13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8.2 Remote Terminal Unit. Prior to the Initial Synchronization Date of the LargeGenerating Facility, a Remote Terminal Unit, or equivalent data collection and transferequipment acceptable to the Parties, shall be installed by Interconnection Customer, or by<strong>Transmission</strong> Provider at Interconnection Customer's expense, to gather accumulated andinstantaneous data to be telemetered to the location(s) designated by <strong>Transmission</strong>Provider through use of a dedicated point-to-point data circuit(s) as indicated inArticle 8.1. The communication protocol for the data circuit(s) shall be specified by<strong>Transmission</strong> Provider. Instantaneous bi-directional analog real power and reactivepower flow information must be telemetered directly to the location(s) specified by<strong>Transmission</strong> Provider. Reserved.Each Party will promptly advise the other Party if it detects or otherwise learns of anymetering, telemetry or communications equipment errors or malfunctions that require theattention and/or correction by the other Party. The Party owning such equipment shallcorrect such error or malfunction as soon as reasonably feasible.8.3 No Annexation. Any and all equipment placed on the premises of a Party shall be andremain the property of the Party providing such equipment regardless of the mode andmanner of annexation or attachment to real property, unless otherwise mutually agreed bythe Parties.Article 9Article 9. . Operations9.1 General. Each Party shall comply with the Applicable Reliability Council requirements.Each Party shall provide to the other Party all information that may reasonably berequired by the other Party to comply with Applicable Laws and Regulations andApplicable Reliability Standards. Subject to Section 2.9 of the RMS Provisions, theGenerator shall comply with the RMS Provisions.9.2 Control Area Notification. At least three months before Initial Synchronization Date,Interconnection Customer shall notify <strong>Transmission</strong> Provider in writing of the ControlArea in which the Large Generating Facility will be located. If Interconnection Customerelects to locate the Large Generating Facility in a Control Area other than the ControlArea in which the Large Generating Facility is physically located, and if permitted to doso by the relevant transmission tariffs, all necessary arrangements, including but notlimited to those set forth in Article 7. and Article 8. of this LGIA, and remote ControlArea generator interchange agreements, if applicable, and the appropriate measures undersuch agreements, shall be executed and implemented prior to the placement of the LargeGenerating Facility in the other Control Area.Reserved.9.3 <strong>Transmission</strong> Provider Obligations. <strong>Transmission</strong> Provider shall cause the<strong>Transmission</strong> System and <strong>Transmission</strong> Provider's Interconnection Facilities to beoperated, maintained and controlled in a safe and reliable manner and in accordance withall Operating Orders and this LGIASGIA. <strong>Transmission</strong> Provider may provide operatinginstructions to Interconnection Customer , and Interconnection Customer will complywith, operating instructions consistent with this LGIASGIA and <strong>Transmission</strong> Provider'soperating protocols and procedures as they may change from time to time. <strong>Transmission</strong>- 33 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!