strong>th risk3. Flood protectionNatur<strong>al</strong>ly, water collects in depressions, and floods occur following large increases in undergroundwater levels or heavy rainf<strong>al</strong>l. The collection and drainage points are <strong>al</strong>so influenced by the level <strong>of</strong>water in Lake Shkodra, with a maximum recorded increase in level <strong>of</strong> the lake <strong>of</strong> 9.7 m, and in theBuna, Drin and Kir river system.


To prevent flooding, the city had inst<strong>al</strong>led a network <strong>of</strong>, mostly uncovered, drainage can<strong>al</strong>s. Throughthese can<strong>al</strong>s excess surface water flowed into four mill-races, built to use a natur<strong>al</strong> energy resource inthe lowest parts <strong>of</strong> the city.The constructions, completed in the late 1950s, were connected with the existing infrastructure, butin no case was the development <strong>of</strong> new floodwater collectors or preservation <strong>of</strong> existing drainsstudied. As result, most <strong>of</strong> the main high water collection and drainage can<strong>al</strong>s have become unusable.Since then, including during the time when the city’s sewerage system was designed and constructed(from 1970 to 1978), no further main flood drains have been constructed. The reason for the lack <strong>of</strong>subsequent drain inst<strong>al</strong>lation is that the sewage system was to be constructed after the two hydroelectricpower stations were built <strong>al</strong>ong the River Drin, and after the River Buna was to have beensystematised, causing the level <strong>of</strong> the lake to decrease, reducing the threat <strong>of</strong> flooding.Moreover, during the 1990s, as a result <strong>of</strong> uncontrolled immigration into the city <strong>of</strong> people from rur<strong>al</strong>areas and the unregulated urban expansion, the situation worsened with even the roadside ditchesbecoming blocked.In 1997, as part <strong>of</strong> the Water supply and sewerage in the city project and in support <strong>of</strong> the city’s urbanplan, an Austrian team completed a feasibility study for the inst<strong>al</strong>lation <strong>of</strong> a more complete drainagesystem. It is planned for eight main drains to empty into Lake Shkodra and the Buna and Kir rivers.In addition, a solution for the can<strong>al</strong>isation <strong>of</strong> the secondary roads is provided. It is planned for 30 km<strong>of</strong> can<strong>al</strong>s to be constructed, with a tot<strong>al</strong> cost <strong>of</strong> the whole project <strong>of</strong> about 10 million Euros.4. Power supplyThe nation<strong>al</strong> Electricity Corporation (KESh) is the only company that generates, transmits anddistributes electricity in Albania, operating 11 hydro-electric power stations (HECs) and 9 thermoelectricpower stations (TECs) with a tot<strong>al</strong> inst<strong>al</strong>led power <strong>of</strong> 1,684 MW.Shkodra is currently supplied by four power stations <strong>of</strong> which two have a generation capacity <strong>of</strong> 110/35/6 kV and two <strong>of</strong> 35/6 kV. From these power stations 33 high-tension power cables <strong>of</strong> 6 kV or 20kV supply electricity to 160 sub-stations that provide a 400V supply for the customers.In order to improve the current power situation in Shkodra, KESh has planned the followinginvestments:• Investments in the 20 kV network;45


MUNICIPALITY <strong>of</strong> SHKODRA• Reconstruction <strong>of</strong> existing 20/0.4 kV transformer cabins;• Construction <strong>of</strong> new 20/0.4 kV transformer cabins;• Reconstruction <strong>of</strong> the low voltage network;• Inst<strong>al</strong>lation <strong>of</strong> meters for <strong>al</strong>l customers.Investment Existing Planned20 kV network (000 Leke) 105,000 518,000Length <strong>of</strong> cable network (km) 8.2 39Reconstructed cabins 25 66New cabins 2 30TU cable network (km) 3.5 39Meters (000 Leke) 182,000 265,000Number 18,000 26,000Group meters 112,000 230,000Number 250 593Source: Region<strong>al</strong> Directorate <strong>of</strong> KESHThe limitations to the supply <strong>of</strong> electricity in the city depend <strong>al</strong>so on the quotas planned by theDistribution Division <strong>of</strong> KESh.5. TelecommunicationsAt the beginning <strong>of</strong> 1999, the construction <strong>of</strong> a new centr<strong>al</strong> telephone switchboard with a capacity <strong>of</strong>30,000 subscribers was completed. The switchboard is managed by the loc<strong>al</strong> branch <strong>of</strong> AlbTelecom,the Albanian fixed line telecommunications public enterprise. The current number <strong>of</strong> subscribers is9,600. Since 2003, this company has <strong>al</strong>so <strong>of</strong>fered an Internet di<strong>al</strong>-up service. For the year 2005, anincrease <strong>of</strong> 3,600 residenti<strong>al</strong> lines and the introduction <strong>of</strong> an ADSL service was planned.6. Road infrastructureThe city <strong>of</strong> Shkodra has excellent potenti<strong>al</strong> transportation resources, with its roads, railway andaccess to the sea, and is forecast to be a North-South hub for internation<strong>al</strong> traffic, with inclusion in acorridor par<strong>al</strong>lel to the Adriatic-Ionian coastline.Unfortunately, the road network in the city is currently in very poor condition, and deterioratingrapidly. The factors that have brought about this situation are the lack <strong>of</strong> maintenance, rapid increasein the volume <strong>of</strong> traffic and poor, or no, drainage <strong>of</strong> the roads. Moreover, in many parts <strong>of</strong> the city,roads are very <strong>of</strong>ten dug up for various reasons and not filled in and repaired properly.46


Roads in Shkodra City currently f<strong>al</strong>l under three categories, as follows:Primary roadsThese are arteri<strong>al</strong> roads <strong>of</strong> high capacity or express urban roads that support a medium to high trafficload and have the following functions:• Connect the city centre with rur<strong>al</strong> areas around Shkodra and to other cities;• Bypass the centre <strong>of</strong> the city;• Connect directly various institution<strong>al</strong>, trade and cultur<strong>al</strong> sites.Secondary roadsThese are urban roads <strong>of</strong> medium to high capacity with the following functions:• Collect and distribute traffic among primary roads and low capacity roads in the network;• Connect many important sites <strong>of</strong> the city.Tertiary roadsThese are roads <strong>of</strong> low capacity designed for movements among loc<strong>al</strong> areas inside the city.Currently, the network comprises the following:Primary roads, tot<strong>al</strong> length 13.8 km (22%);Secondary roads, tot<strong>al</strong> length 13.4 km (21%);Tertiary roads, tot<strong>al</strong> length 35.8 km (57%).Thus, the tot<strong>al</strong> network comprises 63 km <strong>of</strong> roads and these are surfaced as reported in the tablebelow.Type Length (m) Area (m 2 ) No. <strong>of</strong> roadsAsph<strong>al</strong>ted 30,708 271,470 57Not asph<strong>al</strong>ted 32,312 191,175 73Plazas; <strong>al</strong>leys 97,000Tot<strong>al</strong> 63,020 559,645 130Source: Municip<strong>al</strong> Enterprise <strong>of</strong> Roads and Storm WaterOf the tot<strong>al</strong> area <strong>of</strong> asph<strong>al</strong>ted roads, only 30 per cent fulfil the conditions <strong>of</strong> a good qu<strong>al</strong>ity road.47


