Article 23Article 23. . Environmental Releases23.1 Notice of Release. Each Party shall notify the other Party, first orally and then inwriting, of the release of any Hazardous Substances, any asbestos or lead abatementactivities, or any type of remediation activities related to the Large Generating Facility orthe Interconnection Facilities, each of which may reasonably be expected to affect theother Party. The notifying Party shall: (i) provide the notice as soon as practicable,provided such Party makes a good faith effort to provide the notice no later than twentyfourhours after such Party becomes aware of the occurrence; and (ii) promptly furnish tothe other Party copies of any publicly available reports filed with any GovernmentalAuthorities addressing such events.Article 24Article 24. . Information Requirements24.1 Information Acquisition. <strong>Transmission</strong> Provider and Interconnection Customer shallsubmit specific information regarding the electrical characteristics of their respectivefacilities to each other as described below and in accordance with Applicable ReliabilityStandards.24.2 Information Submission by <strong>Transmission</strong> Provider. The initial informationsubmission by <strong>Transmission</strong> Provider shall occur no later than one hundred eighty (180)Calendar Days prior to Trial Operation and shall include <strong>Transmission</strong> Systeminformation necessary to allow Interconnection Customer to select equipment and meetany system protection and stability requirements, unless otherwise agreed to by theParties. On a monthly basis <strong>Transmission</strong> Provider shall provide InterconnectionCustomer a status report on the construction and installation of <strong>Transmission</strong> Provider'sInterconnection Facilities and Network Upgrades, including, but not limited to, thefollowing information: (1) progress to date; (2) a description of the activities since thelast report; (3) a description of the action items for the next period; and (4) the deliverystatus of equipment ordered.24.3 Updated Information Submission by Interconnection Customer. The updatedinformation submission by Interconnection Customer, including manufacturerinformation, shall occur no later than one hundred eighty (180) Calendar Days prior tothe Trial Operation. Interconnection Customer shall submit a completed copy of theLarge Generating Facility data requirements contained in <strong>Appendix</strong> 1 to the LGIPSGIP.It shall also include any additional information provided to <strong>Transmission</strong> Provider for theInterconnection Feasibility Study and Interconnection Facilities Study. Information inthis submission shall be the most current Large Generating Facility design or expectedperformance data. Information submitted for stability models shall be compatible with<strong>Transmission</strong> Provider standard models. If there is no compatible model, InterconnectionCustomer will work with a consultant mutually agreed to by the Parties to develop andsupply a standard model and associated information.If Interconnection Customer's data is materially different from what was originallyprovided to <strong>Transmission</strong> Provider pursuant to the InterconnectionCombined StudyAgreement between <strong>Transmission</strong> Provider and Interconnection Customer, then- 57 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!