13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.0 The scope of the Interconnection System Impact Study shall be subject to theassumptions set forth in Attachment A to this Agreement.4.0 The Interconnection System Impact Study will be based upon the results of theInterconnection Feasibility Study and the technical information provided byInterconnection Customer in the Interconnection Request, subject to any modifications inaccordance with Section 4.4 of the LGIPSGIP. <strong>Transmission</strong> Provider reserves the rightto request additional technical information from Interconnection Customer as mayreasonably become necessary consistent with Good Utility Practice during the course ofthe Interconnection Customer System Impact Study. If Interconnection Customermodifies its designated Point of Interconnection, Interconnection Request, or thetechnical information provided therein is modified, the time to complete theInterconnection System Impact Study may be extended.5.0 The Interconnection System Impact Study report shall provide the following information:−−−−identification of any circuit breaker short circuit capability limits exceeded as aresult of the interconnection;identification of any thermal overload or voltage limit violations resulting fromthe interconnection;identification of any instability or inadequately damped response to systemdisturbances resulting from the interconnection; anddescription and non-binding, good faith estimated cost of facilities required tointerconnect the Large Generating Facility to the <strong>Transmission</strong> System and toaddress the identified short circuit, instability, and power flow issues.6.0 Interconnection Customer shall provide a deposit of $50,00075,000 for the performanceof the Interconnection System Impact Study. <strong>Transmission</strong> Provider's good faith estimatefor the time of completion of the Interconnection System Impact Study is [insert date].Upon receipt of the Interconnection System Impact Study, <strong>Transmission</strong> Provider shallcharge and Interconnection Customer shall pay the actual costs of the InterconnectionSystem Impact Study .Any difference between the deposit and the actual cost of the study shall be paid by orrefunded to Interconnection Customer, as appropriate.7.0 If Interconnection Customer elects to proceed with an Interconnection Facilities Studyconsistent with Section 8.2 of the SGIP, <strong>Transmission</strong> Provider shall cause anInterconnection Facilities Study consistent with Section 8 of the SGIP to be performed inaccordance with the Tariff.8.0 The scope of the Interconnection Facilities Study shall be subject to the assumptions setforth in Attachment B and the data provided in Attachment C to this Agreement.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 54 54-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!