13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

case of Clustering, the Interconnection System Impact Study will also consider all otherInterconnection Requests to be studied concurrently pursuant to Section 4.2.The Interconnection System Impact Study will consist of a short circuit analysis, astability analysis, and a power flow analysis. The Interconnection System Impact Studywill state the assumptions upon which it is based; state the results of the analyses; andprovide the requirements or potential impediments to providing the requestedinterconnection serviceInterconnection Service, including a preliminary indication of thecost and length of time that would be necessary to correct any problems identified inthose analyses and implement the interconnection. The Interconnection System ImpactStudy will provide a list of facilities that are required as a result of the InterconnectionRequest and a non-binding good faith estimate of cost responsibility (including anyamounts that Interconnection Customer may have to pay pursuant to Section 11.3.1 of theSGIA) and a non-binding good faith estimated time to construct.7.4 Interconnection System Impact Study Procedures.<strong>Transmission</strong> Provider shall coordinate the Interconnection System Impact Study withany Affected System that is affected by the Interconnection Request pursuant toSection 3.5 above. <strong>Transmission</strong> Provider shall utilize existing studies to the extentpracticable when it performs the study. <strong>Transmission</strong> Provider shall use ReasonableEfforts to complete the Interconnection System Impact Study within ninety (90) CalendarDays after the receipt of the Interconnection System ImpactCombined Study Agreementor notification to proceed, study payment, and technical data. If <strong>Transmission</strong> Provideruses Clustering, <strong>Transmission</strong> Provider shall use Reasonable Efforts to deliver acompleted Interconnection System Impact Study within ninety (90) Calendar Days afterthe close of the Queue Cluster Window.At the request of Interconnection Customer or at any time <strong>Transmission</strong> Providerdetermines that it will not meet the required time frame for completing theInterconnection System Impact Study, <strong>Transmission</strong> Provider shall notify InterconnectionCustomer as to the schedule status of the Interconnection System Impact Study. If<strong>Transmission</strong> Provider is unable to complete the Interconnection System Impact Studywithin the time period, it shall notify Interconnection Customer and provide an estimatedcompletion date with an explanation of the reasons why additional time is required.Upon request, <strong>Transmission</strong> Provider shall provide Interconnection Customer allsupporting documentation, workpapers and relevant pre-Interconnection Request andpost-Interconnection Request power flow, short circuit and stability databases for theInterconnection System Impact Study, subject to confidentiality arrangements consistentwith Section 13.1.7.5 Meeting with <strong>Transmission</strong> Provider.WithinAt Interconnection Customer’s request, within ten (10) Business Days ofproviding an Interconnection System Impact Study report to Interconnection Customer,<strong>Transmission</strong> Provider and Interconnection Customer shall meet to discuss the results ofthe Interconnection System Impact Study.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 24 24-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!