MUNICIPALITY <strong>of</strong> SHKODRAVIII. Documentation <strong>of</strong> the Strategic PlanThe Strategic Plan comprises the following documents:a. SWOT, consolidated an<strong>al</strong>ysisb. Matrix <strong>of</strong> Plan go<strong>al</strong>s, objectives, programmes and projectsc. Matrix <strong>of</strong> Plan implementationd. Matrix <strong>of</strong> prioritisation <strong>of</strong> projectse. Project fiches48


a. SWOT, consolidated an<strong>al</strong>ysisIntern<strong>al</strong>Extern<strong>al</strong>PositiveStrengthsOpportunities1. Geographic location <strong>of</strong> Shkodra (sea, 1. Process <strong>of</strong> decentr<strong>al</strong>isation <strong>of</strong> governmentlake, mountains and railway & road2. Compilation <strong>of</strong> DELTA LED strategyconnections with former Yugoslavia)3. Nation<strong>al</strong> strategies that support SMEs2. Existence <strong>of</strong> large natur<strong>al</strong> water resources4. Liber<strong>al</strong>isation <strong>of</strong> banking system; SME3. Existence <strong>of</strong> tourist potenti<strong>al</strong> andfinancingtradition <strong>of</strong> hospit<strong>al</strong>ity5. Opening <strong>of</strong> loc<strong>al</strong> bank branches4. Favourable resources for development <strong>of</strong>agribusiness and tourism6. Initiation <strong>of</strong> projects with foreign<strong>org</strong>anisations and foundations (e.g. WB,5. Traditions in handicrafts and tradingGTZ, SOROS, USAID, UNDP, REC,6. Qu<strong>al</strong>ified human resources and low UNOPS, COOPERAZIONE ITALIANA,labour costsCOOP, etc)7. Young average age <strong>of</strong> population 7. Existence <strong>of</strong> project to build North-Southcorridor <strong>al</strong>ong Adriatic-Ionian coastline8. Presence <strong>of</strong> L. Gurakuqi University8. Existence <strong>of</strong> foreign investments to improve9. Tradition <strong>of</strong> education, sports and culturedrinking water and sewage systems anddevelopmentprospective <strong>of</strong> their enlargement10. Presence <strong>of</strong> pr<strong>of</strong>ession<strong>al</strong> education9. Existence <strong>of</strong> project with EuropeancentresInvestment Bank to inst<strong>al</strong>l 20 kV electricity11. Presence <strong>of</strong> soci<strong>al</strong> care and he<strong>al</strong>thsupply linesinstitutions10. Implementation <strong>of</strong> project to enlarge fixed12. Presence <strong>of</strong> strong soci<strong>al</strong> and family line telephone network (with addition<strong>al</strong>identity2,600 telephones in city)13. Presence <strong>of</strong> adaptable and flexible 11. Forthcoming approv<strong>al</strong> <strong>of</strong> soci<strong>al</strong> servicescommunitylegislation49


MUNICIPALITY <strong>of</strong> SHKODRANegativeWeaknessesThreats1. Lack <strong>of</strong> favourable climate for businesses 1. Negative impact <strong>of</strong> centr<strong>al</strong> politics2. Low employment potenti<strong>al</strong>2. Lack <strong>of</strong> capit<strong>al</strong> investments by centr<strong>al</strong>authorities3. Discrepancy between requests forpr<strong>of</strong>ession<strong>al</strong> qu<strong>al</strong>ifications and3. Lack <strong>of</strong> public security, law and orderavailability <strong>of</strong> loc<strong>al</strong> training4. Presence <strong>of</strong> inform<strong>al</strong> trading, fisc<strong>al</strong> evasion4. Lack <strong>of</strong> implementation <strong>of</strong> urbanand creation <strong>of</strong> monopolieslegislation and bylaws by Territory5. Weaknesses in fisc<strong>al</strong> legislationRegulation Council6. Lack <strong>of</strong> stimuli for loc<strong>al</strong> producers5. Lack <strong>of</strong> regulatory plan and relevantprojects7. Unfavourable economic policies at centr<strong>al</strong>level6. M<strong>al</strong>administration and lack <strong>of</strong>registration <strong>of</strong> public property8. Presence <strong>of</strong> endemic corruption7. Lack <strong>of</strong> urban cadastre keeping9. Immigration from rur<strong>al</strong> areas and forceddocumentation orderlybrain drain8. Depreciation <strong>of</strong> engineering works: 10. Slow pace <strong>of</strong> decentr<strong>al</strong>isation processwater, sewage & electricity systems11. Impact <strong>of</strong> unsustainable economic factors9. Low level <strong>of</strong> project implementation and (inflation, high interest rates on loans,checksadministrative barriers, poor system <strong>of</strong>property rights)10. Lack <strong>of</strong> control <strong>of</strong> territory by municip<strong>al</strong>administration12. Unfavourable nation<strong>al</strong> strategies forsheltering11. Illeg<strong>al</strong> interventions in water & electricitysupply networks13. Changes in water regime <strong>of</strong> lake and riversBuna, Kir and Drin12. Low level <strong>of</strong> loc<strong>al</strong> revenues14. Lack <strong>of</strong> provision <strong>of</strong> soci<strong>al</strong> services for <strong>al</strong>l13. Lack <strong>of</strong> transparencygroups in need (children who do not go to14. Absence <strong>of</strong> digitised civil registry and school, families with problems, etc)statistic<strong>al</strong> databases15. Poor attendance in pre-school institutionsand excess number <strong>of</strong> schools forobligatory education16. Weak infrastructure and poor financi<strong>al</strong>support for culture, education,pr<strong>of</strong>ession<strong>al</strong> training and sportsinstitutions17. Absence <strong>of</strong> environment<strong>al</strong> protectionstrategy18. Lack <strong>of</strong> appropriate infrastructure50


. Matrix <strong>of</strong> Plan go<strong>al</strong>s, objectives, programmes and projects 51


MUNICIPALITY <strong>of</strong> SHKODRA52


Go<strong>al</strong>s Objectives Programmes Projects No.31G2:O1:PG1:p1: Preservation, restoration and development<strong>of</strong> the city's museum and its collection, as well as other32historic<strong>al</strong>, cultur<strong>al</strong> items in the cityG2:O1:PG1:p2: Creation <strong>of</strong> a system for identification,v<strong>al</strong>uation and purchasing <strong>of</strong> museum artefacts33G2:O1:PG1:p3: Rehabilitation and periodic exhibition <strong>of</strong> theMuseum's historic<strong>al</strong> archive34G2:O1:PG1:p4: Periodic numismatics exhibition <strong>of</strong>‘Monetary circulation in the region <strong>of</strong> Shkodra’3536G2:O1:PG1:p5: Increase the number <strong>of</strong> displays exhibited inthe Archaeologic<strong>al</strong> MuseumG2:O1:PG1:p6: Improvement <strong>of</strong> the environment <strong>of</strong> theMigjeni TheatreG2:O1:PG1:Good administration anddisplay in Shkodra <strong>of</strong> thecity's cultur<strong>al</strong> heritageG2:O1:PG1:p7: Rehabilitation <strong>of</strong> the city's Cultur<strong>al</strong> Centre 3738G2:O1:PG1:p8: Promotion <strong>of</strong> the photograph collection <strong>of</strong>the Marubi MuseumG2:O1:PG1:p9: Restoration <strong>of</strong> tradition<strong>al</strong> houses in the city 39G2:O1:Increase from 50 per year to70 per year the number <strong>of</strong>cultur<strong>al</strong> and artistic activitiesheld in Shkodra by the year201040G2:O1:PG2:p1: Establishment <strong>of</strong> a Commission for theDevelopment <strong>of</strong> Art and CultureGo<strong>al</strong> 2:Development andpreservation <strong>of</strong> thecultur<strong>al</strong>, historic<strong>al</strong> andartistic traditions andv<strong>al</strong>ues <strong>of</strong> Shkodra andtheir promotion to thebenefit <strong>of</strong> tourismdevelopmentG2:O1:PG2:p2: Establishment <strong>of</strong> a city orchestra 4142G2:O1:PG2:p3: Holding <strong>of</strong> a Summer's Day festiv<strong>al</strong> inShkodraG2:O1:PG2:p4: Holding <strong>of</strong> a Carniv<strong>al</strong> in Shkodra 43G2:O1:PG2:p5: Holding <strong>of</strong> an annu<strong>al</strong> song contest 44G2:O1:PG2:Reintroduction andpromotion <strong>of</strong> tradition<strong>al</strong>historic<strong>al</strong> and cultur<strong>al</strong>events45G2:O1:PG2:p6: Development and publication <strong>of</strong>promotion<strong>al</strong> materi<strong>al</strong>s related to the cultur<strong>al</strong> heritage <strong>of</strong> the46cityG2:O1:PG2:p7: Preparation and publication <strong>of</strong> a c<strong>al</strong>endar <strong>of</strong>annu<strong>al</strong> cultur<strong>al</strong> activities to be held in Shkodra53


