13.07.2015 Views

MYFBS, MAY(R - the Digital Library of Georgia

MYFBS, MAY(R - the Digital Library of Georgia

MYFBS, MAY(R - the Digital Library of Georgia

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

144 <strong>MAY</strong>OR'S ANNUAL REPORT.under resolution <strong>of</strong> Council November 13, 1899, <strong>the</strong>Special Committee <strong>of</strong> House Drainage with <strong>the</strong> Director<strong>of</strong> Public Works were authorized to complete<strong>the</strong> House Drainage System. Very little work wasaccomplished in 1899 except to purchase materialand organize for <strong>the</strong> work, which was done in 1900.The tabulated statement attached will show a completerecord <strong>of</strong> all work done in House Drainage upto <strong>the</strong> first da}' <strong>of</strong> January <strong>of</strong> this year, 1901. Of <strong>the</strong>total amount spent by <strong>the</strong> city on House Drainagework for <strong>the</strong> past twelve months $18,110.95 wasspent in 1899 and $95,024.12 in 1900. The workdone by Rourke & Mitchell and Miles & Bradt, <strong>the</strong>previous contractors on this work, was in such disjointedcondition that none <strong>of</strong> it could be put in use.No outlet to <strong>the</strong> river had been secured for <strong>the</strong> mainsewer, <strong>the</strong> 8-inch lateral lines were not connectedwith <strong>the</strong> main sewers, and flush tanks had no waterconnections. The city has in <strong>the</strong> past year (that isto say 1900) not only built 13.5 miles <strong>of</strong> severs, buthas made every line <strong>of</strong> pipe that has been laid to dateready for use.This year's work has practically completed <strong>the</strong>House Drainage work in <strong>the</strong> city proper. The workon Gaston, Tattnall, Huntingdon and Forty-secondstreets was very derp and in an unstable soil saturatedwith water, making <strong>the</strong> work difficult and <strong>the</strong> expensegreater than was expected. We had a number<strong>of</strong> sewer breaks on <strong>the</strong>se lines after <strong>the</strong> work wascompleted which necessitated an additional expense<strong>of</strong> over $10,000.00 before we had <strong>the</strong>se particular linesready for use. The House Drainage represents to

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!