13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

contemplated by Section 6.4, or if Interconnection Customer requests no such meeting,within three (3) Business Days of the deadline established pursuant to these SGIP forsuch meeting, <strong>Transmission</strong> Provider shall provide to Interconnection Customer a nonbindinggood faith estimate of the cost and timeframe for completing the InterconnectionSystem Impact Study.7.2 Execution of Interconnection System ImpactCombined Study Agreement.Interconnection Customer shall execute the Interconnection System Impact StudyAgreement and deliver the executed Interconnection System ImpactCombined StudyAgreement to <strong>Transmission</strong> Provider no later than thirty (30) Calendar Days after itsreceipt along with demonstration of Site Control, and a $50,00075,000 deposit.If Interconnection Customer does not provide all such technical data required by theCombined Study Agreement when it delivers the Interconnection System ImpactexecutedCombined Study Agreement to <strong>Transmission</strong> Provider, <strong>Transmission</strong> Provider shallnotify Interconnection Customer of the deficiency within five (5) Business Days of thereceipt of the executed Interconnection System ImpactCombined Study Agreement andInterconnection Customer shall cure the deficiency within ten (10) Business Days ofreceipt of the notice, provided, however, such deficiency does not include failure todeliver the executed Interconnection System ImpactCombined Study Agreement ordeposit. If the Interconnection System Impact Study uncovers any unexpected result(s)not contemplated during the Scoping Meeting and the Interconnection Feasibility Study,a substitute Point of Interconnection identified by either Interconnection Customer or<strong>Transmission</strong> Provider, and acceptable to the other, such acceptance not to beunreasonably withheld, will be substituted for the designated Point of Interconnectionspecified above without loss of Queue Position, and restudies shall be completedpursuant to Section 7.6 as applicable. For the purpose of this Section 7.6, if <strong>Transmission</strong>Provider and Interconnection Customer cannot agree on the substituted Point ofInterconnection, then Interconnection Customer may direct that one of the alternatives asspecified in the Interconnection Feasibility Study Agreement, as specified pursuant toSection 3.3.4, shall be the substitute.7.3 Scope of Interconnection System Impact Study.The Interconnection System Impact Study shall evaluate the impact of the proposedinterconnection on the reliability of the <strong>Transmission</strong> System. The InterconnectionSystem Impact Study will consider the Base Case as well as all generating facilities (andwith respect to (iii) below, any identified Network Upgrades associated with such higherqueued interconnection) that, on the date the Interconnection System Impact Study iscommenced: (i) are directly interconnected to the <strong>Transmission</strong> System; (ii) areinterconnected to Affected Systems and may have an impact on the InterconnectionRequest; (iii) have a pending higher queued Interconnection Request to interconnect tothe <strong>Transmission</strong> System; and (iv) have no Queue Position but havefor which there is anexecuted an LGIA or requested thatinterconnection agreement or an unexecuted LGIA befiled with FERC.interconnection agreement has been filed with the Commission. In theDM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 23 23-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!