MUNICIPALITY <strong>of</strong> SHKODRA54Go<strong>al</strong>s Objectives Programmes Projects No.47G3:O1:PG1:p1: Rehabilitation <strong>of</strong> existing, and construction<strong>of</strong> new, teaching facilities in Luigj Gurakuqi University48G3:O1:PG1:p2: Construction <strong>of</strong> student residence at LuigjGurakuqi University49G3:O1:PG1:p3: Construction <strong>of</strong> a new library in LuigjGurakuqi UniversityG3:O1:PG1:Improvement <strong>of</strong>infrastructure foraccommodation, teachingand other student services atthe university50G3:O1:PG2:p1: Establishment <strong>of</strong> an Arts Academy at LuigjGurakuqi UniversityG3:O1:PG2:p2: Development by the Economics and Law51Faculty <strong>of</strong> Luigj Gurakuqi University <strong>of</strong> curricula for tourismand for public administration trainingG3:O1:PG2:Increase the qu<strong>al</strong>ity andscope <strong>of</strong> the curriculum andteaching at the university52G3:O1:PG2:p3: Implementation <strong>of</strong> a distance learningproject at Luigj Gurakuqi UniversityG3:O1:PG3:p1: Development and implementation <strong>of</strong> a53programme for exchange <strong>of</strong> scientific and technic<strong>al</strong>knowledge between Luigj Gurakuqi University anduniversities in the region and elsewhereG3:O1:Increase from 4,500 to 7,500the number <strong>of</strong> studentsgraduating from Shkodra'sLuigj Gurakuqi University bythe year 2012, with aqu<strong>al</strong>itative improvement <strong>of</strong>university facilities andteaching standardsG3:O1:PG3:p2: Establish a funding system at Luigj54Gurakuqi University to support and increase researchcapacities and to ensure knowledge transfer in the field <strong>of</strong>region<strong>al</strong> economic developmentG3:O1:PG3:Establishment <strong>of</strong> sustainedpartnerships and links in thecontext <strong>of</strong> region<strong>al</strong>Go<strong>al</strong> 3:The city as a highereducation centre forNorth Albania, with itsuniversity as a key factorin creating an educatedworkforce throughincreasing and improvingthe level <strong>of</strong> academic andpr<strong>of</strong>ession<strong>al</strong> educationdevelopment G3:O1:PG3:p3: Recruitment and development <strong>of</strong> qu<strong>al</strong>ified55academic staff at Luigj Gurakuqi University to a level<strong>al</strong>lowing for qu<strong>al</strong>ity teaching and to the standards <strong>of</strong> theBologna Declaration56G3:O2:PG1:p1: Rehabilitation <strong>of</strong> Preng Jakova MiddleSchoolG3:O2:PG1:p2: Rehabilitation <strong>of</strong> Skenderbeg 9-Year School 57G3:O2:PG1:Reconstruction <strong>of</strong> Shkodra'spre-university educationfacilitiesG3:O2:PG1:p3: Rehabilitation <strong>of</strong> Guerrile Kindergarten 58G3:O2:Increase by year 2006 thenumber <strong>of</strong> pre-universityeducation facilities that are inqu<strong>al</strong>itative and optim<strong>al</strong>condition


Go<strong>al</strong>s Objectives Programmes Projects No.59G4:O1:PG1:p1: Development <strong>of</strong> a comprehensiveregulatory urban plan for the city60G4:O1:PG1:p2: Development <strong>of</strong> a parti<strong>al</strong> urban plan for theShirokë – Zogaj area61G4:O1:PG1:p3: Development <strong>of</strong> parti<strong>al</strong> urban plans for theareas <strong>of</strong> Mark Lulaj, Hardhijat e Egra and ZooteknikëG4:O1:PG1:Improvement <strong>of</strong> theplanning tools for urbandevelopment andG4:O1:Development <strong>of</strong> the leg<strong>al</strong> andtechnic<strong>al</strong> tools necessary forqu<strong>al</strong>ity urban planning andmanagement <strong>of</strong> the city'sterritory by the year 20106263management <strong>of</strong> the city G4:O1:PG1:p4: Development <strong>of</strong> an action plan forimplementation <strong>of</strong> the comprehensive regulatory urban planand parti<strong>al</strong> urban plansG4:O2:PG1:p1: Reconstruction <strong>of</strong> 15 streets <strong>of</strong> the city(Annex 4)64G4:O2:PG1:p2: Reconstruction <strong>of</strong> pavements in 12 streets(Annex 4)G4:O2:PG1:Rehabilitation <strong>of</strong> the city'sstreet system65G4:O2:PG1:p3: Reconstruction <strong>of</strong> the public lighting <strong>of</strong> 8streets (Annex 4)66G4:O2:PG2:p1: Rehabilitation <strong>of</strong> 5 surface water drainageoutlets from the city (Annex 4)G4:O2:PG2:Rehabilitation <strong>of</strong> the city'swater drainage systemG4:O2:Rehabilitation <strong>of</strong> 40% <strong>of</strong> thecity's streets, with provision <strong>of</strong>drainage, pavements andpublic lighting by the year2010Go<strong>al</strong> 4:A city with qu<strong>al</strong>itativecontemporary standards<strong>of</strong> infrastructure andpublic services thatstimulate and supportsustainable development<strong>of</strong> the loc<strong>al</strong> economy inharmony with theenvironment67G4:O3:PG1:p1: Rehabilitation <strong>of</strong> the city's sewage pumpingstation68G4:O3:PG1:p2: Construction and rehabilitation <strong>of</strong> sewagedischarge pipes69G4:O3:PG1:p3: Improvement <strong>of</strong> sewage systemmaintenance technologyG4:O3:PG1:Rehabilitation <strong>of</strong> the city'ssewer system70G4:O3:PG1:p4: Construction <strong>of</strong> new pipelines for sewersystemG4:O3:Increase from 15,000 to24,800 the number <strong>of</strong> familiesand businesses connected tothe sewage system by the year201055


MUNICIPALITY <strong>of</strong> SHKODRA56Go<strong>al</strong>s Objectives Programmes Projects No.71G4:O4:PG1:p1: Complete construction <strong>of</strong> mains watersupply reservoirs in Tepe Hills72G4:O4:PG1:p2: Inst<strong>al</strong>lation <strong>of</strong> new v<strong>al</strong>ves in the mainswater distribution system73G4:O4:PG1:p3: Rehabilitation <strong>of</strong> the rest <strong>of</strong> the mains waterdistribution networkG4:O4:PG1:Rehabilitation <strong>of</strong> the mainswater systemG4:O4:Increase from 22,700 to24,800 the number <strong>of</strong> familiesand businesses connected tothe mains water system by theyear 201074G4:O4:PG1:p4: Inst<strong>al</strong>lation <strong>of</strong> auxiliary equipment formains water managementG4:O5:PG1:G4:O5:PG1:p1: Rehabilitation <strong>of</strong> the greening <strong>of</strong> the city'sImproved greening <strong>of</strong> the75main streetscity's streetsG4:O5:PG2:G4:O5:PG2:p1: Rehabilitation <strong>of</strong> the green space by the76Rehabilitation <strong>of</strong> the mainBazaarpublic parks G4:O5:PG2:p2: Rehabilitation <strong>of</strong> Luigj Gurakuqi Park 7778G4:O5:PG3:p1: Construction <strong>of</strong> a new green space in theXhabije residenti<strong>al</strong> areaG4:O5:Increase by 45% the tot<strong>al</strong> size<strong>of</strong> the city's green areas by theyear 201079G4:O5:PG3:p2: Construction <strong>of</strong> a new green space <strong>al</strong>ongIsuf Sokoli Street in the Bacja e Cakajve residenti<strong>al</strong> areaG4:O5:PG3:Creation <strong>of</strong> new green sitesin residenti<strong>al</strong> areasGo<strong>al</strong> 4:A city with qu<strong>al</strong>itativecontemporary standards<strong>of</strong> infrastructure andpublic services thatstimulate and supportsustainable development<strong>of</strong> the loc<strong>al</strong> economy inharmony with theenvironment80G4:O5:PG3:p3: Construction <strong>of</strong> a green area in the Zdr<strong>al</strong>eneighbourhood81G4:O6:PG1:p1: Construction <strong>of</strong> a landfill for urban solidwaste dispos<strong>al</strong>82G4:O6:PG1:p2: Improvement <strong>of</strong> the technology forcollection, transportation and management <strong>of</strong> municip<strong>al</strong> solidwasteG4:O6:PG1:Improvement <strong>of</strong> themanagement <strong>of</strong> municip<strong>al</strong>solid waste83G4:O6:PG1:p3: Development <strong>of</strong> an awareness campaign‘Keep Shkodra Clean’G4:O6:Increase from 352,588 m² to559,645 m² the area <strong>of</strong> the citycovered by the wastecollection service by the year2010


