13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Feasibility Study Agreement signed by <strong>Transmission</strong> Provider, which includes a goodfaith estimate of the cost for complet ing the Interconnection Feasibility Study.Interconnection Customer shall execute and deliver to <strong>Transmission</strong> Provider theInterconnection Feasibility Study Agreement along with a $10,00015,000 deposit no laterthan thirty (30) Calendar Days after its receipt.On or before the return of the executed Interconnection Feasibility Study Agreement to<strong>Transmission</strong> Provider, Interconnection Customer shall provide the technical data calledfor in <strong>Appendix</strong> 1, Attachment A.If the Interconnection Feasibility Study uncovers any unexpected result(s) notcontemplated during the Scoping Meeting, a substitute Point of Interconnection identifiedby either Interconnection Customer or <strong>Transmission</strong> Provider, and acceptable to theother, such acceptance not to be unreasonably withheld, will be substituted for thedesignated Point of Interconnection specified above without loss of Queue Position, andRere-studies shall be completed pursuant to Section 6.46.5 as applicable.For the purpose of this Section 6.1, if <strong>Transmission</strong> Provider and InterconnectionCustomer cannot agree on the substituted Point of Interconnection, then InterconnectionCustomer may direct that one of the alternatives as specified in the InterconnectionFeasibility Study Agreement, as specified pursuant to Section 3.3.4, shall be thesubstitute.If Interconnection Customer and <strong>Transmission</strong> Provider agree to forgo theInterconnection Feasibility Study, <strong>Transmission</strong> Provider will initiate an InterconnectionSystem Impact Study under Section 7 of this LGIPSGIP and apply the $10,00015,000deposit towards the Interconnection System Impact Study.6.2 Scope of Interconnection Feasibility Study.The Interconnection Feasibility Study shall preliminarily evaluate the feasibility of theproposed interconnection to the <strong>Transmission</strong> System.The Interconnection Feasibility Study will consider the Base Case as well as allgenerating facilities (and with respect to (iii), any identified Network Upgrades) that, onthe date the Interconnection Feasibility Study is commenced: (i) are directlyinterconnected to the <strong>Transmission</strong> System; (ii) are interconnected to Affected Systemsand may have an impact on the Interconnection Request; (iii) have a pending higherqueued Interconnection Request to interconnect to the <strong>Transmission</strong> System; and (iv)have no Queue Position but have executed an LGIAinterconnection agreement orrequested that an unexecuted LGIA beinterconnection agreement has been filed withFERCthe Commission. The Interconnection Feasibility Study will consist of a powerflow and short circuit analysis. The Interconnection Feasibility Study will provide a listof facilities and a non-binding good faith estimate of cost responsibility and a nonbindinggood faith estimated time to construct.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 21 21-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!