13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPENDIX 3 to LGIPINTERCONNECTION SYSTEM IMPACTSGIPCOMBINED STUDY AGREEMENTTABLE OF CONTENTSPageTHIS AGREEMENT is made and entered into this ____ day of ________, 20___ by andbetween ___________________, a ______________organized and existing under the laws of theStateProvince of _________________, ("Interconnection Customer,") and_______________________, a ________________BRITISH COLUMBIA TRANSMISSIONCORPORATION, a Crown corporation existing under the laws of the State of____________________Province of British Columbia, ("<strong>Transmission</strong> Provider").Interconnection Customer and <strong>Transmission</strong> Provider each may be referred to as a "Party," orcollectively as the "Parties."RECITALSWHEREAS, Interconnection Customer is proposing to develop a Large Generating Facility orgenerating capacity addition to an existing Generating Facility consistent with theInterconnection Request submitted by Interconnection Customer dated __________; andWHEREAS, Interconnection Customer desires to interconnect the Large Generating Facilitywith the <strong>Transmission</strong> System;WHEREAS, <strong>Transmission</strong> Provider has completed an Interconnection Feasibility Study (the"Feasibility Study") and provided the results of said study to Interconnection Customer (Thisrecital to be omitted if <strong>Transmission</strong> Provider does not require the Interconnection FeasibilityStudy); andWHEREAS, Interconnection Customer has requested <strong>Transmission</strong> Provider to perform anInterconnection System Impact Study to assess the impact of interconnecting the LargeGenerating Facility to the <strong>Transmission</strong> System, and of any Affected Systems; andWHEREAS, Interconnection Customer has requested <strong>Transmission</strong> Provider to perform anInterconnection Facilities Study to specify and estimate the cost of the equipment, engineering,procurement and construction work needed to implement the conclusions of the InterconnectionSystem Impact Study in accordance with Good Utility Practice to physically and electricallyconnect the Generating Facility to the <strong>Transmission</strong> System.NOW, THEREFORE, in consideration of and subject to the mutual covenants contained hereinthe Parties agreed as follows:1.0 When used in this Agreement, with initial capitalization, the terms specified shall havethe meanings indicated in <strong>Transmission</strong> Provider's FERC-approved LGIP.the SGIP.2.0 Interconnection Customer elects and <strong>Transmission</strong> Provider shall cause to be performedan Interconnection System Impact Study consistent with Section 7.0 7 of this LGIP inaccordance with the TariffSGIP.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.1 - 53 -6216529.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!