- Page 5 and 6: ELECTRICAL SAFETY COMMITTEEMEMBERSH
- Page 7: the requirements of</strong
- Page 13 and 14: ContentsPAGE8.5 High Voltage Metal-
- Page 15 and 16: ContentsPAGEClearance to Place Elec
- Page 17 and 18: Definitions3 ‘Appliance’ means
- Page 19 and 20: Definitionsallow work</stro
- Page 21 and 22: concerned.Definitions22 ‘High vol
- Page 23 and 24: DefinitionsHelicopters used <strong
- Page 25 and 26: Definitions43 ‘Practicable’ mea
- Page 27 and 28: Definitions54 ‘Tester in Charge
- Page 29 and 30: ScopeThis Code sets a minimum stand
- Page 31 and 32: General Safety Requirements3.2 FIRS
- Page 33 and 34: times.General Safety Requirements3.
- Page 35 and 36: General Safety Requirements3.10 TAP
- Page 37 and 38: General Safety Requirements3.13 WOR
- Page 39 and 40: General Safety RequirementsThe pers
- Page 41 and 42: Training and Authorisation4 TRAININ
- Page 43 and 44: Training and Authorisation• Knowl
- Page 45 and 46: Work in the Vicinity of</st
- Page 47 and 48: Work in the Vicinity of</st
- Page 49 and 50: Work in the Vicinity of</st
- Page 51 and 52: Approach To Electrical Apparatus6 A
- Page 53 and 54: Approach To Electrical Apparatus‘
- Page 55 and 56: Approach To Electrical ApparatusTab
- Page 57 and 58: Approach To Electrical ApparatusThe
- Page 59 and 60:
Approach to Electrical ApparatusTab
- Page 61 and 62:
Approach To Electrical Apparatus•
- Page 63 and 64:
Approach To Electrical ApparatusTab
- Page 65 and 66:
Approach To Electrical Apparatusmm
- Page 67 and 68:
Approach To Electrical Apparatus6.6
- Page 69 and 70:
Approach To Electrical Apparatusmet
- Page 71 and 72:
Operation of High
- Page 73 and 74:
Earthing of High V
- Page 75 and 76:
Earthing of High V
- Page 77 and 78:
Earthing of High V
- Page 79 and 80:
Access for Work on
- Page 81 and 82:
Access for Work on
- Page 83 and 84:
Access for Work on
- Page 85 and 86:
Access for Work on
- Page 87 and 88:
Access for Work on
- Page 89 and 90:
Access for Work on
- Page 91 and 92:
Access for Work on
- Page 93 and 94:
Access for Work on
- Page 95 and 96:
Access for Work on
- Page 97 and 98:
Access for Work on
- Page 99 and 100:
Access for Work on
- Page 101 and 102:
Access for Work on
- Page 103 and 104:
Access for Work on
- Page 105 and 106:
Access for Work on
- Page 107 and 108:
9.7.3.2 Use of the
- Page 109 and 110:
Access for Work on
- Page 111 and 112:
Access for Work on
- Page 113 and 114:
Placing High Voltage Electrical App
- Page 115 and 116:
Low Voltage Network</strong
- Page 117 and 118:
Low Voltage Network</strong
- Page 119 and 120:
Work by Persons Not Under the Contr
- Page 121 and 122:
AppendixAPPENDIX A - INFORMATIONTO
- Page 123 and 124:
Appendix• Unique identification n
- Page 125 and 126:
Appendix• Authority to place into
- Page 127 and 128:
AppendixStatement of</stron
- Page 129 and 130:
IndexClausePageApparatus . . . . .
- Page 131 and 132:
IndexClausePageuse of</stro
- Page 133 and 134:
IndexClausePageat the site
- Page 135 and 136:
IndexClausePagesigns and barriers .
- Page 137 and 138:
IndexClausePagesuitable clothing .
- Page 139 and 140:
IndexClausePageLIMITSaccess authori
- Page 141 and 142:
IndexClausePageMOBILE PLANTearthing
- Page 143 and 144:
IndexClausePageauthorised to operat
- Page 145 and 146:
IndexClausePageIssue to. . . . . .
- Page 147 and 148:
IndexClausePageSLEEVESinsulating .
- Page 149 and 150:
IndexClausePageUUNDERGROUND CABLESm