04.12.2012 Views

Final Program - American Society of Civil Engineers

Final Program - American Society of Civil Engineers

Final Program - American Society of Civil Engineers

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SUSTAiBALE pRACTiCES<br />

CONSERVING RESOURCES<br />

Replaced incandescent lamps with low wattage<br />

fluorescent lamps in public areas in doing this in guest<br />

rooms as well.<br />

■■ Ultra low-flow shower heads and low-flow fixtures<br />

■■ Completed extensive energy conservation retr<strong>of</strong>it <strong>of</strong><br />

HVAC<br />

■■ New main dishwasher reduced water consumption<br />

by 55%<br />

■■ Paperless check-in process and post consumer<br />

paper products when available<br />

■■ During the fall and winter months, use a free<br />

cooling heat exchanger to cool the entire City<br />

Block.<br />

PREVENTING POLLUTION<br />

Utilize grease waste traps in all food operations to<br />

prevent waste grease from entering sewer system.<br />

■■ Wastewater containment to prevent run-<strong>of</strong>f from<br />

entering drains that flow to S.F. Bay<br />

■■ Toxic waste diversion program with toxic waste<br />

disposal companies to dispose <strong>of</strong> all known toxic<br />

waste<br />

■■ Utilize hand pump dispensers for cleaning solutions<br />

rather than aerosol containers<br />

MINIMIZING WASTE<br />

Separate newspaper, white paper, cardboard,<br />

plastics, aluminum, grease, light bulbs, and glass for<br />

recycling.<br />

■■ Establishing a solid waste diversion program for<br />

compostable food waste for hotel and neighboring<br />

complex <strong>of</strong> 8 <strong>of</strong>fice buildings and 13 restaurants<br />

■■ Implemented a linen re-use program eliminating<br />

linen washing each day<br />

■■ Employ a “daily newspaper optional” program<br />

■■ Employ a “two-sided” copy program for printing on<br />

the reverse <strong>of</strong> all documents<br />

THIS DESCRIPTION IS NOT AN EXCLUSIVE<br />

OR EXHAUSTIVE LIST OF ALL THE FUNCTIONS<br />

THAT WE EMPLOY.<br />

GEO-CONGRESS SUSTAINABLE<br />

PRACTICES<br />

■■ Conference registration bags 85% recycled content<br />

■■ Badge holders recyclable and biodegradable<br />

■■ Lanyards made out <strong>of</strong> eco-friendly Bamboo Fibers<br />

Please help ASCE stay “green” and reduce<br />

extra costs by returning your badge holder at<br />

the end <strong>of</strong> the Conference in the receptacles<br />

provided at the Registration Desk.<br />

| 42 | www.geocongress2012.org<br />

COmmiTTEE mEETiNGS<br />

COMMITTEE TIME ROOM<br />

SUNDAY, MARCH 25, 2012<br />

Technical Coordination Council (TCC) 7:30 a.m. – 12:00 p.m. Oakland (2nd floor)<br />

Geo-Wall Captains Meeting 12:30 – 1:30 p.m. Exhibit Hall<br />

Technical Committee Chair Workshop 1:00 – 4:00 p.m. 208<br />

Journal <strong>of</strong> Geotechnical and<br />

Geoenvironmental Engineering Editorial<br />

Board<br />

8:00 – 9:30 p.m. 208<br />

Student and Younger Members Participation<br />

Committee<br />

8:00 – 11:59 p.m. 201<br />

Engineering Geology and Site<br />

Characterization<br />

8:30 – 11:59 p.m. 203<br />

Joint Committee on Sustainable Practice 8:30 – 11:59 p.m. 204<br />

Risk Assessment and Management 8:30 – 11:59 p.m. Oakland (2nd floor)<br />

Technical Publications Committee (TPC) 9:30 – 11:00 p.m. 205<br />

Graduate Student Leadership Council<br />

MONDAY, MARCH 26, 2012<br />

10:00 – 11:59 p.m. 206<br />

2013 Geo-Congress Organizing Committee 11:30 a.m. – 1:30 p.m. 201<br />

Continuing Education Committee 11:30 a.m. – 1:30 p.m. 202<br />

Geo-Strata Editorial Board 2:30 – 4:30 p.m. 201<br />

Local Involvement Committee 3:00 – 6:00 p.m. 203<br />

G-I Chapter Leader Forum 6:30 – 9:30 p.m. Ballroom F<br />

Conference Coordination Committee (CCC) 7:00 p.m. – 10:00 p.m. 204<br />

Geosynthetic 7:30 – 11:30 p.m. 203<br />

Computational Geotechnics 8:00 – 11:59 p.m. 207<br />

Deep Foundations 8:00 – 11:59 p.m. Ballroom GH<br />

Earth Retaining Structures 8:00 – 11:59 p.m. Oakland (2nd floor)<br />

Embankments, Dams and Slopes 8:00 – 11:59 p.m. 205<br />

Geotechnics <strong>of</strong> Soil Erosion 8:00 – 11:59 p.m. 202<br />

Soil Properties and Modeling 8:00 – 11:59 p.m. 206<br />

Underground Construction 8:00 – 11:59 p.m. 201<br />

DFI-Committee on Deep Foundations for<br />

Landslides/Slopes<br />

TUESDAY, MARCH 27, 2012<br />

8:30 – 11:59 p.m. 208<br />

Earthquake Engineering and Soil Dynamics 8:00 – 11:59 p.m. 207<br />

Geophysical Engineering 8:00 – 11:59 p.m. 201<br />

Pavements 8:00 – 11:59 p.m. 203<br />

Soil Improvement 8:00 – 11:59 p.m. 206<br />

Unsaturated Soils<br />

WEDNESDAY, MARCH 28, 2012<br />

8:00 – 11:59 p.m. Oakland (2nd floor)<br />

2014 Geo-Congress Organizing Committee 12:00 – 1:00 p.m. Oakland (2nd floor)<br />

International Activities Council (IAC) 7:00 – 9:30 p.m. 203<br />

Geoenvironmental Engineering 8:00 – 11:59 p.m. Grand Ballroom F

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!