13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

schedule such removal on a date and time mutually acceptable to theParties. In all circumstances any Party planning to remove suchfacility(ies) from service shall use Reasonable Efforts to minimizethe effect on the other Party of such removal. Neither Party shall beliable to the other for damages of any kind in connection with anysuch outage.9.7.1.2 Outage Schedules. <strong>Transmission</strong> Provider shall post scheduledoutages of its transmission facilities on the OASIS. InterconnectionCustomer shall submit its planned maintenance schedules for theLarge Generating Facility to <strong>Transmission</strong> Provider for a minimumof a rolling twenty-four month period. Interconnection Customershall update its planned maintenance schedules as necessary.<strong>Transmission</strong> Provider may request Interconnection Customer toreschedule its maintenance as necessary to maintain the reliability ofthe <strong>Transmission</strong> System; provided, however, adequacy ofgeneration supply shall not be a criterion in determining<strong>Transmission</strong> System reliability. <strong>Transmission</strong> Provider shallcompensate Interconnection Customer for any additional direct coststhat Interconnection Customer incurs as a result of having toreschedule maintenance, including any additional overtime,breaking of maintenance contracts or other costs above and beyondthe cost Interconnection Customer would have incurred absent<strong>Transmission</strong> Provider's request to reschedule maintenance.Interconnection Customer will not be eligible to receivecompensation, if during the twelve (12) months prior to the date ofthe scheduled maintenance, Interconnection Customer had modifiedits schedule of maintenance activities.9.7.1.3 Outage Restoration. If an outage on a Party's InterconnectionFacilities or Network Upgrades adverselyof a Party’s facility(ies)aversely affects the other Party's operations or facilities, the Partythat owns or controls the facility(ies) that is out of service shall useReasonable Efforts to promptly restore such facility(ies) to a normaloperating condition consistent with the nature of the outage. TheParty that owns or controls the facility that is out of service shallprovide the other Party, to the extent such information is known,information on the nature of the Emergency Condition, an estimatedtime of restoration, and any corrective actions required. Initialverbal notice shall be followed up as soon as practicable withwritten notice explaining the nature of the outage.9.7.2 Interruption of Service. If required by Good Utility Practice to do so,<strong>Transmission</strong> Provider may require Interconnection Customer to interrupt orreduce deliveries of electricity if such delivery of electricity could adverselyaffect <strong>Transmission</strong> Provider's ability to perform such activities as arenecessary to safely and reliably operate and maintain the <strong>Transmission</strong> System.- 36 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!