13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

usiness relationship between Interconnection Customer and the entity having the right to sell,lease or grant Interconnection Customer the right to possess or occupy a site for such purpose.Small Generating Facility shall mean a Generating Facility that has a Generating FacilityCapacity of no more than 20 MW.Stand Alone Network Upgrades shall mean Network Upgrades that an InterconnectionCustomer may construct without affecting day-to-day operations of the <strong>Transmission</strong> Systemduring their construction. Both the <strong>Transmission</strong> Provider and the Interconnection Customermust agree as to what constitutes Stand Alone Network Upgrades and identify them in<strong>Appendix</strong> A to thethis Standard Large Generator Interconnection Agreement.Standard Large Generator Interconnection Agreement (LGIASGIA) shall mean the form ofinterconnection agreement applicable to an Interconnection Request pertaining to a LargeGenerating Facility, that is included in the <strong>Transmission</strong> Provider’s Tariff.Standard Large Generator Interconnection Procedures (LGIPSGIP) shall mean theinterconnection procedures applicable to an Interconnection Request pertaining to a LargeGenerating Facility that are included in the <strong>Transmission</strong> Provider’s Tariff.System Protection Facilities shall mean the equipment, including necessary protection signalcommunications equipment, required to protect (1) the <strong>Transmission</strong> Provider’s <strong>Transmission</strong>System from faults or other electrical disturbances occurring at the Generating Facility and (2)the Generating Facility from faults or other electrical system disturbances occurring on the<strong>Transmission</strong> Provider’s <strong>Transmission</strong> System or on other delivery systems or other generatingsystems to which the <strong>Transmission</strong> Provider’s <strong>Transmission</strong> System is directly connected.Tariff shall mean the <strong>Transmission</strong> Provider’s Tariff through which open access transmissionservice and Interconnection Service are offered, as filed with FERCthe Commission, and asamended or supplemented from time to time, or any successor tariff.Technical Interconnection Requirements means the “69 kV to 500 kV InterconnectionRequirements for Power Generators” (<strong>BC</strong> <strong>Hydro</strong>, January 2002), as adopted by <strong>BC</strong>TC, andamended from time to time.<strong>Transmission</strong> Owner shall mean an entity that owns, leases or otherwise possesses an interest inthe portion of the <strong>Transmission</strong> System at the Point of Interconnection and may be a Party to theStandard Large Generator Interconnection Agreement to the extent necessary.the BritishColumbia <strong>Hydro</strong> and Power Authority.<strong>Transmission</strong> Provider shall mean the public utility (or its designated agent) that owns,controls, or operates transmission or distribution facilities used for the transmission of electricityin interstate commerce and provides transmission service under the Tariff. The term<strong>Transmission</strong> Provider should be read to include the <strong>Transmission</strong> Owner when the <strong>Transmission</strong>Owner is separate from the <strong>Transmission</strong> Provider.<strong>Transmission</strong> Provider’s Interconnection Facilities or TPIF shall mean all facilities andequipment owned, controlled or operated by the <strong>Transmission</strong> Provider from the Point of Change- 9 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!