13.07.2015 Views

Thumane Toll Motorway

Thumane Toll Motorway

Thumane Toll Motorway

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Rrogozhine - <strong>Thumane</strong> <strong>Toll</strong> <strong>Motorway</strong>Durres – Tirane - Elbasan <strong>Motorway</strong>Durres-Tirane (Future Plan)• 36 km (30 km new construction)• Becoming <strong>Toll</strong> <strong>Motorway</strong> 6 (3X3) lanes <strong>Motorway</strong>• Estimated construction cost: 147 Mio EURTiraneDurresElbasanTirane-Elbasan (under construction)• 39 km (32 km new construction)• 4 (2x2) lanes <strong>Motorway</strong>• Estimated construction cost 320 Mio EUR• Double tunnel 2.4 km long, the main construction6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!