13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.3 Base Case Data.<strong>Transmission</strong> Provider shall provide base power flow, short circuit and stabilitydatabases, including all underlying assumptions, and contingency list upon requestsubject to confidentiality provisions in LGIPSGIP Section 13.1. <strong>Transmission</strong> Provideris permitted to require that Interconnection Customer sign a confidentiality agreementbefore the release of commercially sensitive information or Critical Energy InfrastructureInformation in the Base Case data. Such databases and lists, hereinafter referred to asBase Cases, shall include all (1) generation projects and (ii) transmission projects,including merchant transmission projects that are proposed for the <strong>Transmission</strong> Systemfor which a transmission expansion plan has been submitted and approved by theapplicable authorityCommission.2.4 No Applicability to <strong>Transmission</strong> Service.Nothing in this LGIPSGIP shall constitute a request for transmission service or conferupon an Interconnection Customer any right to receive transmission service.Section 3.Interconnection Requests.3.1 General.An Interconnection Customer shall submit to <strong>Transmission</strong> Provider an InterconnectionRequest in the form of <strong>Appendix</strong> 1 to this LGIP and a refundable deposit of $10,000.<strong>Transmission</strong> Provider shall apply the deposit toward the cost of an InterconnectionFeasibility StudySGIP. Interconnection Customer shall submit a separate InterconnectionRequest for each site and may submit multiple Interconnection Requests for a single site.Interconnection Customer must submit a deposit with each Interconnection Request evenwhen more than one request is submitted for a single site. An Interconnection Request toevaluate one site at two different voltage levels shall be treated as two InterconnectionRequests.At Interconnection Customer's option, <strong>Transmission</strong> Provider and InterconnectionCustomer will identify alternative Point(s) of Interconnection and configurations at theScoping Meeting to evaluate in this process and attempt to eliminate alternatives in areasonable fashion given resources and information available. Interconnection Customerwill select the definitive Point(s) of Interconnection to be studied no later than theexecution of the Interconnection Feasibility Study Agreement.3.2 Identification of Types of Interconnection Services.At the time the Interconnection Request is submitted, Interconnection Customer mustrequest either Energy Resource Interconnection Service or Network ResourceInterconnection Service, as described; provided, however, any Interconnection Customerrequesting Network Resource Interconnection Service may, at any time before orconcurrent with the delivery of notice to proceed with an Interconnection Facilities Studypursuant to Section 8.2, also request that it be concurrently studied for Energy ResourceInterconnection Service, up to the point when an Interconnection Facility StudyDM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 10 10-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!