13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

of Ownership to the Point of Interconnection as identified in <strong>Appendix</strong> A to thethis StandardLarge Generator Interconnection Agreement, including any modifications, additions or upgradesto such facilities and equipment. <strong>Transmission</strong> Provider’s Interconnection Facilities are sole usefacilities and shall not include Distribution Upgrades, Stand Alone Network Upgrades orNetwork Upgrades.<strong>Transmission</strong> System shall mean the facilities owned, controlled or operated by the<strong>Transmission</strong> Provider or <strong>Transmission</strong> Owner that are used to provide transmission serviceunder the Tariff.Trial Operation shall mean the period during which Interconnection Customer is engaged in onsitetest operations and commissioning of the Generating Facility prior to Commercial Operation.WECC shall mean Western Electricity Coordinating Council, or any successor organization.Article 2Article 2. . Effective Date, Term and Termination2.1 Effective Date. This LGIASubject to Article 18.4, this SGIA shall become effectiveupon execution by the Parties subject to acceptance by FERCthe Commission (ifapplicable), or if filed unexecuted, upon the date specified by FERCthe Commission.<strong>Transmission</strong> Provider shall promptly file this LGIASGIA with FERCthe Commissionupon execution in accordance with Article 3.1, if required.2.2 Term of Agreement. Subject to the provisions of Article 2.3, this LGIASGIA shallremain in effect for a period of ten (10) years from the Effective Date or such otherlonger period as Interconnection Customer may request (Term to be specified inindividual agreements) and shall be automatically renewed for each successive one-yearperiod thereafter.2.3 Termination Procedures.2.3.1 Written Notice. This LGIASGIA may be terminated by InterconnectionCustomer after giving <strong>Transmission</strong> Provider ninety (90) Calendar Daysadvance written notice, or by <strong>Transmission</strong> Provider notifying FERCtheCommission after the Generating Facility permanently ceases CommercialOperation or fails to achieve Commercial Operation within three (3) years ofthe target date for Commercial Operation set out in <strong>Appendix</strong> B.2.3.2 Default. Either Party may terminate this LGIASGIA in accordance withArticle 17. .2.3.3 RMS Provisions. If Interconnection Customer elects to terminate itsobligation to comply with the RMS Provisions as provided for in Section 2.9of the RMS Provisions, <strong>Transmission</strong> Provider may at any time thereafterterminate this SGIA on five (5) Calendar Days advance written notice toInterconnection Customer.- 10 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!