Interconnection System Impact Study shall mean an engineering study that evaluatesthe impact of the proposed interconnection on the safety and reliability of <strong>Transmission</strong>Provider's <strong>Transmission</strong> System and, if applicable, an Affected System. The study shall identifyand detail the system impacts that would result if the Generating Facility were interconnectedwithout project modifications or system modifications, focusing on the Adverse System Impactsidentified in the Interconnection Feasibility Study, or to study potential impacts, including butnot limited to those identified in the Scoping Meeting as described in the Standard LargeGenerator Interconnection Procedures.Interconnection System Impact Study Agreement shall mean the form of agreementcontained in <strong>Appendix</strong> 3 of the Standard Large Generator Interconnection Procedures forconducting the Interconnection System Impact Study.IRS shall mean the Internal Revenue Service.Interest means interest calculated in accordance with Attachment K of the Tariff.Joint Operating Committee shall be a group made up of representatives fromInterconnection Customers and the <strong>Transmission</strong> Provider to coordinate operating and technicalconsiderations of Interconnection Service.Large Generating Facility shall mean a Generating Facility having a GeneratingFacility Capacity of more than 20 MW.Loss shall mean any and all losses relating to injury to or death of any person or damageto property, demand, suits, recoveries, costs and expenses, court costs, attorney fees, and allother obligations by or to third parties, arising out of or resulting from the other Party'sperformance, or non-performance of its obligations under the Standard Large GeneratorInterconnection Agreement on behalf of the indemnifying Party, except in cases of grossnegligence or intentional wrongdoing by the indemnifying Party.Material Modification shall mean those modifications that have a material impact on thecost or timing of any Interconnection Request with a later queue priority date. or that wouldaffect the reliability or stability of the <strong>Transmission</strong> System.Metering Equipment shall mean all metering equipment installed or to be installed atthe Generating Facility pursuant to the Standard Large Generator Interconnection Agreement atthe metering points, including but not limited to instrument transformers, MWh-meters, dataacquisition equipment, transducers, remote terminal unit, communications equipment, phonelines, and fiber optics.NERC shall mean the North American Electric Reliability Council or its successororganization.Network Resource shall mean any designated generating resource owned, purchased, orleased by a Network Customer under the Network Integration <strong>Transmission</strong> Service Tariff.Network Resources do not include any resource, or any portion thereof, that is committed forDM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00132/6213742.16216529.6 - 6 6-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!