Go<strong>al</strong>s Objectives Programmes Projects No.G5:O1:PG1:p1: Construction <strong>of</strong> a Youth Centre in the city 848586G5:O1:PG1:p2: Rehabilitation <strong>of</strong> the sports facilities in thecity's schoolsG5:O1:PG1:p3: Construction <strong>of</strong> public and private sportsfacilitiesG5:O1:PG1:p4: Construction <strong>of</strong> an indoor athletics stadium 87G5:O1:PG1:Construction <strong>of</strong> new, andrehabilitation <strong>of</strong> existing,public recreation<strong>al</strong> andsports facilitiesG5:O1:Increase from 9 to 18 thenumber <strong>of</strong>, and improve theexisting, recreation<strong>al</strong> andsports facilities in the city bythe year 2015G5:O1:PG1:p5: Construction <strong>of</strong> a wrestling gymnasium 8889G5:O2:PG1:p1: Organisation in the city <strong>of</strong> Spring andAutumn sports events, such as <strong>org</strong>anised sports leagues, forelementary and secondary schools and for older age groupsG5:O2:PG1:Stimulation and promotion<strong>of</strong> sports events in the cityG5:O2:Increase from 0 to 6 thenumber <strong>of</strong> annu<strong>al</strong> amateursports activities held in thecity by the year 201090G5:O3:PG1:p1: Computerisation <strong>of</strong> the Civil RegistryOffice91G5:O3:PG1:p2: Development <strong>of</strong> a database, and relevantcomputer s<strong>of</strong>tware, <strong>of</strong> <strong>al</strong>l addresses in ShkodraG5:O3:PG1:Modernisation <strong>of</strong> the civilregistry service92G5:O3:PG2:p1: Conducting <strong>of</strong> a survey to assess thecurrent soci<strong>al</strong> situation for Shkodra residents93G5:O3:PG2:p2: Increase in the capacities <strong>of</strong> the municip<strong>al</strong>administration and loc<strong>al</strong> NGOs to provide soci<strong>al</strong> servicesG5:O3:PG2:p3: Construction <strong>of</strong> 3 soci<strong>al</strong> centres formargin<strong>al</strong>ised community groups and provision <strong>of</strong> soci<strong>al</strong>services in partnership with loc<strong>al</strong> NGOsG5:O3:PG2:Improvement and increasein number <strong>of</strong> soci<strong>al</strong> servicesprovided for the communityG5:O3:Improvement <strong>of</strong> the city'ssoci<strong>al</strong> services system andextension from 2 to 4 <strong>of</strong> thenumber <strong>of</strong> support systems byyear 2010Go<strong>al</strong> 5:Achieve for Shkodra'sresidents a he<strong>al</strong>thierlifestyle with promotion<strong>of</strong> sports, improvement <strong>of</strong>the city's sports facilitiesand improved access tohe<strong>al</strong>th and soci<strong>al</strong> services9495G5:O4:PG1:p1: Reconstruction <strong>of</strong> community he<strong>al</strong>th centrein Tre Heronjt9697G5:O4:PG1:p2: Reconstruction <strong>of</strong> community he<strong>al</strong>th centrein PartizaniG5:O4:PG1:p3: Reconstruction <strong>of</strong> he<strong>al</strong>th centres in Zogajand ShirokëG5:O4:PG1:Improvement <strong>of</strong> primaryhe<strong>al</strong>th care services in thecityG5:O4:Reconstruction <strong>of</strong> 3 he<strong>al</strong>thcentres and construction <strong>of</strong> anew he<strong>al</strong>th centre in the cityby 201098G5:O4:PG1:p4: Construction <strong>of</strong> a new he<strong>al</strong>th centre inVojo Kushi57


MUNICIPALITY <strong>of</strong> SHKODRA58c. Implementation Matrix <strong>of</strong> the Strategic PlanAcronyms are reported in Annex 1


MUNICIPALITY <strong>of</strong> SHKODRA 60


MUNICIPALITY <strong>of</strong> SHKODRA 62


MUNICIPALITY <strong>of</strong> SHKODRA 64


MUNICIPALITY <strong>of</strong> SHKODRA 66


MUNICIPALITY <strong>of</strong> SHKODRA 68


MUNICIPALITY <strong>of</strong> SHKODRA70 *, 1 Euro = 125 Leke; 1 USD = 100 Leke.†, IS, Implementation Started; FA, Funding Approved; SF, Searching for Funding.


d. Matrix <strong>of</strong> prioritisation <strong>of</strong> projectsp p jFulfilment <strong>of</strong> objectivesTarget group(Gener<strong>al</strong>/Specific/Sm<strong>al</strong>l)Risk level(High/Medium/Low)Implemented previously(Yes/No)Expertise available(Yes/Possible/No)Guarantee found (Yes/No)Identified sources found(High/Medium/Low)Hard/S<strong>of</strong>tProject TitleProject Matrix No.Project CodeProject Priority No.H H Yes Yes No L G 31 G1:O3:PG1:p5 18 Establishment <strong>of</strong> a system for integrated management <strong>of</strong> LakeShkodra ecosystemS M Yes Yes No L G 12 G5:O3:PG1:p2 91 Development <strong>of</strong> a database, and relevant computer s<strong>of</strong>tware, <strong>of</strong><strong>al</strong>l addresses in Shkodra3 G3:O1:PG1:p3 49 Construction <strong>of</strong> a new library in Luigj Gurakuqi University H H Yes Yes No L Sp 24 G1:O1:PG1:p1 1 Improvement <strong>of</strong> the electricity supply within Industri<strong>al</strong> Zone H H Yes Yes Yes H Sp 3H H Yes P No M Sp 25 G1:O3:PG1:p6 19 Make operation<strong>al</strong> a lake transportation service between Shkodraand Virpazar, MontenegroH H Yes Yes Yes L G 16 G1:O4:PG1:p1 20 Construction in the city <strong>of</strong> a public wholes<strong>al</strong>e market place forfruit and vegetables7 G4:O3:PG1:p1 67 Rehabilitation <strong>of</strong> the city's sewage pumping station H M Yes Yes Yes M G 28 G1:O1:PG1:p4 4 Rehabilitation <strong>of</strong> road infrastructure within Industri<strong>al</strong> Zone H H Yes Yes Yes M Sp 39 G4:O3:PG1:p2 68 Construction and rehabilitation <strong>of</strong> sewage discharge pipes H M No Yes Yes L G 210 G4:O6:PG1:p1 81 Construction <strong>of</strong> a landfill for urban solid waste dispos<strong>al</strong> H H Yes P No M G 211 G4:O4:PG1:p3 73 Rehabilitation <strong>of</strong> the rest <strong>of</strong> the mains water distribution network H M Yes Yes Yes L G 212 G3:O2:PG1:p1 56 Rehabilitation <strong>of</strong> Preng Jakova Middle School H M No Yes Yes M Sp 313 G3:O2:PG1:p2 57 Rehabilitation <strong>of</strong> Skenderbeg 9-Year School H M No Yes Yes M Sp 314 G3:O2:PG1:p3 58 Rehabilitation <strong>of</strong> Guerrile Kindergarten H M No Yes Yes M Sp 315 G4:O2:PG1:p2 64 Reconstruction <strong>of</strong> pavements in 12 streets (Annex 4) H M Yes Yes Yes M G 216 G4:O6:PG1:p3 83 Development <strong>of</strong> an awareness campaign ‘Keep Shkodra Clean’ S H No Yes No M G 317 G5:O1:PG1:p1 84 Construction <strong>of</strong> a Youth Centre in the city H M No Yes No M Sp 318 G2:O1:PG1:p6 36 Improvement <strong>of</strong> the environment <strong>of</strong> the Migjeni Theatre H M No Yes Yes L G 219 G4:O2:PG1:p1 63 Reconstruction <strong>of</strong> 15 streets <strong>of</strong> the city (Annex 4) H M No Yes Yes M G 2Increase the number <strong>of</strong> displays exhibited in the Archaeologic<strong>al</strong>20 G2:O1:PG1:p5 35 MuseumHM No Yes Yes M G 121 G4:O3:PG1:p3 69 Improvement <strong>of</strong> sewage system maintenance technology H M No Yes Yes L G 222 G2:O1:PG2:p5 44 Holding <strong>of</strong> an annu<strong>al</strong> song contest S H No Yes Yes L G 1Establishment <strong>of</strong> a board to facilitate an increase in and23 G1:O3:PG1:p1 14 strengthening <strong>of</strong> cross-border cooperationSH Yes Yes No M G 124 G4:O3:PG1:p4 70 Construction <strong>of</strong> new pipelines for sewer system H M No Yes Yes L G 271


