13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Reasonable Efforts shall mean, with respect to an action required to be attempted ortaken by a Party under the Standard Large Generator Interconnection Agreement, efforts that aretimely and consistent with Good Utility Practice and are otherwise substantially equivalent tothose a Party would use to protect its own interests.Reliability Management System or RMS shall mean WECC’s reliability criteria,agreements, data collection requirements and terms and conditions set forth in WECC’sreliability compliance programs and agreements as in effect from time to time. <strong>Appendix</strong> F tothe SGIA is the RMS Agreement required by WECC.Scoping Meeting shall mean the meeting between representatives of the InterconnectionCustomer and <strong>Transmission</strong> Provider conducted for the purpose of discussing alternativeinterconnection options, to exchange information including any transmission data and earlierstudy evaluations that would be reasonably expected to impact such interconnection options, toanalyze such information, and to determine the potential feasible Points of Interconnection.Site Control shall mean documentation reasonably demonstrating: (1) ownership of, aleasehold interest in, or a right to develop a site for the purpose of constructing the GeneratingFacility; (2) an option to purchase or acquire a leasehold site for such purpose; or (3) anexclusivity or other business relationship between Interconnection Customer and the entityhaving the right to sell, lease or grant Interconnection Customer the right to possess or occupy asite for such purpose.Small Generating Facility shall mean a Generating Facility that has a GeneratingFacility Capacity of no more than 20 MW.Stand Alone Network Upgrades shall mean Network Upgrades that an InterconnectionCustomer may construct without affecting day-to-day operations of the <strong>Transmission</strong> Systemduring their construction. Both the <strong>Transmission</strong> Provider and the Interconnection Customermust agree as to what constitutes Stand Alone Network Upgrades and identify them in<strong>Appendix</strong> A to the Standard Large Generator Interconnection Agreement.Standard Large Generator Interconnection Agreement (LGIASGIA) shall mean theform of interconnection agreement applicable to an Interconnection Request pertaining to aLarge Generating Facility, that is included in the <strong>Transmission</strong> Provider's Tariff.Standard Large Generator Interconnection Procedures (LGIPSGIP) shall mean theinterconnection procedures applicable to an Interconnection Request pertaining to a LargeGenerating Facility that are included in the <strong>Transmission</strong> Provider's Tariff.System Protection Facilities shall mean the equipment, including necessary protectionsignal communications equipment, required to protect (1) the <strong>Transmission</strong> Provider’s<strong>Transmission</strong> System from faults or other electrical disturbances occurring at the GeneratingFacility and (2) the Generating Facility from faults or other electrical system disturbancesoccurring on the <strong>Transmission</strong> Provider’s <strong>Transmission</strong> System or on other delivery systems orother generating systems to which the <strong>Transmission</strong> Provider’s <strong>Transmission</strong> System is directlyconnected.DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 8 8-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!