Milestones; <strong>Transmission</strong> Provider shall pay Interconnection Customerliquidated damages in accordance with Article 5.3, Liquidated Damages,provided, however, the dates designated by Interconnection Customer shall beextended day for day for each day that the applicable RTO or ISO refuses togrant clearances to install equipment.5.1.2.2 5.1.3 Option to Build. If the dates designated by InterconnectionCustomer are not acceptable to <strong>Transmission</strong> Provider,<strong>Transmission</strong> Provider shall so notify Interconnection Customerwithin thirty (30) Calendar Days, and unless the Parties agreeotherwise, Interconnection Customer shall have the option to assumeresponsibility for the design, procurement and construction of<strong>Transmission</strong> Provider's Interconnection Facilities and Stand AloneNetwork Upgrades onby the dates specified in Article 5.1.2.5.1.<strong>Transmission</strong> Provider and Interconnection Customer must agree asto what constitutes Stand Alone Network Upgrades and identifysuch Stand Alone Network Upgrades in <strong>Appendix</strong> A. Except forStand Alone Network Upgrades, Interconnection Customer shallhave no right to construct Network Upgrades under this option.5.1.2.3 5.1.4 Negotiated Option. If If Interconnection Customer elects notto exercise its option under Article 5.1.3, Option to Build,5.1.2.2,Interconnection Customer shall so notify <strong>Transmission</strong> Providerwithin thirty (30) Calendar Days, and the Parties shall in good faithattempt to negotiate terms and conditions (includingrevisionrevisions of the specified dates and liquidated damages, theprovision of incentives or the procurement and construction of aportion of <strong>Transmission</strong> Provider's Interconnection Facilities andStand Alone Network Upgrades by Interconnection Customer)pursuant to which <strong>Transmission</strong> Provider is responsible for thedesign, procurement and construction of <strong>Transmission</strong> Provider'sInterconnection Facilities and Network Upgrades. If the Parties areunable to reach agreement on such terms and conditions,<strong>Transmission</strong> Provider shall assume responsibility for the design,procurement and construction of <strong>Transmission</strong> Provider'sInterconnection Facilities and Network Upgrades pursuant to 5.1.1,Standard Option.Article 5.1.2.1.5.2 General Conditions Applicable to Option to Build. If Interconnection Customerassumes responsibility for the design, procurement and construction of <strong>Transmission</strong>Provider's Interconnection Facilities and Stand Alone Network Upgrades,(1) Interconnection Customer shall engineer, procure equipment, andconstruct <strong>Transmission</strong> Provider's Interconnection Facilities and StandAlone Network Upgrades (or portions thereof) using Good Utility Practiceand using standards and specifications provided in advance by<strong>Transmission</strong> Provider;- 17 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!