MUNICIPALITY <strong>of</strong> SHKODRA72Fulfilment <strong>of</strong> objectivesTarget group(Gener<strong>al</strong>/Specific/Sm<strong>al</strong>l)Risk level(High/Medium/Low)Implemented previously(Yes/No)Expertise available(Yes/Possible/No)Guarantee found (Yes/No)Identified sources found(High/Medium/Low)Hard/S<strong>of</strong>tProject TitleProject Matrix No.Project CodeProject Priority No.Conducting <strong>of</strong> a survey to assess the current soci<strong>al</strong> situation for25 G5:O3:PG2:p1 92S H Yes Yes Yes M Sm 1Shkodra residentsIncrease in the capacities <strong>of</strong> the municip<strong>al</strong> administration and26 G5:O3:PG2:p2 93S H Yes Yes Yes M Sp 1loc<strong>al</strong> NGOs to provide soci<strong>al</strong> services27 G2:O1:PG2:p4 43 Holding <strong>of</strong> a Carniv<strong>al</strong> in Shkodra S H No Yes Yes L G 1Conducting <strong>of</strong> a study on workforce supply and provision <strong>of</strong>28 G1:O2:PG1:p5 13S H No Yes Yes L Sp 2training for businessesProduction <strong>of</strong> information brochure on Shkodra's amenities and29 G1:O5:PG1:p8 29 facilities, including hotels, transportation services, restaurants, S H Yes Yes No L G 2etc.Construction <strong>of</strong> 3 soci<strong>al</strong> centres for margin<strong>al</strong>ised community30 G5:O3:PG2:p3 94 groups and provision <strong>of</strong> soci<strong>al</strong> services in partnership with loc<strong>al</strong> S H Yes Yes No M G 1NGOsPeriodic numismatics exhibition <strong>of</strong> ‘Monetary circulation in the31 G2:O1:PG1:p4 34H M No Yes No M G 1region <strong>of</strong> Shkodra’Complete construction <strong>of</strong> mains water supply reservoirs in Tepe32 G4:O4:PG1:p1 71H M Yes Yes Yes L G 2Hills33 G4:O5:PG2:p2 77 Rehabilitation <strong>of</strong> Luigj Gurakuqi Park H H Yes Yes Yes L G 234 G2:O1:PG1:p7 37 Rehabilitation <strong>of</strong> the city's Cultur<strong>al</strong> Centre H L No Yes No M G 235 G4:O1:PG1:p2 60 Development <strong>of</strong> a parti<strong>al</strong> urban plan for the Shirokë – Zogaj area S L Yes Yes No M Sp 2S H No Yes No M Sp 1Preparation <strong>of</strong> an information package for foreign investors ontrade and investment potenti<strong>al</strong> in ShkodraEstablishment <strong>of</strong> a Commission for the Development <strong>of</strong> Art andCulture36 G1:O3:PG1:p2 15S M No Yes No M G 137 G2:O1:PG2:p1 4038 G1:O5:PG1:p7 28 Development <strong>of</strong> a tourism marketing strategy for the city S H No Yes No M G 139 G1:O5:PG1:p1 22 Development <strong>of</strong> a tourism strategy for the city <strong>of</strong> Shkodra S L No Yes No M G 2H M No P No M G 1Rehabilitation and periodic exhibition <strong>of</strong> the Museum's historic<strong>al</strong>archiveDevelopment <strong>of</strong> a map <strong>of</strong> businesses operating in the Industri<strong>al</strong>Zone40 G2:O1:PG1:p3 33S H Yes Yes No M Sp 141 G1:O1:PG2:p1 742 G5:O4:PG1:p4 98 Construction <strong>of</strong> a new he<strong>al</strong>th centre in Vojo Kushi H M No Yes Yes M Sp 343 G4:O5:PG1:p1 75 Rehabilitation <strong>of</strong> the greening <strong>of</strong> the city's main streets H M Yes Yes Yes M G 2


Fulfilment <strong>of</strong> objectivesTarget group(Gener<strong>al</strong>/Specific/Sm<strong>al</strong>l)Risk level(High/Medium/Low)Implemented previously(Yes/No)Expertise available(Yes/Possible/No)Guarantee found (Yes/No)Identified sources found(High/Medium/Low)Hard/S<strong>of</strong>tProject TitleProject Matrix No.Project CodeProject Priority No.44 G2:O1:PG2:p2 41 Establishment <strong>of</strong> a city orchestra H M No Yes Yes M G 145 G1:O5:PG1:p6 27 Development <strong>of</strong> a programme to encourage family- and ecotourismin Shirokë and ZogajL No P No M Sp 2H46 G4:O1:PG1:p1 59 Development <strong>of</strong> a comprehensive regulatory urban plan for theScityL No P No M G 147 G2:O1:PG2:p6 45 Development and publication <strong>of</strong> promotion<strong>al</strong> materi<strong>al</strong>s related toSthe cultur<strong>al</strong> heritage <strong>of</strong> the cityH No Yes Yes M Sm 1H M No Yes Yes M G 248 G4:O6:PG1:p2 82 Improvement <strong>of</strong> the technology for collection, transportation andmanagement <strong>of</strong> municip<strong>al</strong> solid wasteS L No Yes No M G 249 G1:O5:PG1:p3 24 Establishment <strong>of</strong> a network <strong>of</strong> hotels and restaurants in the cityto improve their standards and diversify their servicesH M No Yes Yes M Sp 3Rehabilitation <strong>of</strong> surface water drainage and sewage systems inG1:O1:PG1:p3 3Industri<strong>al</strong> Zone50H M Yes Yes Yes L Sp 2Inst<strong>al</strong>lation <strong>of</strong> new telephone lines and renovation <strong>of</strong> existingG1:O1:PG1:p5 5network within Industri<strong>al</strong> Zone5152 G4:O5:PG3:p1 78 Construction <strong>of</strong> a new green space in the Xhabije residenti<strong>al</strong> area H M Yes Yes Yes L G 253 G2:O1:PG2:p3 42 Holding <strong>of</strong> a Summer's Day festiv<strong>al</strong> in Shkodra S H No Yes Yes L G 1H M No Yes Yes M Sp 3Improvement and expansion <strong>of</strong> green spaces within Industri<strong>al</strong>G1:O1:PG1:p6 6Zone5455 G4:O2:PG1:p3 65 Reconstruction <strong>of</strong> the public lighting <strong>of</strong> 8 streets (Annex 4) H M No Yes Yes H G 256 G1:O3:PG1:p4 17 Construction <strong>of</strong> a business fair centre H M No Yes No M G 257 G1:O3:PG1:p3 16 Establishment <strong>of</strong> a region<strong>al</strong> business training centre H M No Yes No M Sp 2H L No Yes Yes M G 258 G4:O2:PG2:p1 66 Rehabilitation <strong>of</strong> 5 surface water drainage outlets from the city(Annex 4)59 G5:O4:PG1:p3 97 Reconstruction <strong>of</strong> he<strong>al</strong>th centres in Zogaj and Shirokë H M No Yes Yes M Sp 360 G5:O1:PG1:p4 87 Construction <strong>of</strong> an indoor athletics stadium H M No Yes Yes M Sp 261 G1:O5:PG1:p4 25 Establishment <strong>of</strong> a trade centre for artisan products H H Yes Yes No M Sm 2H L No Yes No M G 162 G4:O1:PG1:p4 62 Development <strong>of</strong> an action plan for implementation <strong>of</strong> thecomprehensive regulatory urban plan and parti<strong>al</strong> urban plans63 G1:O1:PG1:p2 2 Improvement <strong>of</strong> street lighting within Industri<strong>al</strong> Zone H M No Yes Yes H Sp 364 G5:O4:PG1:p1 95 Reconstruction <strong>of</strong> community he<strong>al</strong>th centre in Tre Heronjt H M No Yes Yes M Sp 365 G4:O4:PG1:p4 74 Inst<strong>al</strong>lation <strong>of</strong> auxiliary equipment for mains water management H M No Yes Yes L G 273


