13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ASSUMPTIONS USED IN CONDUCTING THEINTERCONNECTION SYSTEM IMPACT STUDYTABLE OF CONTENTSPageAttachment A To <strong>Appendix</strong> 3Interconnection System ImpactCombined Study AgreementThe Interconnection System Impact Study will be based upon the results of the InterconnectionFeasibility Study, subject to any modifications in accordance with Section 4.4 of the LGIPSGIP,and the following assumptions:Designation of Point of Interconnection and configuration to be studied.Designation of alternative Point(s) of Interconnection and configuration.[Above assumptions to be completed by Interconnection Customer and other assumptions to beprovided by Interconnection Customer and <strong>Transmission</strong> Provider]APPENDIX 4 to LGIPINTERCONNECTION FACILITIES STUDY AGREEMENTTHIS AGREEMENT is made and entered into this ____ day of ________, 20___ by andbetween _____________, a ___________________ organized and existing under the laws of theState of _________________, ("Interconnection Customer,") and _______________, a________________ existing under the laws of the State of __________________,("<strong>Transmission</strong> Provider "). Interconnection Customer and <strong>Transmission</strong> Provider each may bereferred to as a "Party," or collectively as the "Parties."RECITALSWHEREAS, Interconnection Customer is proposing to develop a Large Generating Facility orgenerating capacity addition to an existing Generating Facility consistent with theInterconnection Request submitted by Interconnection Customer dated ________; andWHEREAS, Interconnection Customer desires to interconnect the Large Generating Facilitywith the <strong>Transmission</strong> System;WHEREAS, <strong>Transmission</strong> Provider has completed an Interconnection System Impact Study(the "System Impact Study") and provided the results of said study to Interconnection Customer;andWHEREAS, Interconnection Customer has requested <strong>Transmission</strong> Provider to perform anInterconnection Facilities Study to specify and estimate the cost of the equipment, engineering,procurement and construction work needed to implement the conclusions of the InterconnectionSystem Impact Study in accordance with Good Utility Practice to physically and electricallyconnect the Large Generating Facility to the <strong>Transmission</strong> System.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.1 - 57 -6216529.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!