Interconnection Customer shall make such changes to the ICIF as mayreasonably be required by <strong>Transmission</strong> Provider, in accordance with GoodUtility Practice, to ensure that the ICIF are compatible with the technicalspecifications (including the Technical Interconnection Requirements),operational control, and safety requirements of <strong>Transmission</strong> Provider.5.10.3 ICIF Construction. The ICIF shall be designed and constructed inaccordance with Good Utility Practice. Within one hundred twenty (120)Calendar Days after the Commercial Operation Date, unless the Parties agreeon another mutually acceptable deadline, Interconnection Customer shalldeliver to <strong>Transmission</strong> Provider "as-built" drawings, information anddocuments for the ICIF, such as: a one-line diagram, a site plan showing theLarge Generating Facility and the ICIF, plan and elevation drawings showingthe layout of the ICIF, a relay functional diagram, relaying AC and DCschematic wiring diagrams and relay settings for all facilities associated withInterconnection Customer's step-up transformers, the facilities connecting theLarge Generating Facility to the step-up transformers and the ICIF, and theimpedances (determined by factory tests) for the associated step-uptransformers and the Large Generating Facility. The Interconnection Customershall provide <strong>Transmission</strong> Provider specifications for the excitation system,automatic voltage regulator, Large Generating Facility control and protectionsettings, transformer tap settings, and communications, if applicable.5.11 <strong>Transmission</strong> Provider's Interconnection Facilities Construction. <strong>Transmission</strong>Provider's Interconnection Facilities shall be designed and constructed in accordance withGood Utility Practice. Upon request, and at Interconnection Customer’s cost, within onehundred twenty (120) Calendar Days after the Commercial Operation Date, unless theParties agree on another mutually acceptable deadline, <strong>Transmission</strong> Provider shalldeliver to Interconnection Customer the following "as-built" drawings, information anddocuments for <strong>Transmission</strong> Provider's Interconnection Facilities [include appropriatedrawings and relay diagrams].<strong>Transmission</strong> Provider will obtain control of <strong>Transmission</strong> Provider's InterconnectionFacilities and Stand Alone Network Upgrades upon completion of such facilities.5.12 Access Rights. Upon reasonable notice and supervision by a Party, and subject to anyrequired or necessary regulatory approvals, a Party ("Granting Party") shall furnish at nocost to the other Party ("Access Party") any rights of use, licenses, rights of way andeasements with respect to lands owned or controlled by the Granting Party, its agents (ifallowed under the applicable agency agreement), or any Affiliate, that are necessary toenable the Access Party to obtain ingress and egress to construct, operate, maintain,repair, test (or witness testing), inspect, replace or remove facilities and equipment to: (i)interconnect the Large Generating Facility with the <strong>Transmission</strong> System; (ii) operate andmaintain the Large Generating Facility, the Interconnection Facilities and the<strong>Transmission</strong> System; and (iii) disconnect or remove the Access Party's facilities andequipment upon termination of this LGIASGIA. In exercising such licenses, rights ofway and easements, the Access Party shall not unreasonably disrupt or interfere with- 22 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!