74MUNICIPALITY <strong>of</strong> SHKODRA


Fulfilment <strong>of</strong> objectivesTarget group(Gener<strong>al</strong>/Specific/Sm<strong>al</strong>l)Risk level(High/Medium/Low)Implemented previously(Yes/No)Expertise available(Yes/Possible/No)Guarantee found (Yes/No)Identified sources found(High/Medium/Low)Hard/S<strong>of</strong>tProject TitleProject Matrix No.Project CodeProject Priority No.87 G5:O3:PG1:p1 90 Computerisation <strong>of</strong> the Civil Registry Office S L No No No H G 1S L No No No H Sp 1Recruitment and development <strong>of</strong> qu<strong>al</strong>ified academic staff at88 G3:O1:PG3:p3 55 Luigj Gurakuqi University to a level <strong>al</strong>lowing for qu<strong>al</strong>ityteaching and to the standards <strong>of</strong> the Bologna DeclarationS L No P No H G 1support and increase research capacities and to ensureknowledge transfer in the field <strong>of</strong> region<strong>al</strong> economicdevelopment89 G3:O1:PG3:p2 54 Establish a funding system at Luigj Gurakuqi University toH L No P Yes H Sp 1Preservation, restoration and development <strong>of</strong> the city's museum90 G2:O1:PG1:p1 31 and its collection, as well as other historic<strong>al</strong>, cultur<strong>al</strong> items in thecityS L No P Yes H Sp 191 G2:O1:PG1:p2 32 Creation <strong>of</strong> a system for identification, v<strong>al</strong>uation and purchasing<strong>of</strong> museum artefactsS L No P Yes H Sp 1Development and implementation <strong>of</strong> a programme for exchange92 G3:O1:PG3:p1 53 <strong>of</strong> scientific and technic<strong>al</strong> knowledge between Luigj GurakuqiUniversity and universities in the region and elsewhereS L No P No H G 193 G2:O1:PG1:p8 38 Promotion <strong>of</strong> the photograph collection <strong>of</strong> the Marubi Museum S L No P Yes H Sp 194 G5:O1:PG1:p3 86 Construction <strong>of</strong> public and private sports facilities H L No P Yes H Sp 195 G2:O1:PG2:p7 46 Preparation and publication <strong>of</strong> a c<strong>al</strong>endar <strong>of</strong> annu<strong>al</strong> cultur<strong>al</strong>activities to be held in ShkodraH M No P Yes H G 196 G1:O4:PG1:p2 21 Construction in the city <strong>of</strong> new fruit, vegetable, fish and meatretail market places97 G3:O1:PG2:p3 52 Implementation <strong>of</strong> a distance learning project at Luigj GurakuqiUniversitySL No No No H Sp 198 G3:O1:PG2:p1 50 Establishment <strong>of</strong> an Arts Academy at Luigj Gurakuqi University S L No P No H Sp 175


