13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

accommodate the interconnection of the Large Generating Facility to the <strong>Transmission</strong>Provider’s <strong>Transmission</strong> System.Notice of Dispute shall mean a written notice of a dispute or claim that arises out of or inconnection with the Standard Large Generator Interconnection Agreement or its performance.Optional Interconnection Study shall mean a sensitivity analysis based on assumptionsspecified by the Interconnection Customer in the Optional Interconnection Study Agreement.Optional Interconnection Study Agreement shall mean the form of agreement contained in<strong>Appendix</strong> 5 of the Standard Large Generator Interconnection Procedures for conducting theOptional Interconnection Study.Operating Orders means those operating instructions, protocols and procedures developed bythe Joint Operating Committee pursuant to Section 29.1.6.Party or Parties shall mean shall mean <strong>Transmission</strong> Provider, <strong>Transmission</strong> Owner, orInterconnection Customer or any combination of the above, and Parties shall mean both of them.Point of Change of Ownership shall mean the point, as set forth in <strong>Appendix</strong> A to thethisStandard Large Generator Interconnection Agreement, where the Interconnection Customer’sInterconnection Facilities connect to the <strong>Transmission</strong> Provider’s Interconnection Facilities.Point of Interconnection shall mean the point, as set forth in <strong>Appendix</strong> A to thethis StandardLarge Generator Interconnection Agreement, where the Interconnection Facilities connect to the<strong>Transmission</strong> Provider’s <strong>Transmission</strong> System.Queue Position shall mean the order of a validInterconnection Request, relative to all other pending valid Interconnection Requests, that isestablished based upon the date and time of receipt of the valid Interconnection Request by the<strong>Transmission</strong> Provider.Reasonable Efforts shall mean, with respect to an action required to be attempted or taken by aParty under thethis Standard Large Generator Interconnection Agreement, efforts that are timelyand consistent with Good Utility Practice and are otherwise substantially equivalent to those aParty would use to protect its own interests.Reliability Management System Provisions or RMS Provisions shall mean the provisionscontained in <strong>Appendix</strong> F to the SGIA as prescribed by the <strong>Transmission</strong> Provider’s ReliabilityManagement System Agreement with WECC.Scoping Meeting shall mean the meeting between representatives of the InterconnectionCustomer and <strong>Transmission</strong> Provider conducted for the purpose of discussing alternativeinterconnection options, to exchange information including any transmission data and earlierstudy evaluations that would be reasonably expected to impact such interconnection options, toanalyze such information, and to determine the potential feasible Points of Interconnection.Site Control shall mean documentation reasonably demonstrating: (1) ownership of, a leaseholdinterest in, or a right to develop a site for the purpose of constructing the Generating Facility; (2)an option to purchase or acquire a leasehold site for such purpose; or (3) an exclusivity or other- 8 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!