13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Procedures for conducting the Interconnection Facilities StudyStudy dated in respect of theGenerating Facility.Interconnection Feasibility Study shall mean a preliminary evaluation of the system impactand cost of interconnecting the Generating Facility to the <strong>Transmission</strong> Provider’s <strong>Transmission</strong>System, the scope of which is described in Section 6 of the Standard Large GeneratorInterconnection Procedures.Interconnection Feasibility Study Agreement shall mean the formof agreement contained in <strong>Appendix</strong> 2 of the Standard Large Generator InterconnectionProcedures for conducting the Interconnection Feasibility Study.the Interconnection FeasibilityStudy dated in respect of the Generating Facility.Interconnection Request shall mean an Interconnection Customer’s request, in the form of<strong>Appendix</strong> 1 to the Standard Large Generator Interconnection Procedures, in accordance with theTariff, to interconnect a new Generating Facility, or to increase the capacity of, or make aMaterial Modification to the operating characteristics of, an existing Generating Facility that isinterconnected with the <strong>Transmission</strong> Provider’s <strong>Transmission</strong> Systemin respect of theGenerating Facility.Interconnection Service shall mean the service provided by the <strong>Transmission</strong> Providerassociated with interconnecting the Interconnection Customer’s Generating Facility to the<strong>Transmission</strong> Provider’s <strong>Transmission</strong> System and enabling it to receive electric energy andcapacity from the Generating Facility at the Point of Interconnection, pursuant to the terms ofthethis Standard Large Generator Interconnection Agreement and, if applicable, the<strong>Transmission</strong> Provider’s Tariff.Interconnection Study shall mean any of the following studies: the Interconnection FeasibilityStudy, the Interconnection System Impact Study, and the Interconnection Facilities Studydescribed in the Standard Large Generator Interconnection Procedures.Interconnection System Impact Study shall mean an engineering study that evaluates theimpact of the proposed interconnection on the safety and reliability of <strong>Transmission</strong> Provider’s<strong>Transmission</strong> System and, if applicable, an Affected System. The study shall identify and detailthe system impacts that would result if the Generating Facility were interconnected withoutproject modifications or system modifications, focusing on the Adverse System Impactsidentified in the Interconnection Feasibility Study, or to study potential impacts, including butnot limited to those identified in the Scoping Meeting as described in the Standard LargeGenerator Interconnection Procedures.Interconnection System Impact Study Agreement shall mean the form of agreement containedin <strong>Appendix</strong> 3 of the Standard Large Generator Interconnection Procedures for conducting theInterconnection System Impact Study.IRS shall mean the Internal Revenue Service.Interest means interest calculated in accordance with Attachment K of the Tariff.- 6 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!