MUNICIPALITY <strong>of</strong> SHKODRAe. Project fiches76


MUNICIPALITY <strong>of</strong> SHKODRA78


MUNICIPALITY <strong>of</strong> SHKODRA80


MUNICIPALITY <strong>of</strong> SHKODRA82


MUNICIPALITY <strong>of</strong> SHKODRA84


MUNICIPALITY <strong>of</strong> SHKODRA86


MUNICIPALITY <strong>of</strong> SHKODRA88


MUNICIPALITY <strong>of</strong> SHKODRA90


MUNICIPALITY <strong>of</strong> SHKODRA92


MUNICIPALITY <strong>of</strong> SHKODRA94


MUNICIPALITY <strong>of</strong> SHKODRA96


MUNICIPALITY <strong>of</strong> SHKODRA98


MUNICIPALITY <strong>of</strong> SHKODRA100


101


MUNICIPALITY <strong>of</strong> SHKODRA102


103


MUNICIPALITY <strong>of</strong> SHKODRA104


105


MUNICIPALITY <strong>of</strong> SHKODRA106


107


MUNICIPALITY <strong>of</strong> SHKODRA108


109


MUNICIPALITY <strong>of</strong> SHKODRA110


111


MUNICIPALITY <strong>of</strong> SHKODRA112


113


MUNICIPALITY <strong>of</strong> SHKODRA114


115


MUNICIPALITY <strong>of</strong> SHKODRA116


117


MUNICIPALITY <strong>of</strong> SHKODRA118


119


MUNICIPALITY <strong>of</strong> SHKODRA120


121


MUNICIPALITY <strong>of</strong> SHKODRA122


123


MUNICIPALITY <strong>of</strong> SHKODRA124


125


MUNICIPALITY <strong>of</strong> SHKODRA126


127


MUNICIPALITY <strong>of</strong> SHKODRA128


129


MUNICIPALITY <strong>of</strong> SHKODRA130


131


MUNICIPALITY <strong>of</strong> SHKODRA132


133


MUNICIPALITY <strong>of</strong> SHKODRA134


135


MUNICIPALITY <strong>of</strong> SHKODRA136


137


MUNICIPALITY <strong>of</strong> SHKODRA138


139


MUNICIPALITY <strong>of</strong> SHKODRA140


141


MUNICIPALITY <strong>of</strong> SHKODRA142


143


MUNICIPALITY <strong>of</strong> SHKODRA144


145


MUNICIPALITY <strong>of</strong> SHKODRA146


147


MUNICIPALITY <strong>of</strong> SHKODRA148


149


MUNICIPALITY <strong>of</strong> SHKODRA150


151


MUNICIPALITY <strong>of</strong> SHKODRA152


153


MUNICIPALITY <strong>of</strong> SHKODRA154


155


MUNICIPALITY <strong>of</strong> SHKODRA156


157


MUNICIPALITY <strong>of</strong> SHKODRA158


159


MUNICIPALITY <strong>of</strong> SHKODRA160


161


MUNICIPALITY <strong>of</strong> SHKODRA162


163


MUNICIPALITY <strong>of</strong> SHKODRA164Annex 1: Acronyms used in the Implementation MatrixAA Advertising AgenciesAB Artisan BusinessAC Artists <strong>of</strong> the CityAFF Albanian Footb<strong>al</strong>l FederationAG Arts GroupsASB Association <strong>of</strong> Shkodra BusinessesASp Amateur SportspersonsAT Shkodra Branch <strong>of</strong> AlbtelecomAuG Austrian GovernmentBC Business CommunityBIZ Businesses <strong>of</strong> Industri<strong>al</strong> ZoneBR Businesses in the RegionC ChildrenCA State Centr<strong>al</strong> ArchiveCC Cross-border CitiesCCI Chamber <strong>of</strong> Commerce and IndustryCE Cleaning EnterpriseCG Centr<strong>al</strong> GovernmentCo CommunityCoV Commune <strong>of</strong> VeniceD DonorsE EmployeesECD Economic Centre for DevelopmentF FarmersFB Foreign BusinessesFVM Fruit and Vegetable MerchantsGA Group <strong>of</strong> ArchaeologistsGE Group <strong>of</strong> EthnographersGH Group <strong>of</strong> HistoriansGTZ Deutsche Gesellschaft für TechnischeZusammenarbeitH HotelsHM History Museum <strong>of</strong> ShkodraIA Art Performing InstitutionsIAR Institute <strong>of</strong> Archaeologic<strong>al</strong> ResearchIC Institute <strong>of</strong> CultureK City <strong>of</strong> KoplikKESH Albanian Electricity CorporationKfW Kreditanst<strong>al</strong>t für WiederaufbauLC Loc<strong>al</strong> CommunityLRA Laboratory <strong>of</strong> Restoration andArchinometryM Municip<strong>al</strong>ity <strong>of</strong> ShkodraMA Ministry <strong>of</strong> Agriculture and FoodMC Ministry <strong>of</strong> Culture, Youth and SportsMuC Music<strong>al</strong> Community <strong>of</strong> ShkodraME Ministry <strong>of</strong> EconomyMES Ministry <strong>of</strong> Education and ScienceMG Montenegrin GovernmentMH Ministry <strong>of</strong> He<strong>al</strong>thML Ministry <strong>of</strong> Labour and Soci<strong>al</strong> AffairsMLGD Ministry <strong>of</strong> Loc<strong>al</strong> Government andDecentr<strong>al</strong>isationMT Ministry <strong>of</strong> Territori<strong>al</strong> Adjustmentand TourismNGO Non-government<strong>al</strong> OrganisationP PupilsPA Performing artistsPI Public InstitutionsPrI Processing IndustryPJA Preng Jakova AssociationR Bars and RestaurantsREA Region<strong>al</strong> Environment<strong>al</strong> AgencyRDE Region<strong>al</strong> Directorate <strong>of</strong> EducationRED Region<strong>al</strong> Employment DirectorateRHD Region<strong>al</strong> He<strong>al</strong>th DirectorateRPD Region<strong>al</strong> Police DirectorateRSh Region <strong>of</strong> ShkodraS StudentsSC Sports ClubsScC Scientific Community in the CitySCV Vllaznia Sports ClubT TouristsTA Tourist AgenciesTB Tourism BusinessesTEU Teuleda, Agency for Loc<strong>al</strong> EconomicDevelopmentU University <strong>of</strong> ShkodraUE UnemployedUNDP United Nations Development ProgramUNOPS United Nations Office for ProjectServicesVMS Vocation<strong>al</strong> Middle SchoolWB World BankWT Wrestling TeamY Youth


Annex 2: Report on ‘Survey on Loc<strong>al</strong>ly Enabling Business Environment’IntroductionThe business survey that formed part <strong>of</strong> the development <strong>of</strong> the Strategy was conducted during theperiod March to April, 2004 and is reported here. The purpose <strong>of</strong> the survey was to provide addition<strong>al</strong>information for the process <strong>of</strong> Loc<strong>al</strong> Economic Development planning in the Municip<strong>al</strong>ity <strong>of</strong> Shkodra.At the same time, the way the survey was carried was aimed at providing further experience for the<strong>municip<strong>al</strong>ity</strong>, particularly for the Development Office.The report below is a concise presentation <strong>of</strong> the main findings <strong>of</strong> the survey. In addition, a broaderreport was prepared, where the performance <strong>of</strong> <strong>al</strong>l five municip<strong>al</strong>ities that participated in the DELTAproject can be compared. The survey data are <strong>al</strong>so available electronic<strong>al</strong>ly, creating the opportunityfor each <strong>municip<strong>al</strong>ity</strong> to make further an<strong>al</strong>yses according to their needs.This survey was carried out in close collaboration with the Office <strong>of</strong> Economic Development in theMunicip<strong>al</strong>ity <strong>of</strong> Shkodra. Mr Ridvan Sokoli made a speci<strong>al</strong> contribution in <strong>org</strong>anising the survey.Statistic<strong>al</strong> description <strong>of</strong> the sample <strong>of</strong> businesses interviewed• Seventy-nine businesses were interviewed, making up about 3.3 per cent <strong>of</strong> those registeredin the Municip<strong>al</strong>ity (2,397 registered, according to the list provided by the <strong>municip<strong>al</strong>ity</strong>).• Opinions were collected from the following persons: owner in 73 businesses, gener<strong>al</strong> managerin two businesses and senior manager in four businesses.• Fourteen <strong>of</strong> the businesses had one owner, while 65 had more than one owner.• Thirteen <strong>of</strong> the businesses were manufacturing businesses, 36 were involved in trade, 23 inservice provision and seven were construction businesses.• The length <strong>of</strong> time that the businesses had been active ranged from two to twelve years, withmost being active from six to ten years.• Fifty-seven <strong>of</strong> the businesses reported that they had fewer than five employees, six had six toten employees, thirteen had eleven to 50 employees and three more than 50 employees.165


MUNICIPALITY <strong>of</strong> SHKODRAMain findingsOpinions about the business climate in Shkodra• 52% <strong>of</strong> businesses reported difficulties in finding qu<strong>al</strong>ified workers, while 42% reported theopposite. (Question 9.)• 24% <strong>of</strong> businesses reported that they were short <strong>of</strong> staff with s<strong>al</strong>es & marketing skills (takentogether), 22% declared a shortage in technic<strong>al</strong> personnel and 17% reported that they had ashortage in staff with management skills. (Question 10.)• 71% <strong>of</strong> businesses reported that the main source <strong>of</strong> competition came from loc<strong>al</strong> businesses.(Question 11.)• There are a number <strong>of</strong> business associations in the city, but these are not widely known in thecommunity. (Question 12.) 68% <strong>of</strong> businesses reported that they didn’t know about the supportthat these associations provide for businesses. (Question 22.)• The three main factors that were hindering business expansion were: electricity (64%),inform<strong>al</strong> competition and infrastructure (40%). However, other factors were mentioned very<strong>of</strong>ten in the reports. (Question 15.)• 50% <strong>of</strong> businesses reported that they needed fewer than 10 days to renew the licences for thefollowing year. (Question 16.)• The two biggest problems concerning relationship with loc<strong>al</strong> government were: corruptionand illeg<strong>al</strong> practices, and competition from the inform<strong>al</strong> market. (Question 17.)• More than 70% <strong>of</strong> businesses reported that had been inspected fewer than five times by thetax authority. 10% reported that they had paid fines and 4% that they had paid bribes to thetax authority. (Question 20.)• 11% <strong>of</strong> businesses declared that the Tax Department was hindering the expansion <strong>of</strong> theirbusiness and 1.3% declared the same for the Department <strong>of</strong> Services. (Question 25.)• 52% <strong>of</strong> the businesses reported that the business environment had worsened during the lastthree years. (Question 33.)Expectations <strong>of</strong> businesses• 33% <strong>of</strong> businesses reported that they plan to invest within the <strong>municip<strong>al</strong>ity</strong>. 44% reportedthat they do not plan to invest in the future. (Question 8.)• The three most mentioned expectations were: improved electricity supply, improvedinfrastructure and improved cleaning <strong>of</strong> the city. (Question 18.)166• More than 90% <strong>of</strong> businesses expected to spend fewer than 10 days renewing their licencefor the following year. (Question 16.)


