13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Customer, in accordance with Applicable Laws and Regulations or upon someother mutually-agreed upon methodology. In addition, cost responsibility forongoing costs, including operation and maintenance costs associated with the<strong>Transmission</strong> Provider’s Interconnection Facilities, will be allocated betweenInterconnection Customer and any third party users based upon the pro rata useof the Interconnection Facilities by <strong>Transmission</strong> Provider, all third partyusers, and Interconnection Customer, in accordance with Applicable Laws andRegulations or upon some other mutually agreed upon methodology. If theissue of such compensation or allocation cannot be resolved through suchnegotiations, it shall be submitted to FERCthe Commission for resolution.9.10 Disturbance Analysis Data Exchange. The Parties will cooperate with one another inthe analysis of disturbances to either the Large Generating Facility or <strong>Transmission</strong>Provider's <strong>Transmission</strong> System by gathering and providing access to any informationrelating to any disturbance, including information from oscillography, protective relaytargets, breaker operations and sequence of events records, and any disturbanceinformation required by Good Utility Practice.Article 10Article 10. . Maintenance10.1 <strong>Transmission</strong> Provider Obligations. <strong>Transmission</strong> Provider shall maintain the<strong>Transmission</strong> System and <strong>Transmission</strong> Provider's Interconnection Facilities in a safeand reliable manner and in accordance with this LGIASGIA.10.2 Interconnection Customer Obligations. Interconnection Customer shall maintain theLarge Generating Facility and Interconnection Customer's Interconnection Facilities in asafe and reliable manner and in accordance with this LGIASGIA.10.3 Coordination. The Parties shall confer regularly to coordinate the planning, schedulingand performance of preventive and corrective maintenance on the Large GeneratingFacility and the Interconnection Facilities.10.4 Secondary Systems. Each Party shall cooperate with the other in the inspection,maintenance, and testing of control or power circuits that operate below 600 volts, AC orDC, including, but not limited to, any hardware, control or protective devices, cables,conductors, electric raceways, secondary equipment panels, transducers, batteries,chargers, and voltage and current transformers that directly affect the operation of aParty's facilities and equipment which may reasonably be expected to impact the otherParty. Each Party shall provide advance notice to the other Party before undertaking anywork on such circuits, especially on electrical circuits involving circuit breaker trip andclose contacts, current transformers, or potential transformers.10.5 Operating and Maintenance Expenses. Subject to the provisions herein addressing theuse of facilities by others, and except for operations and maintenance expenses associatedwith modifications made for providing interconnection or transmission service to a thirdparty and such third party pays for such expenses, Interconnection Customer shall beresponsible for all reasonable expenses including overheads, associated with: (1) owning,- 40 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!