or such shorter period upon which the Parties may agree, which agreementshall not unreasonably be withheld, conditioned or delayed.In the case of Large Generating Facility modifications that do not requireInterconnection Customer to submit an Interconnection Request, <strong>Transmission</strong>Provider shall provide, within thirty (30) Calendar Days (or such other time asthe Parties may agree), an estimate of any additional modifications to the<strong>Transmission</strong> System, <strong>Transmission</strong> Provider's Interconnection Facilities orNetwork Upgrades necessitated by such Interconnection Customermodification and a good faith estimate of the costs thereof.5.19.2 Standards. Any additions, modifications, or replacements made to a Party'sfacilities shall be designed, constructed and operated in accordance with thisLGIASGIA and Good Utility Practice.5.19.3 Modification Costs. Interconnection Customer shall not be directly assignedfor the costs of any additions, modifications, or replacements that<strong>Transmission</strong> Provider makes to <strong>Transmission</strong> Provider's InterconnectionFacilities or the <strong>Transmission</strong> System to facilitate the interconnection of a thirdparty to <strong>Transmission</strong> Provider's Interconnection Facilities or the <strong>Transmission</strong>System, or to provide transmission service to a third party under <strong>Transmission</strong>Provider's Tariff. Interconnection Customer shall be responsible for the costsof any additions, modifications, or replacements to Interconnection Customer'sInterconnection Facilities that may be necessary to maintain or upgrade suchInterconnection Customer's Interconnection Facilities consistent withApplicable Laws and Regulations, Applicable Reliability Standards or GoodUtility Practice.Article 6.Testing and Inspection6.1 Pre-Commercial Operation Date Testing and Modifications. Prior to the CommercialOperation Date, <strong>Transmission</strong> Provider shall test <strong>Transmission</strong> Provider's InterconnectionFacilities and Network Upgrades and Interconnection Customer shall test the LargeGenerating Facility and Interconnection Customer's Interconnection Facilities to ensuretheir safe and reliable operation. Similar testing may be required after initial operation.Each Party shall make any modifications to its facilities that are found to be necessary asa result of such testing. Interconnection Customer shall bear the cost of all such testingand modifications. Interconnection Customer shall generate test energy at the LargeGenerating Facility only if it has arranged for the delivery of such test energy.6.2 Post-Commercial Operation Date Testing and Modifications. Each Party shall at itsown expense perform routine inspection and testing of its facilities and equipment inaccordance with Good Utility Practice as may be necessary to ensure the continuedinterconnection of the Large Generating Facility with the <strong>Transmission</strong> System in a safeand reliable manner. Each Party shall have the right, upon advance written notice, torequire reasonable additional testing of the other Party's facilities, at the requestingParty's expense, as may be in accordance with Good Utility Practice.- 30 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!