13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE OF CONTENTSPageAPPENDIX 2 to LGIPSGIPINTERCONNECTION FEASIBILITY STUDY AGREEMENTTHIS AGREEMENT is made and entered into this ___ day of _________, 20___ by andbetween ____________________________, a _____________________ organized and existingunder the laws of the StateProvince of __________________, ("Interconnection Customer,") and_____________________, a __________________”) and BRITISH COLUMBIATRANSMISSION CORPORATION, a Crown corporation existing under the laws of the Stateof __________________Province of British Columbia, ("<strong>Transmission</strong> Provider").Interconnection Customer and <strong>Transmission</strong> Provider each may be referred to as a "Party," orcollectively as the "Parties."RECITALSWHEREAS, Interconnection Customer is proposing to develop a Large Generating Facility orgenerating capacity addition to an existing Generating Facility consistent with theInterconnection Request submitted by Interconnection Customer dated ___________; andWHEREAS, Interconnection Customer desires to interconnect the Large Generating Facilitywith the <strong>Transmission</strong> System; andWHEREAS, Interconnection Customer has requested <strong>Transmission</strong> Provider to perform anInterconnection Feasibility Study to assess the feasibility of interconnecting the proposed LargeGenerating Facility to the <strong>Transmission</strong> System, and of any Affected Systems;NOW, THEREFORE, in consideration of and subject to the mutual covenants contained hereinthe Parties agreed as follows:1.0 When used in this Agreement, with initial capitalization, the terms specified shall havethe meanings indicated in <strong>Transmission</strong> Provider's FERC-approved LGIP.the SGIP.2.0 Interconnection Customer elects and <strong>Transmission</strong> Provider shall cause to be performedan Interconnection Feasibility Study consistent with Section 6.0 6 of this LGIP inaccordance with the TariffSGIP.3.0 The scope of the Interconnection Feasibility Study shall be subject to the assumptions setforth in Attachment A to this Agreement.4.0 The Interconnection Feasibility Study shall be based on the technical informationprovided by Interconnection Customer in the Interconnection Request, as may bemodified as the result of the Scoping Meeting. <strong>Transmission</strong> Provider reserves the rightto request additional technical information from Interconnection Customer as mayreasonably become necessary consistent with Good Utility Practice during the course ofthe Interconnection Feasibility Study and as designated in accordance with Section 3.3.4of the LGIPSGIP. If, after the designation of the Point of Interconnection pursuant toSection 3.3.4 of the LGIPSGIP, Interconnection Customer modifies its InterconnectionDM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.1 - 49 -6216529.6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!