13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Attachment B To <strong>Appendix</strong> 3Combined Study AgreementINTERCONNECTION CUSTOMER SCHEDULE ELECTION FOR CONDUCTINGTHE INTERCONNECTION FACILITIES STUDY<strong>Transmission</strong> Provider shall use Reasonable Efforts to complete the study and issue a draftInterconnection Facilities Study report to Interconnection Customer within the following numberof days after of receipt of notice from the Interconnection Customer to proceed with an executedcopy of this Interconnection Facilities Study Agreement:−−ninety (90) Calendar Days with no more than a +/- 20 percent cost estimatecontained in the report, orone hundred eighty (180) Calendar Days with no more than a +/- 10 percent costestimate contained in the report.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 60 60-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!