13.07.2015 Views

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

Appendix D - BC Hydro - Transmission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.4 Power System Stabilizers. The Interconnection Customer shall procure, install,maintain and operate Power System Stabilizers in accordance with the guidelines andprocedures established by the Applicable Reliability Council and as required by the RMSProvisions. <strong>Transmission</strong> Provider reserves the right to reasonably establish minimumacceptable settings for any installed Power System Stabilizers, subject to the design andoperating limitations of the Large Generating Facility. If the Large Generating Facility'sPower System Stabilizers are removed from service or not capable of automaticoperation, Interconnection Customer shall immediately notify <strong>Transmission</strong> Provider'ssystem operator, or its designated representative. The requirements of this paragraphshall not apply to wind generators.5.5 Equipment Procurement. If responsibility for construction of <strong>Transmission</strong> Provider'sInterconnection Facilities or Network Upgrades is to be borne by <strong>Transmission</strong> Provider,then <strong>Transmission</strong> Provider shall commence design of <strong>Transmission</strong> Provider'sInterconnection Facilities or Network Upgrades and procure necessary equipment as soonas practicable after all of the following conditions are satisfied, unless the Partiesotherwise agree in writing:5.5.1 <strong>Transmission</strong> Provider has completed the Interconnection Facilities Studypursuant to the FacilitiesCombined Study Agreement;5.5.2 <strong>Transmission</strong> Provider has received written authorization to proceed withdesign and procurement from Interconnection Customer by the date specifiedin <strong>Appendix</strong> B, Milestones; and5.5.3 Interconnection Customer has provided security to <strong>Transmission</strong> Provider inaccordance with Article 11.5 by the dates specified in <strong>Appendix</strong> B, Milestones.5.6 Construction Commencement. <strong>Transmission</strong> Provider shall commence construction of<strong>Transmission</strong> Provider's Interconnection Facilities and Network Upgrades for which it isresponsible as soon as practicable after the following additional conditions are satisfied:5.6.1 Approval of the appropriate Governmental Authority has been obtained for anyfacilities requiring regulatory approval;5.6.2 Necessary real property rights and rights-of-way have been obtained, to theextent required for the construction of a discrete aspect of <strong>Transmission</strong>Provider's Interconnection Facilities and Network Upgrades;5.6.3 <strong>Transmission</strong> Provider has received written authorization to proceed withconstruction from Interconnection Customer by the date specified in<strong>Appendix</strong> B, Milestones; and5.6.4 Interconnection Customer has provided security to <strong>Transmission</strong> Provider inaccordance with Article 11.5 by the dates specified in <strong>Appendix</strong> B, Milestones.5.7 Work Progress. The Parties will keep each other advised periodically as to the progressof their respective design, procurement and construction efforts. Either Party may, at any- 20 -DM_VAN/<strong>BC</strong>T0007-<strong>BC</strong>T00129/6206155.10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!