13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10.2 Scope of Optional Interconnection Study.The Optional Interconnection Study will consist of a sensitivity analysis based on theassumptions specified by Interconnection Customer in the Optional InterconnectionStudy Agreement. The Optional Interconnection Study will also identify <strong>Transmission</strong>Provider's Interconnection Facilities and the Network Upgrades, and the estimated costthereof, that may be required to provide transmission service or Interconnection Servicebased upon the results of the Optional Interconnection Study. The OptionalInterconnection Study shall be performed solely for informational purposes.<strong>Transmission</strong> Provider shall use Reasonable Efforts to coordinate the study with anyAffected Systems that may be affected by the types of Interconnection Services that arebeing studied. <strong>Transmission</strong> Provider shall utilize existing studies to the extentpracticable in conducting the Optional Interconnection Study.10.3 Optional Interconnection Study Procedures.The executed Optional Interconnection Study Agreement, the prepayment, and technicaland other data called for therein must be provided to <strong>Transmission</strong> Provider within ten(10) Business Days of Interconnection Customer receipt of the Optional InterconnectionStudy Agreement. <strong>Transmission</strong> Provider shall use Reasonable Efforts to complete theOptional Interconnection Study within a mutually agreed upon time period specifiedwithin the Optional Interconnection Study Agreement. If <strong>Transmission</strong> Provider isunable to complete the Optional Interconnection Study within such time period, it shallnotify Interconnection Customer and provide an estimated completion date and anexplanation of the reasons why additional time is required. Any difference between thestudy payment and the actual cost of the study shall be paid to <strong>Transmission</strong> Provider orrefunded to Interconnection Customer, as appropriate. Upon request, <strong>Transmission</strong>Provider shall provide Interconnection Customer supporting documentation andworkpapers and databases or data developed in the preparation of the OptionalInterconnection Study, subject to confidentiality arrangements consistent withSection 13.1.Section 11.Standard Large Generator Interconnection Agreement (LGIASGIA)11.1 Tender.Interconnection Customer shall tender comments on the draft Interconnection FacilitiesStudy Reportreport within thirty (30) Calendar Days of receipt of the report. Withinthirty (30) Calendar Days after the comments are submitted, InterconnectionCustomer<strong>Transmission</strong> Provider shall tender a draft LGIASGIA, together with draftappendices completed to the extent practicable. The draft LGIA shall be in the form of<strong>Transmission</strong> Provider's FERC-approved standard form LGIA, which is in <strong>Appendix</strong> 6.Interconnection Customer shall execute and return the completed draft appendices withinthirty (30) Calendar Days.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 29 29-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!