Awareness among businesses <strong>of</strong> <strong>municip<strong>al</strong>ity</strong> functions• 70% and 84% <strong>of</strong> businesses, respectively, reported that they didn’t know about the role <strong>of</strong>the LED and RED <strong>of</strong>fices. (Question 22.)• In gener<strong>al</strong>, businesses reported that they were not aware <strong>of</strong> pr<strong>of</strong>ession<strong>al</strong> associations or <strong>of</strong>the role that these associations play. (Question 22.)• 49% <strong>of</strong> businesses were not aware <strong>of</strong> the private pr<strong>of</strong>ession<strong>al</strong> services available in the<strong>municip<strong>al</strong>ity</strong>. (Question 22.)• Although 84% <strong>of</strong> businesses reported that they did not know about the RED <strong>of</strong>fice, it wasnevertheless mentioned 17 times as the department that de<strong>al</strong>s with loc<strong>al</strong> economicdevelopment. (Question 26.)SWOT (as mentioned in the questionnaire)Strengths• Favourable geographic position: near to the sea and the lake;• Abundance <strong>of</strong> rich agricultur<strong>al</strong> soil;• Tourism resources;• Natur<strong>al</strong> resources;• Handicraft tradition;• Low labour costs.Weaknesses• Poor infrastructure;• Shortage <strong>of</strong> electricity;• Low level <strong>of</strong> safety and security;• High finance costs.Opportunities• Many business expectations can be resolved in part politic<strong>al</strong>ly;• With so many things that need to be done even a sm<strong>al</strong>l improvement would have a largeimpact on the way businesses think.167


MUNICIPALITY <strong>of</strong> SHKODRAThreats• The inform<strong>al</strong> economy is one <strong>of</strong> the most important factors reducing the number <strong>of</strong> registeredbusinesses;• A considerable number <strong>of</strong> businesses are not thinking <strong>of</strong> expanding their activity;• Corruption is mentioned many times as a huge constraint;• Low level <strong>of</strong> willingness <strong>of</strong> businesses to collaborate, a result <strong>of</strong> the poor image <strong>of</strong> loc<strong>al</strong>government.168


Annex 3: Methodology used in project prioritisationThe Shkodra Loc<strong>al</strong> Economic Development projects were prioritised according to two separate, butequ<strong>al</strong>ly important, criteria: perceived necessity for the community, and feasibility <strong>of</strong> implementation.Each project was assigned a score based upon these two criteria.The Necessity Score was developed through a ranking survey filled out by the working group <strong>of</strong>stakeholders and community members. The projects were divided within the survey according togo<strong>al</strong> heading and then whether they were hard or s<strong>of</strong>t. Responders to the survey were asked to rankeach project against other projects within each grouping, as either most necessary, necessary or leastnecessary. Projects rated most necessary were given 3 points, necessary 2 points and least necessary1 point. It should be noted that some projects were not rated by responders and were given a score <strong>of</strong>0. The tot<strong>al</strong> sum <strong>of</strong> scores created the fin<strong>al</strong> Necessity Score for each project.The Feasibility Score was developed by a technic<strong>al</strong> group within the <strong>municip<strong>al</strong>ity</strong>. The group awardeda score per project according to seven criteria, which were as follows:1. Whether or not a project had <strong>al</strong>ready secured funding;2. The number <strong>of</strong> identified potenti<strong>al</strong> funding sources;3. Whether the <strong>municip<strong>al</strong>ity</strong> had the expertise to implement the project;4. Whether the <strong>municip<strong>al</strong>ity</strong> had successfully implemented a similar project previously;5. The number <strong>of</strong> risks involved with implementation;6. The groups targeted by the project;7. The number <strong>of</strong> Go<strong>al</strong>s or Objectives addressed by the project.In contrast to the Necessity Score, where a higher number represented a higher level <strong>of</strong> desirability,a lower Feasibility score meant the project had a higher level <strong>of</strong> feasibility. Each criterion was ratedwith a different score (see instructions below), and the tot<strong>al</strong> c<strong>al</strong>culated, plus 1, to create an over<strong>al</strong>lFeasibility Score for each project.The fin<strong>al</strong> Prioritised list <strong>of</strong> projects was developed by dividing the Necessity Score by the FeasibilityScore and ranking the projects. The list was further refined by splitting the projects into three separatecategories: active projects, inactive projects and projects without summaries.169


MUNICIPALITY <strong>of</strong> SHKODRA170The prioritisation methodology utilised by the Municip<strong>al</strong>ity <strong>of</strong> Shkodra was developed by the loc<strong>al</strong>Community Development Peace Corps Volunteer, Nathan B<strong>org</strong>ford-Parnell, in conjunction with theShkodra Development Office and under the care <strong>of</strong> the SOROS Open Society Foundation and WorldBank. Speci<strong>al</strong> thanks go to Peace Corps Volunteers, Jon Owen and Peter Gambil for their contributionsto the process.Project Prioritisation Methodology InstructionsNecessity QuotientStep 1: Group project according to go<strong>al</strong>;Step 2: Categorise project within each go<strong>al</strong> group as (H)ard or (S)<strong>of</strong>t;Step 3: List <strong>al</strong>l projects on the Stakeholder Form according to group number and H or S category(list Go<strong>al</strong> 1 projects first, followed by Go<strong>al</strong> 2, and so on);Step 4: Provide each stakeholder with a separate Stakeholder Form;Step 5: Ask stakeholders to mark projects within the groups as being most necessary, necessary orleast necessary. Stakeholders can only rank three projects within each grouping as mostdesirable/necessary (for the H and S projects). If there are very few projects in one groupingthe maximum number <strong>al</strong>lowed for ‘most desirable/necessary’ can be decreased to 2 or 1.Step 6: Add up points for each project from each stakeholder form to obtain the Necessity Quotientand enter this into the Project Prioritisation Sheet.Feasibility QuotientStep 1: List projects by group in the Feasibility Form;Step 2: Discuss and rate each project according to the criteria set out in the form (note that this is theopposite <strong>of</strong> the ranking format used in the Stakeholder Form);Criterion 1: Funding secured? (yes, 0; no, 0.1);Criterion 2: Number <strong>of</strong> potenti<strong>al</strong> funding sources identified (≥2, 0; one, 0.1; zero, 0.2).Criterion 3: Does <strong>municip<strong>al</strong>ity</strong> have expertise to implement project and are experts readilyavailable? (yes, 0; maybe, 0.1; no, 0.2);Criterion 4: Has <strong>municip<strong>al</strong>ity</strong> successfully implemented a project like this previously?(yes, 0; no, 0.2);


Criterion 5: Number <strong>of</strong> risks (0, 0; 1 or 2, 0.1; >2, 0.2);Criterion 6:Population groups targeted by project (whole population, 0; under-served,specific<strong>al</strong>ly targeted population, 0.1; single non-priority population, 0.2);Criterion 7: Number <strong>of</strong> Go<strong>al</strong>s/Objectives addressed by project (≥3, 0;


MUNICIPALITY <strong>of</strong> SHKODRAAnnex 4: Group projectsa. Project No. 63 (G4:O2:PG1:p1: Reconstruction <strong>of</strong> city streets)Sub-projectEstimated cost(000 leke)Tregu i Ri Street 70,000Street at city entrance 235,486Street from Ali Kelmendi to Lek Dukagjini 114,427City ring road: Tophane to Rus 309,071Skenderbeg Street 204,476Street from Thive Bridge to Railway Overpass 47,461Alqi Kondi crossroads 11,353Guerrile Street 22,000Justin Godard Street 9,286Bajram Curri Street 3,753H<strong>al</strong>it Bajraktari Street 33,300Street from Artistic enterprise to former Silk Plant 46,000Daut Borici Street 2,300Street from Thive Bridge to Train Station 24,400Tahsim Berdica Street 17,750Tot<strong>al</strong> 1,151,063b. Project No. 64 (G4:O2:PG1:p2: Reconstruction <strong>of</strong> city pavements)ProjectZogu i Pare StreetVasil Shanto StreetClirimi Street13 Dhjetori StreetMarin Barleti StreetBujar Bishanaku StreetAlqi Kondi StreetDaut Borici StreetOsa Kuka StreetDaniel Matlia StreetHe<strong>al</strong>th Centre StreetMuhamet Gjollesha Street172


c. Project No. 65 (G4:O2:PG1:p3: Reconstruction <strong>of</strong> city street lighting)ProjectEstimated cost(000 leke)Zogu i Pare Street 17,000Clirimi Street 14,52013 Dhjetori Street 5,820Marin Barleti Street 6,500Daniel Matlia Street 3,000He<strong>al</strong>th Centre Street 2,000Osa Kuka Street 2,000Road in front <strong>of</strong> University campus 1,200Tot<strong>al</strong> 52,040d. Project No. 66 (G4:O2:PG2:p1: Rehabilitation <strong>of</strong> city drains)ProjectLake Exit I, Ring Road to Myfit Kopliku StreetLake Exit II, Ring Road to Selim Golemi StreetRiver Kir Exit, Fusha e Druve, OUT 2River Kir Exit, Tepe, OUT 3River Buna Exit, Former Farm, OUT 3Lake Exit, Zooteknikes (farmers’ house), OUT 8173