13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Customer's Large Generating Facility be designated as a NetworkResource by a Network Service Customer under the Tariff or thatInterconnection Customer identify a specific buyer (or sink). To theextent a Network Customer does designate the Large GeneratingFacility as a Network Resource, it must do so pursuant to<strong>Transmission</strong> Provider's Tariff.Once an Interconnection Customer satisfies the requirements forobtaining Network Resource Interconnection Service, any futuretransmission service request for delivery from the Large GeneratingFacility within <strong>Transmission</strong> Provider's <strong>Transmission</strong> System of anyamount of capacity and/or energy, up to the amount initially studied,will not require that any additional studies be performed or that anyfurther upgrades associated with such Large Generating Facility beundertaken, regardless of whether or not such Large GeneratingFacility is ever designated by a Network Customer as a NetworkResource and regardless of changes in ownership of the LargeGenerating Facility. However, the reduction or elimination ofcongestion or redispatch costs may require additional studies and theconstruction of additional upgrades.To the extent Interconnection Customer enters into an arrangementfor long term transmission service for deliveries from the LargeGenerating Facility outside <strong>Transmission</strong> Provider's <strong>Transmission</strong>System, such request may require additional studies and upgrades inorder for <strong>Transmission</strong> Provider to grant such request.4.2 Provision of Service. <strong>Transmission</strong> Provider shall provide Interconnection Service forthe Large Generating Facility at the Point of Interconnection.4.3 Performance Standards. Each Party shall perform all of its obligations under thisLGIASGIA in accordance with Applicable Laws and Regulations, Applicable ReliabilityStandards, and Good Utility Practice, and to the extent a Party is required or prevented orlimited in taking any action by such regulations and standards, such Party shall not bedeemed to be in Breach of this LGIASGIA for its compliance therewith. If such Party isathe <strong>Transmission</strong> Provider or <strong>Transmission</strong> Owner, then that Party shall amend theLGIASGIA and submit the amendment to FERCthe Commission for approval.4.4 No <strong>Transmission</strong> Delivery Service. The execution of this LGIASGIA does notconstitute a request for, nor the provision of, any transmission delivery service under<strong>Transmission</strong> Provider's Tariff, and does not convey any right to deliver electricity to anyspecific customer or Point of Delivery.4.5 Interconnection Customer Provided Services. The services provided byInterconnection Customer under this LGIASGIA are set forth in Article 9.6 andArticle 13.5.1. Interconnection Customer shall be paid for such services in accordancewith Article 11.6.- 15 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!