13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

extended by a period equal to the time period between receipt of such notice or requestand the date on which all additional studies are completed.4.4.5 Extensions of Commercial Operation Date4.4.5 Extensions of less than three (3) cumulative years in the Commercial OperationDate of the Large Generating Facility to which the Interconnection Request relates arenot material and should be handled through construction sequencing; provided, however,that extensions may necessitate a determination of whether the Generating Facility willretain its WECC accepted rating status and whether additional studies are requiredpursuant to the Applicable Reliability Standards.Section 5.Procedures for Interconnection Requests Submitted Prior to Effective Dateof Standard Large Generator Interconnection Procedures.5.1 Queue Position for Pending Requests.5.1.1 Any Interconnection Customer assigned a Queue Position prior to the effectivedate of this LGIP shall retain that Queue Position.5.1.1 5.1.1.1. If an Interconnection Study AgreementCustomer has not beenexecuted an interconnection impact study agreement with <strong>Transmission</strong>Provider as of the effective date of this LGIP, then such Interconnection Study,and any subsequent Interconnection Studies,SGIP, then all interconnectionstudies shall be processed in accordance with this LGIPSGIP.5.1.2 5.1.1.2. If an Interconnection Study AgreementCustomer has been executed aninterconnection system impact study agreement with <strong>Transmission</strong> Providerprior to the effective date of this LGIPSGIP, such InterconnectionStudyinterconnection study shall be completed in accordance with the terms ofsuch agreement. With respect to any remaining studies for which anInterconnection Customer has not signed an Interconnection StudyAgreementa study agreement prior to the effective date of the LGIPSGIP,<strong>Transmission</strong> Provider must offer Interconnection Customer the option ofeither continuing under <strong>Transmission</strong> Provider's existing interconnection studyprocess or going forward with the completion of the necessary InterconnectionStudies (for which it does not have a signed Interconnection StudiesAgreement) in accordance with this LGIPSGIP.5.1.3 5.1.1.3. If an LGIAinterconnection agreement has been submitted to FERC forapprovalexecuted before the effective date of the LGIPSGIP, then theLGIAinterconnection agreement would be grandfathered.5.2 5.1.2 Transition Period.To the extent necessary, <strong>Transmission</strong> Provider and Interconnection Customers with anoutstanding request (i.e., an Interconnection Requestinterconnection request for which anLGIA interconnection agreement has not been submitted to FERC for approvalexecutedDM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 19 19-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!