13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

13.6 Interconnection Customer Authority. Consistent with Good Utility Practice and theLGIASGIA and the LGIPSGIP, Interconnection Customer may take actions or inactionswith regard to the Large Generating Facility or Interconnection Customer'sInterconnection Facilities during an Emergency Condition in order to (i) preserve publichealth and safety, (ii) preserve the reliability of the Large Generating Facility orInterconnection Customer's Interconnection Facilities, (iii) limit or prevent damage, and(iv) expedite restoration of service. Interconnection Customer shall use ReasonableEfforts to minimize the effect of such actions or inactions on the <strong>Transmission</strong> Systemand <strong>Transmission</strong> Provider's Interconnection Facilities. <strong>Transmission</strong> Provider shall useReasonable Efforts to assist Interconnection Customer in such actions.13.7 Limited Liability. Except as otherwise provided in Article 11.6.1 of this LGIASGIA,neither Party shall be liable to the other for any action it takes in responding to anEmergency Condition so long as such action is made in good faith and is consistent withGood Utility Practice.Article 14Article 14. . Regulatory Requirements and Governing Law14.1 Regulatory Requirements. Each Party's obligations under this LGIASGIA shall besubject to its receipt of any required approval or certificate from one or moreGovernmental Authorities in the form and substance satisfactory to the applying Party, orthe Party making any required filings with, or providing notice to, such GovernmentalAuthorities, and the expiration of any time period associated therewith. Each Party shallin good faith seek and use its Reasonable Efforts to obtain such other approvals. Nothingin this LGIASGIA shall require Interconnection Customer to take any action that couldresult in its inability to obtain, or its loss of, status or exemption under the Federal PowerAct, the Public Utility Holding Company Act of 1935, as amended, or the Public UtilityRegulatory Policies Act of 1978.14.2 Governing Law.14.2.1 The validity, interpretation and performance of this LGIASGIA and each of itsprovisions shall be governed by the laws of the state where the Point ofInterconnection is locatedBritish Columbia, without regard to its conflicts oflaw principles.14.2.2 This LGIASGIA is subject to all Applicable Laws and Regulations.14.2.3 Each Party expressly reserves the right to seek changes in, appeal, or otherwisecontest any laws, orders, rules, or regulations of a Governmental Authority.Article 15Article 15. . Notices15.1 General. Unless otherwise provided in this LGIASGIA, any notice, demand or requestrequired or permitted to be given by either Party to the other and any instrument requiredor permitted to be tendered or delivered by either Party in writing to the other shall beeffective when delivered and may be so given, tendered or delivered, by recognizednational courier, or by depositing the same with the United States Postal ServiceCanada- 47 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!